OPSM 301 Operations Management Class 19: Project Management: MS Project Koç University Zeynep Aksin

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

OPSM 301 Operations Management Class 8: Project Management: Introduction and CPM Koç University Zeynep Aksin
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
MS Project.
CPM, Crashing, Resource Leveling using MS Excel & MS Project
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
Eleanor Roosevelt High School
Microsoft Project.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
Introduction to Project Management ECE 480 Erik Goodman.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
ELC 347 DAY 7. Agenda Questions Assignment 3 Due Assignment #4 posted  Due next week Group Progress report due next week Exam 2 next week  Same format.
Assignment #17 Solution Monday, March 15, 2015
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Microsoft Office Project 2007: Managing Projects.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
HIT241 - TIME MANAGEMENT Introduction
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
MANAGING PROJECT RESOURCES
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management MS PROJECT.
OPMA 5364 Project Management Part 0 – Course Overview Dr. Edmund Prater The University of Texas at Arlington.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Latifa AlAbdulkarim King Saud University October,2009.
Resource Planning CTC-415. Resource Scheduling Need to have adequate –Labor –Materials –Equipment –To do project Network schedule must be developed around.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 7: Introduction to MS - PROJECT L E C T U R E 7 INTRODUCTION TO MS.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Project Time Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Resource analysis 1 Project management (seminar).
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
6 Resource Utilization 4/28/2017 Teaching Strategies
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
1 Schedule Control with Microsoft Project 2003 P roject M anagement M ethodologies Laura Williams, PMP.
Managing the Information Systems Project Cont’d
OPSM301 MS Project Tutorial
Project Management – PTM721S
Microsoft Project 101: How to Build a Project Plan
Project Management: PERT/CPM
The Project Schedule and Budget
ACTIVITY PLANNING AND RISK MANAGEMENT
Chapter 6: Project Time Management
In this tutorial you will:
ENGINEERING MANAGEMENT (GE 404)
Introduction to Project Management ECE 480 Erik Goodman.
ENGINEERING MANAGEMENT (GE 404)
Project Management © 2004 D. J. Foreman.
Resource Allocation Chapter#8.
Resource Allocation Chapter#8.
Exercise – A small building.
Project Management © 2004 D. J. Foreman.
University of Debrecen Mongolian University of Life Sciences
Project Management © 2008 D. J. Foreman.
Presentation transcript:

OPSM 301 Operations Management Class 19: Project Management: MS Project Koç University Zeynep Aksin

Using Microsoft Project Program 3.1

Using Microsoft Project Program 3.2

Using Microsoft Project Program 3.3

Using Microsoft Project Program 3.4

Using Microsoft Project Program 3.5

Using Microsoft Project Program 3.6

Using Microsoft Project Program 3.7

Exercise: Advertising Campaign ActivityPredecessorsTime Resource Progress A. Media bidsnone2 wks Ali100% B. Ad conceptnone6 Veli100% C. Pilot layoutsB3 Veli30% D. Select mediaA8 Ali20% E. Client approvalA,C6 Veli0% F. Pre-productionB8 Ali0% G. Final productionE,F5 Veli0% H. Launch campaignD,G0

Advertising Campaign project in MS Project  Open MS Project, Select View-> Gantt which should be the default  Enter task names  Enter durations  Enter precedence relationships, view network  View critical activities: Project>Filtered for:critical  Suppose we assign the above tasks to different people: Ali and Veli (Tools>Assign Resources)  View>Resource Graph  Level resources to alleviate conflict  Track project progress

Resource Allocation in Project Management  So far: CPM/PERT methods for scheduling  Ignored resource constraints  In reality, each task requires at least one resource, resources are mostly shared  Resource allocation is assignment of resources to scheduled tasks –Scheduleds may have to be changed to accommodate resource issues

Resource Loading  The amount of load on each resource (summation over all tasks which need that resource) on a period-by-period basis  Good tool in early scheduling  A seperate histogram for each resource is developed

Resource Leveling Objectives:  Minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances  Minimize over-usage of resources  Create a smoother distribution of resource usage –Reduced set-up costs (hiring, training, laying off) –Improves morale –Needs less hands-on managemet

Different Approaches possible  If time constraint is the priority, no adjustments should be made on the critical path  If resource constraint is the priority, project duration can be extended by adjusting critical activities  Earliest and Lates Start Times and Slack information is used in Resource Leveling  MS Project facilitates resource leveling