The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.

Slides:



Advertisements
Similar presentations
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Advertisements

SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
1 SETSO TF SETSO TF NACMPF SG Congestion Management and NTC.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
on Congestion Management (IG)
Draft document – Work in progress
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
The new EU legal framework for e-procurement: Expectations and Prospects Conference ‘E-procurement and Public Spending: Status, Opportunities and Prospects’
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Transfer & Trades Special Transmission Workstream
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
WG FBA report Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 13 February 2009.
Actions for establishing a Single Auction Office for CSE 8 th IG Meeting Milan, 3rd June 2008.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
RMC Regional Market Coordination RMC Regional Market Coordination RMC Regional Market Coordination CWE Capacity Allocation Service Company CASC Presentation.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Dan G. Blair Chairman Postal Regulatory Commission.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Developments Transmission Workgroup 1 st December 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
IG Meeting Flow-based Coordinated Auction Allocation Scheme for the CEE – Region Report WG – CA Christian Todem 18 th IG Meeting, Vienna April 30 th 2008.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
WG FBA Status Report Jerzy Dudzik IG Meeting, 12 th June 2007.
29th November 2016 Teleconference
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Public Consultation : main conclusions (1/2)
Supported by: PCR Status report AESAG, September
New transparency guidelines
26th IG meeting 23th January 2014
Draft document – Work in progress
Supported by: PCR Status report AESAG, September
26th February 2015 Teleconference
29th November 2016 Teleconference
26th February 2015 Teleconference
EURELECTRIC transparency requirements
Presentation transcript:

The Status Report for IG meeting Wojciech Jarosz February 13 th 2009

1)Project Plan 2)IT-issues: status and next steps 3)Documents 4)Revenue distribution 5)Planned communication The Coordinated Auction Office CEE

The project is following the schedule presented on the next slide There are some critical issues:  Acceptance of Technical Requirement Specification  Details of concepts (e.g. Data exchange with other Regions)  Dry-runs (internal and external)  Acceptance of Auction Rules  Decision to GO LIVE Project Plan

Cons ultat ion with Mark et 09/0810/0811/0812/0801/0902/0903/0904/0905/0906/0907/0908/0909/0910/0911/09 12/09 01/10 Test calculations for D/M/Y concepts RM concept Improvement of D/M/Y concepts Scheduling concept Emergency Procedures concept/Firmness IT ContractIT Installation IT Tests & Dry- run TSOs Agreement with TSOs outside CEE region, Data Exchange, UCTE Allocation Rules Shareholders Agreement Update tools of TSOs inside & outside CEE region (incl. 7 days regime) Accep tance of Regul ators Project Plan For Next Months after last IG CAO People, Services Revenue distribution GO LIVEDry-run Market Update of Allocation Rules Rep ort for Reg ulat ors Consultation with Regulators Update tools of Market Participants Service Level Agreement Inter TSO Agreement

Technical Requirement Specification (TRS) has been submitted by IT Provider TSOs, WGs and CAO analyzed the TRS and found some open issue which need to be solved – IMPORTANT: AVAILABILITY OF DATA FROM OTHER REGIONS Several meetings have been organized for detailed discussion about TRS The acceptance of TRS is planned for the end of February 5 IT-issues status

March: Notification of PROVIDER that the CAO-IT for yearly, monthly and daily allocation procedure is error free and ready for preliminary acceptance. May: End of the failure free trial period and notification of the PROVIDER that CAO-IT for yearly, monthly and daily allocation procedure is ready for final acceptance. 6 IT-issues next steps

Auction Rules and Contracts have been submitted to IG The feedback from Regulators was presented and preliminary discussed in first part of 2008 The adjustment of Auction Rules has to be done according  the current remarks from IG  the updated processes as the results of TSOs and CAO current activity work 7 Contracts and documents

8 Revenue distribution Based on the developments and investigations of WG-CA and Consentec the following findings have been made: 1 Static factor and 2 dynamic keys proposed: Static Key: e.g. multi years moving average of historical auction income 1st Dynamic Key: Integral version of MAU key; reflects grid usage and prices 2nd Dynamic Key: AU_CP2 key; reflects flows on tie-lines and respective clearing prices (similar to bilateral auctions)  remark: based on these recommendations CAO (supported by WG- CA) can analyze the final settings; with that recommendation a huge flexibility is given (that is: currently no final decision on the sharing is related with this decision! This is to be decided later in 2009)!

9 Planned communication 1st Workshop - March Current Status of the Project and the next steps FB methodology/PTDF and AMF calculation Allocation Principles Allocation algorithm (optimization function, bidding path, CZ/SK MC) Capacity products (duration, UIOLI/UIOSI, firmness, curtailment) Transparency (which data available) Principles of participation (registration, collaterals) Capacity transfers (slicing of PTRs)

10 Planned communication 2 Workshop Current Status of the Project and the next steps Dry-run with market participants (procedure, timing, data exchange, evaluation) 3 Workshop Current Status of the Project and the next steps The first feedback from Dry-run 4 Workshop Report from Dry-run 5 Workshop Presentation of Allocation Rules Information on planned start of FBA allocation