20/10/201511 Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.

Slides:



Advertisements
Similar presentations
Pinjarra Engineering Reception
Advertisements

Software Quality Assurance Plan
Radiopharmaceutical Production
ISO 9000 Quality Standards ISO 9000 describes quality assurance elements in generic terms that can be applied to any business. It treats an enterprise.
Cylinder Service Centre Limited Premier Class Provision of Cylinder Manufacturing and Repair Services.
Adrian Cook, Group Head of Procurement
Date: 04/05/2015 NucSIG Event – 9 th June 2010 Poor Supplier Quality Performance, Electrical Switchgear Paul Murphy CEng, CQP, MCQI Management Systems.
Feedstock xSi Advantages Considerations Origin European produced phosphorus oxychloride with proven track record ensuring consistent in-coming quality.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
1 AO Milan 40MM Manufacturing Support Capabilities J. Fine & J. Solgaard January 28, 2004.
ASME Nuclear Conformity Assessment
SUBSAFE Approved for Public Release
Nuclear Submarines Opportunities and Challenges. Nuclear Submarines The MoD believes that the UK should retain onshore a sovereign capability in the design,
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
ISO 9000:2008 Auditing Ty Stokes April Agenda What is ISO 9000:2008 auditing? Brainstorming activity Background of ISO 9000:2008 auditing Audit.
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Visit us at E mail: Tele:
Scope To convert manual or PLC based autoclave to a dedicated and fully automatic system. Existing product with Heater and low water sensor (Bimetallic.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
Introduction to ISO New and modified requirements.
1 Operations Management Lesson 6 Material Requirements Planning and Enterprise Resource Planning.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
Operations Management Class 20 Tuesday 11/8/11. Operations Management (OM) The development and administration of the activities involved in transforming.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Module 4 Activity: Compare Quality Essentials to ISO 15189:2012 Checklist Sections.
Supply Chain Integration February 24, 2014 Jason Cox Chief Technical Officer Cox Machine, Inc.
CRS Refrigeration Limited. About CRS Refrigeration CRS Refrigeration is the leading repair and maintenance company based in Dublin Port CRS Refrigeration.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
QUALITY MANAGEMENT STATEMENT
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Nadcap Supplier Seminar Heat Treatment
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Founded in 2005 by four directors from the Automation and Control Industry Applied Integration UK are an independent, Stokesley based solutions provider.
Quality Management: Mutually beneficial supplier relationships.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
The Rotation Sleeve System Triangle Equipment AS in co-operation with Ericsson Saab Avionics AB The EXPRO Group.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Six Sigma Greenbelt Training
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
Project Quality Management
QUALITY ASSURANCE AND CONTROL
ISO/IEC
Strategy for conformity of non-standard cryogenic equipment
Quality control & assurance.
Third Party Activities for FH1 Project
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
UK Manufacturers & Suppliers of Gaskets, Rubber Mouldings, Inflatable Seals, Machined Components, Studbolts and more for many industries. STUDBOLTS & FASTENERS.
First Article Inspection
Quality Regulation for Mechanical Equipment RESSQ – Mech
Supplier Briefing Pack
Radiopharmaceutical Production
Manufacture of Sterile Medicinal Products: ‘Annex 1’ - DRAFT
Presentation transcript:

20/10/ Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES

NucSIG Event – 9 th June 2010 Submarine 1 st Level Quality Assurance PURPOSE To ensure that submarines are operated and maintained to the correct Standard and to the correct Specifications so that they are capable of achieving their design performance throughout their operational life. SCOPE Applicable in 3 main systems areas: Submarine Safety Reactor Safety Personnel Safety

NucSIG Event – 9 th June 2010 High precision items of equipment such as Submarine 1 st Level Items: –PUMPS –VALVES –ACTUATORS etc, etc. Are subjected to a high level of control throughout the design, manufacture, assembly, operation and overhaul phases. It becomes a real challenge to ensure the intended operation of the item meets the customers exacting requirements.

NucSIG Event – 9 th June 2010 Even basic items can at times present a challenge! Example one being: A Weld Insert

NucSIG Event – 9 th June 2010 What is a Weld Insert?

NucSIG Event – 9 th June 2010 A Formed Insert - to form the root of a weld

NucSIG Event – 9 th June 2010

Associated Problem –Welding Issue –Material Analysis –Documentation Checks –Wider concern and further checks –Supply Chain –Audit and Findings

NucSIG Event – 9 th June 2010 Second example is something as basic as:- Locking Wire

NucSIG Event – 9 th June 2010

Where is it used? – Inside the Steam Generator Purpose - to wirelock the fasteners which hold Chevrons and Driers etc

NucSIG Event – 9 th June 2010 Associated Problem –Material Shortcoming –Material Analysis –Documentation Checks –Supply Chain –Audit and Findings. –Additional Issues

NucSIG Event – 9 th June 2010

How might you procure steel tubing at short notice? Use a detailed QA Statement of Requirements? Use an ISO certificated steel stockist? Use a major UK stockist of steels, alloys & plastics? Use a local stockist we have approved? Use a stockist with a proven track record? 

NucSIG Event – 9 th June 2010 Our Purchase Order Specification demanded material certification for: Chemical, Mechanical, Heat Treatment, Ultrasonic, Surface Finish, Pressure & Dimensional Demonstrates design intent maintained Safety Case reliability targets not undermined

NucSIG Event – 9 th June 2010 But what if the certification reads?

NucSIG Event – 9 th June 2010 All examples are basic items All examples involved additional testing Some involved concession action One supplier no longer used Other given additional supply conditions Each example incurred extra costs No budget for additional supply chain assurance Especially Overseas!

NucSIG Event – 9 th June 2010 Babcock International Group Marine Division Babcock Engineering Services Babcock Naval Services Devonport Management Ltd. Strachan & Henshaw SSMG Intec Marine Division Evolution - Recent History

NucSIG Event – 9 th June 2010 Changing our approach: –Marine Division Supplier Development Programme (SC21) –Shared Supplier Intelligence –Integrated Supplier Assessment –Shared Supplier Performance Monitoring –Assessor Training & Development