CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.

Slides:



Advertisements
Similar presentations
3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
Advertisements

LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Optimisation of Roebel cable for HTS accelerator magnets
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
1 Tests to Determine Lengths during Reaction of LQ cable R. Bossert, F. Nobrega, N. Andreev, G. Ambrosio, I. Novitski
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Wound Conductor Test Facilities (TASK 2) (Short status…) Friedrich Lackner 2 nd of September 2015 FUTURE CIRCULAR COLLIDER MAGNETS TECHNOLOGIES.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
MQXF Preliminary Dose Requirement G. Ambrosio, E. Fornasiere, E. Todesco Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
EuCARD2 WP10.2 main results and open issues
Coil Design and Fabrication
Status of the manufacturing process of a Nb3Sn wiggler prototype
HQ Mirror Assembly R. Bossert
WP-7 / Task 4 Very high field magnet
FuturE circular collider MAGNETS TECHNOLOGIES
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
11 T dipole coil features and dimensions
FRESCA2 Update on the dipole design and new calculations
Glyn Kirby Magnet AssemblyTechniques.
Mechanical stability and QXF coil winding
SMC Design overview of the construction and project issues
QXF schedule and milestones
Presentation transcript:

CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014

Nb 3 Sn Technology development WP4 concerns the studies necessary on Nb 3 Sn cable prior to new coil winding. It is centered on FRESCA 2 cable but other cases as QXF or 11T cables could be analyzed. FRESCA 2 Cable characterization Mechanical tests facility at Saclay Cable behavior during heat treatment 03/07/2014 CA No. KE2275/TE - WP4 - Nb3Sn technology development 2

Cable expansion studies Insulated cable procured by CERN Ten stacks preparation and heat treatment at Saclay Dimensional measurements under 5MPa at CERN FRESCA 2 cable characterization 03/07/2014 CA No. KE2275/TE - WP4 - Nb3Sn technology development 3

Impregnated cable mechanical behavior studies Insulated cable procured by CERN Ten stacks heat treatment and impregnation at Saclay Compressions tests at RT Compressions tests at 4K Thermal contraction measurement between RT and 77K/4K at Saclay FRESCA 2 cable characterization 03/07/2014 CA No. KE2275/TE - WP4 - Nb3Sn technology development mm Impregnation insert and mold

Mechanical tests facility at Saclay Mechanical tests facilities at Saclay 03/07/2014 CA No. KE2275/TE - WP4 - Nb3Sn technology development 5 Compression tests set-up Thermal contraction set-up

Cable behavior during HT Short coil dilatation tool Mandrel total length: 690 mm Straight section total length: 600 mm Mandrel width: 90 mm 1.5 turns = 2.4 m of cable Mandrel configurations Configuration 0 – C0 Configuration 1 – C1 Configuration 2 – C2 Configuration 1 sym – C1 LE 03/07/ CA No. KE2275/TE - WP4 - Nb3Sn technology development 6

Cable behavior during HT 7 CA No. KE2275/TE - WP4 - Nb3Sn technology development 03/07/2014 CLOSED MANDREL MANDREL WITH CENTRAL GAP Stress witness

Cable behavior during HT PIT Cable 8 CA No. KE2275/TE - WP4 - Nb3Sn technology development 03/07/2014 Cable Mandrel material C1 Gap reduction % LSS C2 (*C1 LE) Gap reduction % LSS 1 central gap2 head gaps *1 PIT 1.82 mm Iron HT15.83 mm0.97%HT25.22 mm0.87% Stainless steelHT26.73 mm1.12%HT38.02 mm1.34% TitaniumHT25.50 mm0.92%HT37.94 mm1.32% PIT 1.86 mm IronHT7 (3 turns)5.16 mm0.86%HT47.69 mm1.28% Titanium HT74.96 mm0.83%HT48.82 mm1.47% HT95.84 mm0.97%*HT8*7.86 mm1.31% HT9 Step 190°C2.88 mm 49% of the final gap HT9 Step 400°C4.64 mm 79% of the final gap

Cable behavior during HT RRP Cable 9 CA No. KE2275/TE - WP4 - Nb3Sn technology development 03/07/2014 Mandrel material C1 Gap reduction L SS = 600 mm L TOT = 690 mm L cable = mm 1 central gap% L SS % L TOT (head to head) % L cable Titanium HT5 Central gap4.73 mm0.79%0.69%0.64% Total gap (central - lateral) 3.93 mm0.66%0.57%0.53% HT6 Central gap4.55 mm0.76%0.66%0.61% Total gap (central - lateral) 3.84 mm0.64%0.56%0.52% HT10 Central gap4.89 mm0.82%0.71%0.66% Total gap (central - lateral) 3.97 mm0.66%0.58%0.54%

Cable behavior during HT – next steps Complete RRP and PIT FRESCA2 cable tests campaign with reduced scale dilatation tool studying the influence of : SS length Number or turns Cable insulation Scale-1 Dilatation test 03/07/2014 CA No. KE2275/TE - WP4 - Nb3Sn technology development 10