GEO Architecture and Data Committee Task AR-07-02 Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR-07-02 Point.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEO AIP-2 Drafting a Plan for AIP-2 Test and Demonstration January 2009.
GEOSS ADC Architecture Workshop: Portals Ingo Simonis iGSI
GEOSS ADC Architecture Workshop Clearinghouse, Catalogues, Registries Doug Nebert U.S. Geological Survey February 5, 2008.
GEOSS Architecture Implementation Pilot, Phase 3 - Call for Participation - George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC December.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
SIF Status to ADC Co-Chairs
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
GEOSS Community Portal Recommendations Team Report.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium Task AR Point of.
GEOSS Architecture Describes how components fit together for providing data and information that will be better …than the individual components or systems.
GEOSS AIP-5 for World Water Online Registry An attempt to Integrate WaterML2 services in GEOSS.
Data integration and dissemination in the MARsite project John Douglas (WP10 leader)
GEOSS Common Infrastructure: A practical tour Doug Nebert U.S. Geological Survey September 2008.
Delivering Innovative Solutions to the World © Compusult – All rights reserved Compusult’s Participation in GEOSS Contributions and Operations Robert Thomas.
Global Earth Observing System-of- Systems (GEOSS) Architectural Framework Doug Nebert FGDC, U.S. Geological Survey February 2008.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
GEOSS Clearinghouse GEO Web Portal GEOSS Common Infrastructure Components & Services Standards and Interoperability Best Practices Wiki User Requirements.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
R.Husar From Dedicated to Federated Data Systems Data ProvidersDecisionsDSS CIRA VIEWS Reg. Haze EPA AQS NAAQS EPA AirNow.
Ellsworth LeDrew (UIC) Gary Foley (UIC) Jay Pearlman (UIC and ADC) Hans-Peter Plag (UIC and ADC) Rudolf Husar (UIC and ADC) David McCabe (ADC)
International Collaboration, Interoperable Data Flows, Architecture of GEOSS R.B. Husar, E. M. Robinson, J. D. Husar and M. Kieffer, Wash. Univ. G. Percivall,
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
ADC Portal & Clearinghouse GEO Architecture and Data Committee 2-3 March 2006 George Percivall OGC Chief Architect
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
Core Task Status, AR Doug Nebert September 22, 2008.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
Reference Architecture and Agile Development Presentation to NASA Standards Process Group Reference Architecture workshop at the ESIP Federation Meeting.
GEOSS Common Infrastructure: A Practical Tour Doug Nebert U.S. Geological Survey AIP-3 Kickoff March 2010.
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
Observation Integration across Disciplines in the GEOSS Architecture Implementation Pilot George Percivall and Bart de Lathouwer The Open Geospatial Consortium.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
© 2007, Open Geospatial Consortium, Inc. Implementing the GEOSS Architecture using open standards Implementing the GEOSS Architecture using open standards.
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot GEO Task AR Team Representatives: - Doug Nebert, USA/FGDC - Larry.
ESA-FAO GEOPortal STATUS & PLANS
GEO Task AR Team Representatives: Doug Nebert, USA/FGDC
GEO Task AR Architecture Implementation Pilot
George Percivall, Open Geospatial Consortium
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEO Architecture Implementation Pilot
The Architecture of GEOSS Dr
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Core Task Status, AR Doug Nebert September 22, 2008.
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
GEOSS Web Portal Working Group
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point of Contact ADC-6 February 2008 EC-JRC

Core Architecture GEOSS Component, Service registry Standards, Special Arrangements Registries references GEO Web Portal and other Clients searches Offerors contribute to register GEOSS Clearinghouse Catalogues Services User accesses list of catalogues accesses searches invokes reference

GEO Web Site Client Tier Business Process Tier Access Tier GEOSS Web Portal GEOSS Registries Services Components Standards GEONETCast Other Services Data Access Services Model Access Services Community Portals Client Applications Requirements Community Catalogues Portrayal Services Workflow Management Processing Services Other Services GEOSS Clearinghouse Sensor Access Services IOC Architecture – Engineering Viewpoint

GEOSS Architecture for the Air Quality Community (Feb 2008) GEOSS Component, Service registry Air Quality Community Portal searches Offerors registers GEOSS Clearinghouse Air Quality Community Catalog Services User finds list of catalogues Searches, harvests searches binds to references publishes provides Standards SIF Registry Adopted from Percivall, Feb 2008 by R. HusarPercivall, Feb 2008

ion_Pilot.pdf

GEO Web Site Client Tier Information Services Tier Access Tier GEO Web Portal GEOSS Registries Standards, Requirements Components, Services GEONET Cast Other Access Services Data Access Services Model Access Services GEOSS Community Portals Client Apps GEOSS Community Catalogues GEOSS Clearinghouse Sensor Access Services IOC Architecture – Engineering Viewpoint (Feb 2008) GEO Core Services Communal Services Data Services Process, PortrayOther, Workflow Community Catalogs Adopted from Percivall, Feb 2008 by R. HusarPercivall, Feb 2008

AI Pilot Development Approach DevelopmentActivities Kick-offWorkshop Call for Participation ConceptDevelopment PersistentOperations(AR-07-01) Participation ArchitectureDocumentation Updates for each step Baseline AR Architecture Implementation Pilot Evolutionary Development Process Operational Baseline for next evolutionary spiral

Process improvement ideas Comments on AIP ProcessProcess Improvement Functionality defined by developers not users UIC/ADC collaboration, Workshops: Identify operational SBA functionality AIP Process is closedDevelopment process is iterative; Emphasize anyone can join at anytime Process focused on demonstrations Emphasize operational persistence; Deliver to AR Operations Process is structured with milestones and deliverables Retain structure within a phase; Emphasize iterative & open approach

UIC - ADC Coordination Scenarios for SBA context identified through UIC/ADC coordination –Thanks to Els LeDrew (and Gary Foley) for supporting and attending UIC Goal –engage users in development and implementation of a sustained GEOSS that provides information required for societal benefit areas as specified by user groups on national, regional and global scales Next meeting of UIC: Toronto, May 6-8, 2008 –“ Kick the Tires ” workshop on Air Quality on May 5

GEOSS Architecture for the Air Quality Community (Feb 2008) Air Quality Portal Offerors Air Quality Catalog Services User finds binds to publish