HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.

Slides:



Advertisements
Similar presentations
Test test Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following 3 slides.)
Advertisements

HWg-PDMS: New software Poseidon & Damocles Monitoring System 1 Included on every HWg DVD since September 2009.
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
HBD Operation in Run 9 Thomas K Hemmick for the HBD Crew.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 TPC online  offline calibration November 2002.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Module 3: Configuring Hardware on a Computer Running Windows XP Professional.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1.9 Production Wizard The Lumio Production Wizard is a suite including three applications, providing the following features: Creation of a set of configuration.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
PeopleSoft Financials 8.8 General Ledger Workshop Thursday, January 24, 2008 LSU HEALTH CARE SERVICES DIVISION 8550 UNITED PLAZA BLVD SUITE 400 BATON ROUGE,
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Muon System Safety Issues Burkhard Schmidt.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
Kapi’olani Community College Art 222 Digital Multimedia In-class Presentation Week 15B.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
Gain Curves Jason for the SB Crew June 5, Raw 55 Fe Spectra Start with 55 Fe spectrum from a MCA. Fit peak to gaussian. Calibration from a pulser.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
CONTROL-M Training At Global Online Trainings IND: Skype: Global.onlinetrainings USA:
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Setting Up and Performing a Calibration
Large CMS GEM with APV & SRS electronics
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
TB8100 Technical Training July 2005
ENTSO-E Transparency Platform Vision Project
Errecting TMS-580 Control room CT /-PT Platform.
Online software and backups
Presentation transcript:

HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008

OUTLINE  Installation in PHENIX The completed procedure Mainframe Initialization  OUR HV Control Time To Talk: “What Do We Want?”  Forward/Reverse Bias  Trip (Peak) Current for GEMs & Mesh  P/T Correction Layers / Tables  Coming Up Voltage / Current Calibration Relay Boards, Cabling, MF testing, … HVCV2.0 Distribution Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 2 of 6

INSTALLATION IN PHENIX  December 8 th, 2008 – 4PM EST :: HBD HV Control & Monitoring System successfully installed in PHENIX Due to the HBD Simulation Project, the installation process without big complications!  TS5 has been powered up and connected to the HBD mainframe on the bridge.  The mainframe rack which is shared with the RXNP guys, has been powered up.  ALL 6 Run9-modified 1471Ns, which have been crash tested and prepared for installation since last Thursday continuously day & night, were installed in the 1458HP mainframe.  ALL 40 channels (GEMs & Mesh chn) have been ramped up and measured via Fluke by controlling them one by one through the HV Control System, which was run on a laptop connected to the PHENIX wireless. The installation channel check procedure automatically ramped & disabled channel by channel after measurement. The channel check has been completely successful!!! Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 3 of 6

INSTALLATION IN PHENIX Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008 Channel Check on the Bridge View onto the HBD from HV Bridge HBD HV Control & Monitoring System Manuel Proissl Page 4 of 6

OUR HV CONTROL :: FAQ! How do we want the HBD to operate?  Operational & Standby Voltages  Forward & Reverse Bias: dV is set manually by user for key voltages  Trip Settings: GEMs (~165mkA?) and Mesh (~20mkA?)  HV Control will be connected to the P/T database (update every 2min) and can so adjust operational/standby voltages based on layers WE need to set automatically!  Questions? Ideas? Comments? Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 5 of 6

COMING UP  Correction Curves for 1471N Calibration: this week!  Relay Board Trip tests in the hall  Simulating the HBD with load channel by channel  Distribution / Installation Files for Linux & XP/Vista Platform independence Final installation files with Installation Wizard Expected Date Online: January 2 nd, 2009 HBD HV Control & Monitoring System Manuel Proissl Page 6 of 6 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008