Page 1 Assembled trap Bolt Trap jars Screens Dive weights (6kg) Rope threading 8-mm rope Trap cones 13mm sockets 13mm sockets Cut cable ties to remove.

Slides:



Advertisements
Similar presentations
Word Ladders First Grade Row - Boat Unit 4 Week 3 Created by Kristi Waltke.
Advertisements

Capacity and Volume D6 Put together your straw Fill the sink about a quarter full of water. Measure 100 ml of water and pour it into the jug. Draw a.
Plate boundary movements and their results
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
How to make a Miners Lantern. Developed as part of… SURVIVNG STAVELEY.
Optical Manufacturing Solutions 1 Probe Assembly.
Click on this image to open the full PDF document.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
Removal of Radiance Neph Disable the humidifier power remove water reservoir at top of neph disconnect power, computer and sensor cables disconnect and.
Altitude Azimuth 3 rd Coordinate System Your zenith Your zenith 180 degrees from you zenith is Nadir directly on the other side of earth 180 degrees from.
Experimenting with Buoyancy Buoyancy (boy-an-see) is the upward force that a liquid exerts on an object. If the downward force (weight) of the object.
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Unit 6: Ocean Floor Structure. Sea Floor Features: Earth's rocky surface is divided into two types: oceanic crust, with a thin dense crust about 10 km.
2.6 Related Rates. Related Rate Problems General Steps for solving a Related Rate problem Set up: Draw picture/ Label now – what values do we know.
Tutorial on Machine vice
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Release 01/10/051 ASSEMBLY INSTRUCTIONS DUCOSUN F MULTIFIT.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Simple Machines. What is a Simple Machine?  A simple machine has few or no moving parts.  Simple machines make work easier.
Nutrient impact experiment. Activity Learning intention: - Create a model nutrient flow between land and water Success criteria: -Read about the transfer.
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Candela Display Systems 3x2 Interactive Video Wall System.
Hosted by The Second Grade Simple Machines PulleysLeversScrews
모니터 리프트 규격서 (HML-500) Audio & Video System, Display, Conference System.
Simple Machines.
Example Have you ever : Tried to take a super heavy object up a flight of stairs ? WHAT HAPPENED.
REMOVE ALL CUT OUTS MILK CARTON TRAP ASSEMBLY. STAPLE BOTTOM OF TRAP.
Instead of using expensive and complicated materials in making a Rainwater Harvesting System…
 Theory that the Earth is made of large moveable plates.
Physics 1B03summer-Lecture 12 1 Fluid Mechanics Pressure Buoyancy.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Trap Components Pheromone secured With paperclip
Wheel and Axle Lever Simple Machines Pulley Screw Wedge Inclined Plane.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Wheel and Axle Lever Simple Machines Pulley Screw Wedge Inclined Plane.
Simple Machines.
2 meter long PVC tube Fitted with a lid in each end – see photos on next pages Brass top, to fasten a rope, and to help fasten the hinge for the top lid.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
Use trigonometry to find the measures of the sides of right triangles.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Copyright © by Holt, Rinehart and Winston. All rights reserved. ResourcesChapter menu Students know: two kinds of volcanoes, one with violent eruptions.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
WJEC Past Paper Questions (with answers)
Baby-MIND Modules & Services
Metrics and measurement
Warm up 2/1.
Lantern plans by Master Dafydd and Master Terafan
What is Buoyancy?.
Map Skills.
Dissection Tools.
T400 Motor Replacement.
CHAPTER 45 Engine Lubrication.
Plate boundary movements and their results Foldable
Mounting a BalanceBox®650 to a brick wall
A home-made trap for blowflies is easy to make, using two 2-litre plastic drinks bottles, one clear and one brown. A home-made trap for blowflies is easy.
모니터 리프트 규격서(HML-500) Audio & Video System, Display, Conference System.
McMaster linear bearing #6709K180 with guide rail suppressed
Chapter 11 Work and Power.
Assembling/Dismanteling Method of the Socket
Plate boundary movements and their results Foldable
Reader Swap out Guide.
Which way does the moon go?
4000CIV 21/2”-10”.
Neutron guide Shielding Concept
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Materials By Products Bottle Reshaping Bottle Cleaning Making String
CARRI CHEF 2 – BUILDING HOW TO BUILD
Presentation transcript:

Page 1 Assembled trap Bolt Trap jars Screens Dive weights (6kg) Rope threading 8-mm rope Trap cones 13mm sockets 13mm sockets Cut cable ties to remove Unscrew to remove and screw on lid

A 125 mm Troll float is used as a subsurface float

Lift by the rope only and keep vertical Rest the trap on the side of the boat on the bottom plate Puncture the parcel-tape patch to spill excess water If sediment above the patch, catch the water and sediment in the 5-litre jug and transfer to a 2-litre bottle and label

The bottom trap will have more sediment than the top ! 1, 2, 6, and 7 are likely to have large amounts of sediment There are 2 traps at the top and two at the bottom = 4 traps per line = total of 40 traps

South Pacific Ocean. New Zealand. North Island – 1:502,000