TUTORIAL 7 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 08/04/2012 Introduction to MS Project 2007.

Slides:



Advertisements
Similar presentations
Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
Advertisements

TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
MS® PowerPoint.
Microsoft Office XP Microsoft Excel
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
For Deborah Cottle Brown Elementary ITS. Excel PowerPoint us/training/default.aspx (Office Online Training in Outlook)
Working with Large Worksheets, Charting, and What-If Analysis
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
TUTORIAL 3 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 14/10/2012 Introduction to MS Project 2007.
Microsoft Word 2010 Lesson 1: Introduction to Word.
Creating a Document with a Table, Chart, and Watermark
CREATING A MULTIPLE PAGE REPORT Presented by: Dr. Ennis-Cole.
Project Information: Customizing and Printing Lesson 7.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
Starting a New Project Cheryl A. Wilhelmsen Lee Ostrom.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Fine-Tuning Tasks Lesson 11. Skills Matrix SkillsMatrix Skill Manage task constraints and dependencies Explore the effects of constraints and dependencies.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Outlook Project 2 Scheduling Management and Instant Messaging Using Outlook.
Managing Multiple Projects Lesson 9. Skills Matrix SkillsMatrix Skill Manage consolidated projectsCreate a consolidated project plan Create dependencies.
Tracking progress on tasks and assignments TUTORIAL # 3.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Chapter 3 Maintaining a Database
Transferring Course Materials to the Web. Creating a Web Site With a Template To create a Web site with a template 1.Start FrontPage. 2.On the File menu,
Evaluation#3 MS Project Objectived u In this lab you will learn: – how to add the resources into tasks. –How to review resource assignment information.
® Microsoft Access 2010 Tutorial 6 Using Form Tools and Creating Custom Forms.
TUTORIAL 4 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 04/11/2012 Introduction to MS Project 2007.
Using Form Tools and Creating Custom Forms Microsoft Access 2010.
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
OST Introduction to Excel Excel 2004 The Project Gallery is a window that links you to every application in Microsoft Office. It allows.
Project Management Applications Software Skills.
Ahmad Al-Ghoul. Learning Objectives Explain what a Microsoft Project environment and Project Server. Describe how to use the Ribbon, Quick Access Toolbar.
Using Microsoft Project Gavrilă Cristian. Using Microsoft Project 1. Introduction 2. Tasks 3. Resources and costs 4. Fine tunning 5. Publishing projects.
TUTORIAL 2 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 19/02/2012 Introduction to MS Project 2007.
Happy Monday!!!  Open the Agenda  Copy it in your Agenda form.  Wait for further instructions.
PROJECT MANAGEMENT 3RD YEAR UNDERGRADUATE UNIT U13451 PRMAN DL Tutor: Kathy Parker WEEK FIVE Adapted from slides by Dr Philip J. Scott MSc PhD FBCS CITP.
IC 3 BASICS, Internet and Computing Core Certification Key Applications Lesson 11 Organizing the Worksheet.
LINKS TO OBJECTIVES Multiple Worksheets Multiple Worksheets Move, Copy and Paste Cells Move, Copy and Paste Cells Split into Windows Freeze Panes Range.
TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
Basic Editing Lesson 2.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
TUTORIAL 9 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 22/04/2012 Introduction to MS Project 2007.
TUTORIAL 8 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 15/04/2012 Introduction to MS Project 2007.
Introduction to Microsoft publisher
© Paradigm Publishing Inc. ACCESS CREATING QUERIES, FORMS, AND REPORTS Section 3.
Establishing Resources Lesson 2. Skills Matrix SkillsMatrix Skill Establish people resourcesEstablish individual people resources Establish a resource.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 8: Introduction to MS - PROJECT L E C T U R E 8 INTRODUCTION TO MS.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
1 Microsoft Project 2003 Starting a New Project. 2 Creating a new project plan To start Microsoft Project, click the Windows Start menu. Point to All.
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
Pasewark & Pasewark Microsoft Office 2003: Introductory 1 INTRODUCTORY MICROSOFT OUTLOOK Lesson 2 – Calendar.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
XP IT INSTRUCTOR :AHMAD HIRZALLAH 1 Microsoft Office FrontPage 2003 Creating Tables and Frames.
Resource and Task Assignments Lesson 3 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
Chapter 5 Working with Multiple Worksheets and Workbooks Microsoft Excel 2013.
Refining Your Project Schedule Lesson 4 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
 The clipboard is a temporary storage area  The cut or copy commands place information on the CLIPBOARD  There are two types of clipboards: – System.
Fine-Tuning Tasks Lesson 5 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
XP New Perspectives on Microsoft Office FrontPage 2003 Tutorial 5 1 Microsoft Office FrontPage 2003 Tutorial 5 – Creating Tables and Frames.
Project Management Skills.
Project Management Skills
Entering the Task List Dr. George.
Presentation transcript:

TUTORIAL 7 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 08/04/2012 Introduction to MS Project 2007

Setting Task Constraints In this exercise, you apply a Start No Earlier Than constraint to a task. Select the name of task 20, Develop prototype based on functional specifications. On the Standard toolbar, click Task Information. In the Task Information dialog box, click the Advanced tab. In the Constraint Type box, select Start No Earlier Than. In the Constraint Date box, type or select 08/03/12 Click OK Project applies a Start No Earlier Than (SNET) constraint to the task, and a constraint icon appears in the Indicators column. 2

Setting Task Constraints Task 20 is rescheduled to start on March 08 instead of March 06. All tasks that depend on task 20 are also rescheduled. Click the Close button (the “X” button in the upper right corner) on the Task Drivers pane. Here are a few other things to keep in mind when applying constraints to tasks: Entering a Finish date for a task (for example, in the Finish column) applies a Finish No Earlier Than (FNET) constraint to the task. Entering a Start date for a task (for example, in the Start column) or dragging a Gantt bar directly on the Gantt chart applies a Start No Earlier Than (SNET) constraint to the task. In many cases, entering a deadline date is a preferable alternative to entering a semi-flexible or inflexible constraint. 3

Viewing the Project’s Critical Path A critical path is the series of tasks that will push out the project’s end date if the tasks are delayed.critical path In this exercise, you view the project’s critical path. One way to see the critical path is to switch to the Detail Gantt view. On the View menu, click More Views.View In the More Views dialog box, select Detail Gantt, and then click the Apply button. The project appears in the Detail Gantt view. On the Edit menu, click Go To. In the ID box, type 12, and then click OK. On the View menu, click Gantt ChartView 4

Interrupting Work on a Task You can split the task to indicate times when the work will be interrupted and when it can resume. In this exercise, you split a task to account for a planned interruption of work on that task. On the Edit menu, click Go To. 2. In the ID box, type 8, and then click OK. Project displays task 8. On the Standard toolbar, click the Split Task button. A ScreenTip appears, and the mouse pointer changes. Move the mouse pointer over the Gantt bar of task 8 Move (but don’t click) the mouse pointer over the Gantt bar of task 8 until the start date appears in the ScreenTip. Project inserts a task split, represented in the Gantt chart as a dotted line, between the two segments of the task 5

Interrupting Work on a Task Here are a few other things to keep in mind when splitting tasks: You can split a task into as many segments as you want. You can drag a segment of a split task either left or right to reschedule the split. The time of the task split, represented by the dotted line, is not counted in the duration of the task. No work occurs during the split. If the duration of a split task changes, the last segment of the task is increased or decreased. If a split task is rescheduled (for example, if its start date changes), the entire task is rescheduled, splits and all. The task keeps the same pattern of segments and splits. To rejoin two segments of a split task, drag one segment of the task until it touches the other segment. 6

Entering Deadline Dates Entering a deadline date causes Project to display a deadline indicator on the chart portion of the Gantt Chart view. In this exercise, you enter deadline dates for some tasks. On the Edit menu, click Go To. In the ID box, type 16 and click OK. On the Standard Toolbar, click Task Information. Click the Advanced tab. In the Deadline box, type or select 24/02/12, and then click OK.Deadline Project inserts a deadline indicator in the chart portion of the Gantt Chart view. 7

Setting Up a Recurring Task Many projects require repetitive tasks, such as attending project status meetings, creating and publishing status reports, or running quality-control inspections. a recurring task is repeated at a specified frequency such as daily, weekly, monthly, or yearly. In this exercise, you create a recurring task that will represent a weekly meeting associated with this project. On the View menu, click Gantt Chart.View The Gantt Chart view appears. 2. Select the name of task 16, Analysis complete On the Insert menu, click Recurring Task.Recurring Task 8

Setting Up a Recurring Task The Recurring Task Information dialog box appears. In the Task Name box, type Staff planning meeting In the Duration box, type 2hDuration Under Recurrence pattern, make sure Weekly is selected, and then select the Monday check box. Next, you will specify the date of its first occurrence. By default, it is the project start date. However, you want the weekly status meetings to begin one week later. In the Start box, type or select 08/02/12. Next, you will specify the number of recurrences. You do this by entering either an exact number of recurrences or a date by which the task should end. Select End after, and type or select 10 occurrences. Click OK to create the recurring task Project inserts the recurring tasks 9

Setting Up a Recurring Task 10 Next, you will assign resources to the recurring task. Verify that task 17, Staff planning meeting, is selected, and then, on the Standard toolbar, click Assign Resources. In the Assign Resources dialog box, click Resource 1. Then hold down the Ctrl key while clicking Resource 2 and resource Click the Assign button, and then click Close. The Assign Resources dialog box closes, and Project assigns the selected resources to the recurring task. Next, you will view the individual occurrences of the recurring task. Click the plus sign next to the recurring task’s title, Staff planning meeting. Click the minus sign next to the recurring task’s title, Staff planning meeting, to hide the individual occurrences

Examining Resource Allocations over Time 11 In this exercise, you will focus on resource allocation- how the task assignments you’ve made affect the workloads of the work resources (people and equipment) of a project. The relationship between a resource’s capacity and his or her task assignments is called allocation. Each work resource is in one of three states of allocation:allocation Underallocated The resource’s assignments do not fill the resource’s maximum capacity. For example, a full- time resource who has only 25 hours of work assigned in a 40-hour work week is underallocated. Underallocated

Examining Resource Allocations over Time 12 Fully allocated The resource’s assignments fill the resource’s maximum capacity. For example, a full- time resource who has 40 hours of work assigned in a 40-hour work week is fully allocated. Fully allocated Overallocated The resource’s assignments exceed the resource’s maximum capacity. For example, a full-time resource who has 65 hours of work assigned in a 40-hour work week is overallocated Overallocated In this exercise, you look at resource allocations and focus on two resources who are overallocated.

Examining Resource Allocations over Time 13 On the View menu, click More Views, click Resource Allocation, and then click the Apply button.View The Resource Allocation view appears. This is a split view, with the Resource Usage view on top and the Leveling Gantt Chart view on the bottom. On the left side of the Resource Usage view is a table (the Usage table, by default) that shows assignments grouped per resource, the total work assigned to each resource, and each assignment’s work. The right side of the view contains assignment details (work, by default) arranged on a timescale. The bottom pane shows the Leveling Gantt Chart view only for whatever resource or assignment (single or multiple) is selected in the upper pane.

Examining Resource Allocations over Time 14 On the Standard toolbar, click the Scroll To Task button Click the Resource Name column heading. On the Project menu, point to Outline and then click Hide AssignmentsProjectOutline Next, you will look at two work resources and their allocations. 7. In the Resource Name column, click the name of resource On the Standard toolbar, click Scroll To Task. Point to the W column heading (for Wednesday) at the top of the timescaled grid. A ScreenTip appears with the date of the assignment: On the Format menu, click Timescale.Timescale Make sure that the Middle Tier tab is selected, and in the Units box under Middle tier formatting, click Months.Units In the Show box under Timescale options, click One tier (Middle). Click OK to close the Timescale dialog box.

END of Tutorial 6 15