MAHAGUNPURAM. Planning Report For MAHAGUNPURAM Site Address: : MAHAGUNPURAM TOWER, NH24, GHAZIABAD Contact : Mr. GAURAV DWIVEDI -(09711166769.

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
SYBER Repeater & Booster indoor repeater products specification
Wireless Networks Review Question.
CORN/09/014 v1.3 Cornerstone : Supporting Technical Information for O 2 & Vodafone : - Allied Textile, Huncoat Business Park, Accrington O 2 Site –
3G UMTS CELLULAR SIGNAL REPEATER/BOOSTERS SOLUTIONS FOR 3G LIMITED COVERAGES DURING INTIAL LAUNCH VALUE ADDED SOLUTIONS.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
G/05 Office G/06 Office G/07 Office G/09 Office lift G/10 office G/11 office Hazards Cleaning chemicals Acid, solvents G/08 Office SMC Office Block Ground.
WiFi Access Extension Solution Toplink C&C Corporation. May
1 Video, Voice, and Broadband Connectivity Solutions -1- MDU Networking using CORINEX products including the new 600 Mbps Corinex MDU Gateway!
Foundation Licence Feeders and Antennas. What they do Feeder: transfers RF current between a transceiver and antenna without radiating radio waves. (Hope.
iDAS Antennas Product Line Highlights
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
Cellular telecom networks. Coaxial Antenna Line 2 Introduction Waterproofing kits HYPERCELL ® Products offer all passive components between BTS and antennas.
Chapter 2 ELECTRICAL POWER SUPPLY AND DISTRIBUTION IN BUILDINGS
Based on Cisco Wireless Material
Power Budgeting in Distributed Systems.  Single transmitter signal distributed to two or more receivers via optical splitters Transmitter Receiver #1.
Summary of Path Loss in Propagation
ANITA SMEX Final Presentation 2-November RF front end P. Gorham UH A N I T A.
COST286 meeting Barcelona 14/15 April BUTE Part 1 Conducted and radiated disturbance regulations for PLC devices János Löcher; György Varjú BUTE.
Designing and Implementing Cabling Infrastructure Dr. Saif al Zahir King Fahd University of Petroleum & Minerals Computer Engineering Department Dr. Saif.
ESTeem Training Class Antenna Fundamentals. Decibels (dB) Used for all mathematical calculations in the radio world. – dB is a logarithmic number dB =10.
Confidential and Proprietary Proposal for optical fiber repeater based Wireless Network. (Wired Cell)
Fiber Optics MECHANICAL SPLICES.
Link Budget Calculation
© 2003, Cisco Systems, Inc. All rights reserved. FWL 1.0—7-1 Learning Objectives Define how an antenna is used to propagate an RF signal. Define basic.
NEWLINK  Wireless Equipment Copyrights 2004 w4 Cabling Systems NEWLINK.
1 For review question 10, you have a wireless bridge generating a 100 mW signal. The antenna cable and connectors create 3 dB of signal loss, and the antenna.
IDAS Solution Indoor Distribution Antenna System
AMMAR ENGINEERING SERVICES
Craig McCabe Jeff Archer
INTRUSION ALARM TECHNOLOGY
May Fiber Optic Technology Basics May 2008 WHY USE FIBER OPTICS?  Superior Signal Quality  Long Distance Signal Transmission  Protection from.
Installation Materials
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
Antennas for GSM System Contents Base station antenna specification and meanings Antenna types and trends.
7 Mini Mall Design. Connection Quick View Architectural view.
Fiber Optic Network Solutions. Aware of the growing optical fiber network market, TELE DESIGN has developed FiberDoc, a documentation system for this.
Indices – The Six Basic Index Laws 1 st Law 5 3 x 5 4 = (5 x 5 x 5) x (5 x 5 x 5 x 5)= 5 7 Example: aax=a + mnmn.
MU Condominium 5,000 Baht per month Maximum number of people per room: 3 (4 in case of a family) 2-bedroom (both large and small rooms) 3,000 Baht per.
Solutions for site Acquisition. As the number of sites grows, site acquisition becomes a greater issue. What can we do to face the following issues: 1-
COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
BILL OF MATERIALS AUTOMATION Adi Y. Nugroho June 22 nd, 2013 SYSM 6309: Advanced Requirements Engineering Summer 2013.
A-211 – Reflected Ceiling Plan, First Floor Building 1
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Passive Components and How They are Characterized Blaine Davidge Westell 4/8/161Copyright © 2016 | CIBET | All rights reserved.
COST OF DELIVERING CABLE TV SERVICES VIKKI CHOUDHRY National Cable & Telecommunications Association.
Main Campus is in Cedar Rapids, Iowa. Serving 7 Counties. WHERE IS KIRKWOOD COMMUNITY COLLEGE ?
For : PRABHAT DAIRY LIMITED. BIGMARK MEDIA DIGITAL MARKETING PROPOSAL.
Subject: audio video system Branch: electronics &communication
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
NSG 4070 Signal generator and immunity test system Dr. Heinrich
In-Building Northwestern University
N5 Building Switches (4500) in Ist Floor L3 In N4 Building
Presented by Eman Mahmoud Abeer Thawabi Supervised by Dr. Ahmed Masri
Supporting Technical Information for Vodafone : -
Installation-Troubleshooting-Maintenance
CH-6 CABLE TV.
CH-6 CABLE TV.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Where ideas are born, nurtured and grown!
A. Bill of materials B. Connector pinout C. Schematic D. Flow chart
Link Budget Analysis Date: Authors: November 2015
ELECTRICAL INSTALLATION
Products FM Radio Rebroadcast Unit– RFR-2J0 ]
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Cellular Systems.
Presentation transcript:

MAHAGUNPURAM

Planning Report For MAHAGUNPURAM Site Address: : MAHAGUNPURAM TOWER, NH24, GHAZIABAD Contact : Mr. GAURAV DWIVEDI -( Contact Person Vodafone : Mr. VIJAY NAMA ( ) Contact Person Hayat : JAGDISH KUMAR ( )

COORDINATES MAHAGUNPURAM

Survey Report An extensive technical survey was conducted at MAHAGUNPURAM VINAYAK TOWER to enhance the indoor signal strength. Building Height is G+19+Basement. As per the survey finding,we have designed a complete in-building coverage solution. The enclosed document gives details of the distributed antenna system, the exact antenna location, the cable routing, location of splitters, Couplers etc. The 33dbm Microcell is placed at the Terrace which is as indicated in the enclosed trunking diagram. The cable used ½” LDF Cable and 7/8” Feeder Cable which Runs through the false ceilings, ducts and electrical shafts and are well Concealed and supported with cable ties, clamps and saddles. Please Note- special permission has to be obtained in every floors for cutting false ceiling and routing cables after all work done ceiling has to be rebuilt. In the power budget calculation the signal level mentioned at the tip of each antenna are the final effective radiating power (EIRP) available at the end of the cable after the calculation of all losses of the components which are used in the solution MAHAGUNPURAM

Sl. No.DescriptionQty 1Low Loss Feeder Cable (1/2 ”) /2”N-male connector for 1/2” cable150 37/8” RF Cable (mtrs) /8” RF Cable N-Male connector350 5 Panel antenna80 6Indoor Omni antenna90 7Coupler 7 db15 8Coupler 10 dB- 9Weather Proof05 10Power splitter 3dB(2way)30 11Power Splitters 5dB(3way)50 12Power splitter 6dB(4way)20 13Jumper 1m M(N)-M(N)50 13Jumper 1/2m M(N)-F(N)40 14Dummy Load (20 w)02 15Cable tie02 BILL OF MATERIAL MAHAGUNPURAM

Coaxial Corrugated Cable Splitters Indoor Omni Antenna Coaxial Corrugated Cable Connectors Couplers Indoor Panel Antenna Product Picture MAHAGUNPURAM

Omni Antenna Panel Antenna ½” Coaxial Cable Shaft 7/8” Cable MOU & ROU MOU & ROU 1:2 Way Splitter 1:3 Way Splitter 1:4 Way Splitter 7dB Coupler 10 dB Coupler Terminator 15 dB Coupler Fiber Optic Cable Symbols Used in Floor Plan & Trunking Diagram MAHAGUNPURAM

19 TH Floor shaft Lift-1 Lift-2 Lobby Stairs Flat-1 Flat-2 Flat-3Flat-4 Flat-8Flat-7 Flat-6 Flat-5 Lobby A1 A2 A3 Ground To 19 th Floor Are Same

Basement Floor Lift-1 Lift-2 Plant Room In out Ganga Tower & Ridhi Tower Basement Parking Area A14 A15A16A13 A12A11 A9 A10 A8 A7 A6 A5 A4 A1 A2 A3

Basement Floor Lift-1 Lift-2 Plant Room In out Vidhi Tower & Sidhi Tower Basement Parking Area A14 A15A16A13 A12A11 A9 A10 A8 A7 A6 A5 A4 A1 A2 A3

Basement Floor Lift-1 Lift-2 Plant Room In out Bhagirathi Tower & Vinayak Tower Basement Parking Area A14 A15A16A13 A12A11 A9 A10 A8 A7 A6 A5 A4 A1 A2 A3

Terrace BTS Location

BTS For 19 th floor to Ground Floor 2 nd Sector 1 st Sector 3 rd Sector for IBS 3 rd sector For Basement Floor