Www.sebesta.com Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.

Slides:



Advertisements
Similar presentations
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
Advertisements

SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
Not Your Father’s Older Brother’s LEED: Energy & Commissioning Opportunities in LEED v4 Mark Gelfo, PE LEED AP BD+C, LEED AP O+M, CxA, EMP Director of.
Energy Sub-Metering for Measurement and Verification
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Process & Benefits of Monitoring Based Commissioning David Jump, Ph.D., P.E. Principal Quantum Energy Services & Technologies, Inc.
Jim Pauley, P.E. Vice President, Industry and Government Relations – Schneider Electric Chair, NEMA High Performance Building Council Building Star An.
HVAC Test and Balance And The Lodging Industry. Source: Florida Power.
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
January 12, 2012 Commissioning Services. June 13, 2011  Genesis Commissioning Capabilities  What is Commissioning (Cx)/Retro-Commissioning (RCx)? 
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Building Commissioning
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
Commissioning for High Performance Commissioning for High Performance Ken Meline, Principal Command Commissioning, LLC.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
LEED Mechanical Economic Analysis, Cost Reduction Strategies and Sustainability Support Services Reducing = Metal + Carbon + Energy + Water + Chemicals.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning/Energy Performance Contracting.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Program Overview Public Buildings Enhanced Energy Efficiency Program (PBEEEP) This program was made possible with funding from the U.S. Department of Energy.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Introduction to LEED Building Commissioning
Overview What is commissioning (short version)
Fort Stanwix National Monument Energy Audit Contract
Energy Savings Performance Contracts & Energy Service Companies
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Monitoring-Based Commissioning what is it and how can I use in in LEED v4 Administrated by.
Optimization for Airport Facilities
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
2018 Retro-Commissioning (RCx) Program
Presentation transcript:

Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C

Introduction Commissioning – New Buildings Retro Commissioning – Existing Buildings On-going Commissioning – Existing Buildings Case Studies Owner Benefits Agenda

Integrated Services #1 Cx Provider by CSE (2009/10) Rank as ENR Top 500 Firm Introduction 100% employee-owned Local Partnerships Multiple Offices Nationwide project resume

Commissioning – New Buildings Retro-Commissioning – Existing Buildings On-Going Commissioning – Existing Buildings Sustainable Solutions Energy Performance and Modeling Energy Assessments Measurement and Verification MEP Systems Design Services Central Utility Plant and Distribution Technical Expertise

What is Commissioning? “Systematic process of assuring that a building is designed, constructed, and performs efficiently in Accordance with the design intent and the owner’s Operational needs, and that sets the structure to Continue these operations throughout the life of the building.” NEBB Standard

Improved Lifecycle Performance Energy Efficiency More Complex & Powerful Systems Changes in the Industry Building Systems Impact on Occupants Why is Commissioning Needed?

1.Systems to Commission 2.Phases of Commissioning 3.Commissioning Value 4.LEED® New Building Commissioning

Typical Systems HVAC Electrical Lighting Plumbing Medical Gas Optional Systems Life Safety Building Envelope Security Integrated Systems Test What Systems are Commissioned?

Pre-Design Phase Design Phase Construction Phase Acceptance Phase Warranty Phase Commissioning Phases

Owner Technical Support Specify Performance Document Review Delivered Value Operations Perspective Accessibility Maintainability Commissionability Commissioning Phases - Design Commissioning Plan Design Intent Document Design Review Commissioning Specifications

Purpose Build in Quality Add Expertise to Construction Team Delivered Value Scheduling Support System Documentation Operational Inspection Early Issue Identification & Resolution Commissioning Phases - Construction Schedule Commissioning Activities Shop Drawing Review O&M Document Preparation Training Plan Review Regular Coordination Meetings/Site Visits

Delivered Value Systems that Work Operational Clarity Trained Operators Building Acceptance Documented History Commissioning Phases - Acceptance Final Commissioning Report Systems Training Functional Testing Training Deficiency Correction

Delivered Value Performance Confirmation Reinforced Training Issue Identification/ Resolution Warranty Support Commissioning Phases - Warranty Deferred Testing 10-Month Check-Up Amend Final Commissioning Report Reinforce Training

Reduce Total Ownership CostsImprove Energy & Water Efficiency Safe, Healthy & Productive Built Environment Promote Sustainable Stewardship Commissioning Values

Commissioning for LEED BD+C Fundamental Commissioning vs. Enhanced Commissioning – Additional Design Reviews – Additional Submittal Reviews – Systems Manual – Warranty Phase Activities – Training Additional Activities for Commissioning Agent – Review of Building Energy Model – Implementation of M&V Plan – LEED Facilitation

1.What is Retro-Commissioning 2.Investigate Opportunities 3.Measurement and Verification 4.Retro-Commissioning Outcomes 5.LEED® Existing Building Retro-Commissioning

Focus more on optimizing existing systems In-depth look at controls and sequence of operations Space use changes Life safety and code updates Possible system upgrades Identify gaps between initial design and current operation What is Retro-Commissioning

Areas of High Complaint/High Use Lighting – in and out Parking HVAC Air balance Controls Chiller Boiler Kitchen Laundry Pool or spa Investigate Opportunities

Our Experience: Typical Opportunities

Measurement & Verification Verify identified opportunities were correctly implemented: – Performance Testing – Equipment Metering – System Trending Create New System / Equipment Benchmarks: – Perform ongoing reviews of performance – Maintain system parameters for performance – Annual assessment and testing

Outcomes – material changes implemented – Improved energy efficiency – Improved building performance – Identify Energy Conservation Measures for future investment – Documentation – Training Retro-Commissioning Results

Commissioning for LEED O&M LEED O&M V3 and Retro-Commissioning – Up to 6 LEED Credits – Energy Audits – Assistance in Greenhouse Gas Assessments – Refrigerant Reduction Calculations – Measurement and Verification – Training – Improved Operations

1.What is On-Going Commissioning 2.On-Going Commissioning Outcomes On-Going Commissioning

Utilize technology to continuously monitor and analyze building performance Continuous/ periodic feedback to building operators Operations adjusted/ maintenance activities initiated to immediately address performance issues On-Going Commissioning

Outcomes – Continuous improvement- energy efficiency and building performance – Issues identified quickly – More focused efforts for building operators On-Going Commissioning - Outcomes

National Gallery of Art Phased Renovation – New Construction 125,000 GSF per phase. Art Galleries, Restoration and Preservation Labs Major renovation of all HVAC, Electrical, Plumbing and Art Handling Systems. Case Studies Benefits and Outcomes: Improved performance and Reliability. Reduced equipment outages Early resolution of design issues.

University of Iowa Retrocommissioning Study Bowen Science Building 375,000 gsf of mixed use labs and offices Energy Savings Opportunities Replacing or retrofitting failed VAV boxes Upgrading the building automation system Installing an energy recovery system on exhaust systems Reducing lighting levels to current standards Potential energy savings of more than 35% with an average 2-year payback Case Studies

Proper Environmental Control Improved Indoor Air Quality Optimized Energy Profile Persistence of Savings Occupant Acceptance Certification/Accreditation Owner and Occupant Benefits

Commissioning Financial Incentives Median Costs – $0.30 per sq. ft [Existing Building] – $1.16 per sq. ft [New Construction] 13-16% energy savings Median payback period of 1.1 to 4.2 years – Lawrence Berkeley National Laboratory 2009 [

Questions and Comments