Planning Report For MAHAGUNPURAM Site Address: : MAHAGUNPURAM TOWER, NH24, GHAZIABAD Contact : Mr. GAURAV DWIVEDI -( Contact Person Vodafone : Mr. VIJAY NAMA ( ) Contact Person Hayat : JAGDISH KUMAR ( )
COORDINATES MAHAGUNPURAM
Survey Report An extensive technical survey was conducted at MAHAGUNPURAM VINAYAK TOWER to enhance the indoor signal strength. Building Height is G+19+Basement. As per the survey finding,we have designed a complete in-building coverage solution. The enclosed document gives details of the distributed antenna system, the exact antenna location, the cable routing, location of splitters, Couplers etc. The 33dbm Microcell is placed at the Terrace which is as indicated in the enclosed trunking diagram. The cable used ½” LDF Cable and 7/8” Feeder Cable which Runs through the false ceilings, ducts and electrical shafts and are well Concealed and supported with cable ties, clamps and saddles. Please Note- special permission has to be obtained in every floors for cutting false ceiling and routing cables after all work done ceiling has to be rebuilt. In the power budget calculation the signal level mentioned at the tip of each antenna are the final effective radiating power (EIRP) available at the end of the cable after the calculation of all losses of the components which are used in the solution MAHAGUNPURAM
Sl. No.DescriptionQty 1Low Loss Feeder Cable (1/2 ”) /2”N-male connector for 1/2” cable150 37/8” RF Cable (mtrs) /8” RF Cable N-Male connector350 5 Panel antenna80 6Indoor Omni antenna90 7Coupler 7 db15 8Coupler 10 dB- 9Weather Proof05 10Power splitter 3dB(2way)30 11Power Splitters 5dB(3way)50 12Power splitter 6dB(4way)20 13Jumper 1m M(N)-M(N)50 13Jumper 1/2m M(N)-F(N)40 14Dummy Load (20 w)02 15Cable tie02 BILL OF MATERIAL MAHAGUNPURAM
Coaxial Corrugated Cable Splitters Indoor Omni Antenna Coaxial Corrugated Cable Connectors Couplers Indoor Panel Antenna Product Picture MAHAGUNPURAM
Omni Antenna Panel Antenna ½” Coaxial Cable Shaft 7/8” Cable MOU & ROU MOU & ROU 1:2 Way Splitter 1:3 Way Splitter 1:4 Way Splitter 7dB Coupler 10 dB Coupler Terminator 15 dB Coupler Fiber Optic Cable Symbols Used in Floor Plan & Trunking Diagram MAHAGUNPURAM
19 TH Floor shaft Lift-1 Lift-2 Lobby Stairs Flat-1 Flat-2 Flat-3Flat-4 Flat-8Flat-7 Flat-6 Flat-5 Lobby A1 A2 A3 Ground To 19 th Floor Are Same
Basement Floor Lift-1 Lift-2 Plant Room In out Ganga Tower & Ridhi Tower Basement Parking Area A14 A15A16A13 A12A11 A9 A10 A8 A7 A6 A5 A4 A1 A2 A3
Basement Floor Lift-1 Lift-2 Plant Room In out Vidhi Tower & Sidhi Tower Basement Parking Area A14 A15A16A13 A12A11 A9 A10 A8 A7 A6 A5 A4 A1 A2 A3
Basement Floor Lift-1 Lift-2 Plant Room In out Bhagirathi Tower & Vinayak Tower Basement Parking Area A14 A15A16A13 A12A11 A9 A10 A8 A7 A6 A5 A4 A1 A2 A3
Terrace BTS Location
BTS For 19 th floor to Ground Floor 2 nd Sector 1 st Sector 3 rd Sector for IBS 3 rd sector For Basement Floor