Work Measurement and Standard Setting

Slides:



Advertisements
Similar presentations
F O U R T H E D I T I O N Work Performance Measurement © The McGraw-Hill Companies, Inc., 2003 supplement 10 DAVIS AQUILANO CHASE PowerPoint Presentation.
Advertisements

Predetermined Motion Time Systems (PMTS)
Prof.Dr.Yasemin Claire ERENSAL
Measuring the US Economy Economic Indicators. Understanding the Lingo Annualized Rates Example: GDP Q3 (Final) = $11,814.9B (5.5%) Q2: GDP = $2,
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Chapter 3 Time Study.
Ch. 29: Predetermined Time Systems
Time Study Procedure - Overview
1 ISE Ch. 26: Predetermined Time Systems Frank and Lillian Gilbreth broke work into therbligs (elements). The next step is to assign time values.
WORK SAMPLING Lecturer: S.U.Seçkiner Source: Motion and Time Study Design and Measurement of Work.
2000 by Prentice-Hall, Inc1 Chapter 17 - Human Resources in Strategic Planning  TQM recognizes importance of employees  Education & training viewed as.
INSY 3021 Time Study Auburn University Spring 2005.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 8 Human Resources in Operations Management.
Maintenance Work Measurement
Time Study Method Step 1...Selecting Work Elements Step 2...Timing the Elements Step 3...Determining Sample Size Step 4... Setting the Standard.
Horng-Chyi HorngStatistics II127 Summary Table of Influence Procedures for a Single Sample (I) &4-8 (&8-6)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
AP STATISTICS.   Theoretical: true mathematical probability  Empirical: the relative frequency with which an event occurs in a given experiment  Subjective:
Chapter 11 Work System Design.
The Legal Environment of HRM
Business Management Agenda: Tuesday, March 26 th – Chapter 6.1 Notes & Activity Thursday, March 28 th – Chapter 6.2 Notes & Activity Tuesday, April.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
10-1 Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter 10 Human Resource Management and Labor Relations.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
Building and Managing Human Resources
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.S10 – 1 Operations Management Supplement 10 – Work Measurement © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
2000 by Prentice-Hall, Inc 1 Materi MO sesudah UTS Human Resources in Operations Management Human Resources in Operations Management.
Lecture 13 Chi-square and sample variance Finish the discussion of chi-square distribution from lecture 12 Expected value of sum of squares equals n-1.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
“Time study is the one element in scientific management beyond all others making possible the transfer of skill from management to men…..” – Frederick.
1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement.
Work Study Work Measurement.
Homework Assignment Job Shop Scheduling MGMT E Operations and Logistics Operations and Logistics Management Management ACME TOOL & DIE, Inc. Due.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management Chapter 8 Supplement Roberta Russell &
MTSU Facility Layout Arrangement of Manufacturing and Services Processes Arrangement of Manufacturing and Services Processes.
SECTION 2 STRATEGIC DESIGN
Changes in Business Activity
Planning for and Recruiting Human Resources
Work Measurement Vital inputs for: Standard Time
Measuring Output Rates Supplement H Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall H - 01.
Copyright © 2013, 2009, and 2007, Pearson Education, Inc. Chapter 12 Analyzing the Association Between Quantitative Variables: Regression Analysis Section.
Chapter 8: Confidence Intervals for One Population Mean 8.3 Margin of Error.
1 ISE Chapter 24: Determining Time/Job Uses for time/unit information  Cost allocation  Production and inventory control  Evaluation of alternatives.
1 Time Study and Work Measurement Chapters: 12.Introduction to Work Measurement 13.Direct Time Study 14.Predetermined Motion Time Systems 15.Standard Data.
10 - 1© 2011 Pearson Education Time Studies  Involves timing a sample of a worker’s performance and using it to set a standard  Requires trained and.
©The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin Two-sample Tests of Hypothesis Chapter 11.
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
7 Design of Work Systems.
Operations Management Work Measurement Supplement 10
Axioms, Interpretations and Properties
Instructor: Dr. Mazen Arafeh
Chapter 25 Time Study Supplementary Material from:
Determining the Rating Factor
JOB DESIGN Work Measurement.
Ch. 29: Predetermined Time Systems
Predetermined Motion Time Systems (PMTS) BY okolie jude…………
Predetermined Motion Time Systems (PMTS)
Basics Semiconductors
Time Studies Involves timing a sample of a worker’s performance and using it to set a standard Requires trained and experienced observers Cannot be set.
Summer Training Industrial Engineering Department
Example 1: From a random sample of 576 of a company’s employees, it was found that the average number of days each person was absent from work due to illness.
Summary Table of Influence Procedures for a Single Sample (I)
Presentation transcript:

Work Measurement and Standard Setting MGMT E - 5065 Operations and Logistics Management Work Measurement and Standard Setting Homework Assignment Due October 30th

Problem 1 A work operation consisting of three elements has been subjected to a stopwatch time study. The observed times (OTs) are: Job Element ‘A’ = .18 minutes Job Element ‘B’ = .68 minutes Job Element ‘C’ = .50 minutes For a particular worker, the performance ratings are: Job Element ‘A’ = 90 % Job Element ‘B’ = 110 % Job Element ‘C’ = 80 % By union contract, the allowance time for the work operation is: personal time: 5% ; delay: 5% ; fatigue: 10% REQUIREMENT: 1. Determine the standard time for this particular worker.

Problem 2 The preliminary work sample of an operation indicates the following: Number of times the operator is observed working: 60 Number of times the operator is observed idle: 40 Total number of preliminary observations: 100 REQUIREMENT: What is the required sample size for a 99.73% confidence level with + / - 4 % precision?

Problem 3 At Micro Manufacturing, Inc. workers press semiconductors into predrilled slots on printed circuit boards. The elemental motions for normal time used by the firm are as follows: Reach 6” for semiconductors…………………….40 TMU Grasp the semiconductor………………………… 10 TMU Move semiconductor to printed circuit board....30 TMU Position semiconductor……………………………35 TMU Press semiconductor into slots…………………..65 TMU Move board aside……………………………………20 TMU Each time measurement unit (TMU) is equal to .0006 minutes. REQUIREMENT: Determine the normal time for this operation in minutes and in seconds.

Problem 4 Ace Manufacturing Company has just observed a job in its laboratory in anticipation of releasing the job to the factory for production. The firm wants rather good accuracy for costing and labor forecasting. Specifically, it wants to provide a 99% confidence level and a cycle time that is within 3% of the true value. REQUIREMENT: 1. How many observations should it make? The data collected so far are as follows: Observation Time 1 1.7 2 1.6 3 1.4 4 1.4 5 1.4