Slide # 1 GEO Task AR-07-02 Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS ADC Architecture Workshop: Portals Ingo Simonis iGSI
GEOSS ADC Architecture Workshop Clearinghouse, Catalogues, Registries Doug Nebert U.S. Geological Survey February 5, 2008.
AIP-2 Kickoff Workshop Energy SBA Session Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
SIF Status to ADC Co-Chairs
Core Task Status, AR Doug Nebert September 21, 2008.
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
Initial Operating Capability Discussion chaired by Jay Pearlman, IEEE including contributions from D. Nebert ADC Co-Chair Meeting February 5, 2008.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
From “Usability Testing 2009” to the “Sprint to Plenary 2011” GEO Portal and Clearinghouse: reaching out to users with user-friendly interfaces. Gary J.
GEOSS Architecture Describes how components fit together for providing data and information that will be better …than the individual components or systems.
GEOSS AIP-5 for World Water Online Registry An attempt to Integrate WaterML2 services in GEOSS.
GEOSS Common Infrastructure: A practical tour Doug Nebert U.S. Geological Survey September 2008.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
Delivering Innovative Solutions to the World © Compusult – All rights reserved Compusult’s Participation in GEOSS Contributions and Operations Robert Thomas.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Global Earth Observing System-of- Systems (GEOSS) Architectural Framework Doug Nebert FGDC, U.S. Geological Survey February 2008.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ESA/FAO Contribution STATUS & PLANS ADC Full Committee Geneva 1 March 2007.
SIF Status to ADC Co-Chairs Siri Jodha S. Khalsa Steve Browdy.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
1 DA POC/Lead: Doug Nebert (USGS) Leads: George Percivall (OGC) Rita Almeida Ribeiro (HOLOS, Portugal) Ken Masarie (NOAA) Martha Maiden (NASA) Jimmy.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
Core Task Status, AR Doug Nebert September 22, 2008.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
GEOSS Common Infrastructure: A Practical Tour Doug Nebert U.S. Geological Survey AIP-3 Kickoff March 2010.
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEOSS Common Infrastructure (GCI) The GEOSS Common Infrastructure allows Earth Observations users to search, access and use the data, information, tools.
© 2007, Open Geospatial Consortium, Inc. Implementing the GEOSS Architecture using open standards Implementing the GEOSS Architecture using open standards.
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
INTRODUCTION: This report contains the results of the International Council of System Engineer (INCOSE) UML/SySML Team efforts to produce UML/SySML Architecture.
Implementing the GEOSS Architecture using open standards Implementing the GEOSS Architecture using open standards Douglas Nebert U.S. Federal Geographic.
GCI Architecture GEOSS Information System Meeting 20 September 2013, ESA/ESRIN (Frascati, Italy) M.Albani (ESA), D.Nebert (USGS/FGDC), S.Nativi (CNR)
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Architecture Implementation Pilot: GEOSS, FedEO, Tri-Lateral Kickoff Meeting - 5&6 June 2007 Session #7b Oil Spill, Polar, Volcano Scenarios Work Plan.
Introduction to the GEOSS Registries: Components, Services, and Standards Doug Nebert U.S. Federal Geographic Data Committee June 2007.
ESA-FAO GEOPortal STATUS & PLANS
GEO Task AR Architecture Implementation Pilot
George Percivall, Open Geospatial Consortium
Steve Peedell Joint Research Centre
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
Workplan for Updating the As-built Architecture of the 2007 GEOSS Architecture Implementation Pilot Session 7B, 6 June 2007 GEOSS Architecture Implementation.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Core Task Status, AR Doug Nebert September 22, 2008.
Closing Plenary.
GEOSS Architecture Implementation Pilot, Phase 3 AIP-3 Initial Plans – Drought Scenario - presentation to ESIP - George Percivall, Open Geospatial Consortium.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Ecosystems and Biodiversity in Africa Scenario
4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007

Slide # 2 GEO Task AR Architecture Implementation Pilot Task Description Call For Participation (CFP) Kickoff Meeting Plans

Slide # 3 GEO Task AR Architecture Implementation Pilot Lead incorporation of contributed components consistent with the GEOSS Architecture… …using a GEOSS Web Portal and a GEOSS Clearinghouse search facility …to access services through GEOSS Interoperability Arrangements …in support of GEOSS Societal Benefit Areas Title from AR task sheet

Slide # 4 GEOSS Architecture Implementation Pilot “Pilot” - implementation of interoperability arrangements in a persistent environment Develop recommendations for GEOSS Web Portal and Clearinghouse Demonstration in advance of the EO Summit –Portals, Clearinghouse/catalogues and Services –Scenario supporting one or more GEOSS SBAs. Utilize OGC Procedures for conducting a pilot Schedule: Initiation in 1st quarter 2007, 6 month development

Slide # 5 Pilot Approach *RFQ/CFP = Request for Quotation/Call for Participation Execution Task D Kick-offPreparation Task C RFQ/CFP*Development Task B ConceptDevelopment Task A Deploy Task E OGC Pilot Policy and Procedure

Slide # 6 GEO AR Coordination of Activities FEDEO Pilot Tri-Lateral Pilot GEO Tasks? Architecture and Standards for Earth Observation

Slide # 7 AI Pilot Milestones CFP Release13 April CFP Responses due11 May Pilot Kickoff meeting5-6 June, ESRIN Deploy, Integrate, TestJune to Sept. Demo CaptureSeptember 2007 Initial Operating CapabilityAfter September Plenary & Summit November

Slide # 8 GEO Task AR Architecture Implementation Pilot Task Description Call For Participation (CFP) Kickoff Meeting Plans

Slide # 9 CFP seeks collaborative participation in 3 areas Contribute existing services, e.g, portals, catalogs and other services –both services hosted by participants and/or solutions to be hosted by other organizations Develop societal benefit scenarios to guide development and demonstration of pilot services. Refine architecture; potential GEOSS Interoperability Arrangements Call for Participation :

Slide # 10 CFP Responses 24 Responses Received as of 12 May 2007 Argon/IM BKG Compusult Cranfield EC/JRC ESA et.al. FedEO ESA/FAO Portal ESONET, et.al. ESRI FGDC GBIF et.al. GEOmon GMU JPL Meraka et.al. MinesParis NASA NOAA/NGDC DMSP NOAA/NGDC Hazards OSIRIS et.al. Public Warning STFC et.al Ukraine Unidata UT/JAXA Anticipated responses: –INCOSE –GeoConnections –SERVIR –Species 2000 –US State Dept

Slide # 11 CFP Architecture Developed from RFI and Responses RM-ODP Viewpoints for architecture –Enterprise: purpose, scope, and scenarios –Information: features, coordinates, semantics –Computational: service oriented architecture Identifies candidate interoperability arrangements –Engineering: component types –Technology: component instances ISO/IEC 10746: IT-Open Distributed Processing - Reference Model (RM-ODP)

Slide # 12 Engineering Viewpoint Architecture

Slide # 13 GEO Web Portal Requirements Graphical design of Human-Computer Interface shall use GEOSS branding Link to GEO Secretariat web pages Catalog client to GEOSS Clearinghouse TBD hits per/hour with <TBD% degradation of performance vs. no-load performance. Availability >99%, i.e., ~ 7 hours of down time a month Shall be hosted on a computer hosted at TBD. Hosted on a computer at TBD Maintenance performed by TBD org.

Slide # 14 GEOSS Clearinghouse Requirements - Draft Catalog service for GEO Portal Catalog client interfaces –ISO –OGC Catalog Services for the Web (CSW) – Registry for GEOSS Community Catalog Service metadata Registration of items in the Clearinghouse Interface registries hosted at GEO Secretariat. Graphical design of Human-Computer Interface shall use GEOSS branding Provide a catalog service interface: TBD hits/day Availability >99%, i.e., ~ 7 hours of down time a month Future: –Hosted at GEO Secretariat. –Maintenance of content by the GEO Secretariat. –Maintenance of software by the contributing organization.

Slide # 15 AI Pilot CFP - SBA Scenarios Disaster: Wildfires Disaster: Tanker oil spill Climate Change: Local effects Ecosystems and biodiversity: Africa Ecosystems and biodiversity: Polar (IPY) Coordination with IP3 Scenarios Seeking users or user-representatives to participate in development and deployment of scenarios in Pilot

Slide # 16 Keeping the CFP open Responses to the CFP were due 11 May 11 May was firm close date for –GEO Web Portal –GEOSS Clearinghouse Responses for IOC due before Kickoff Open call for particiation beyond IOC –GEOSS Component Registration Process –Continue to seek additional participants

Slide # 17 AR-07-02: Output & Deliverables Persistent capability –GEOSS Webportal –GEOSS Clearinghouse/Catalogues –Services to meet SBA scenarios GEOSS Architecture Implementation Pilot Report

Slide # 18 Pilot Kickoff Meeting June 2007 ESA-ESRIN Frascati (Rome), Italy Registration and information

Slide # 19 Pilot Kickoff Objectives Begin the Execution Phase of the Pilot Refine and develop –Collaboration and interoperability goals –Detailed design based on CFP Architecture. –User scenarios suitable for demonstration. Develop detailed plan and schedule for the Execution Phase

Slide # 20 Pilot Kickoff Agenda - Draft June 5th Plenary 1: Introductions, pilot structure & agenda consensus 11.00Parallel Sessions 13:40Lunch at ESRIN Cafeteria 14.30Parallel Sessions 18.30Adjourn for the day June 6th 09.00Plenary Session #2 - Day 1 Summary 09.45Parallel Sessions 13:40Lunch at ESRIN Cafeteria 14.30Parallel Sessions 18.00Plenary Session #3 - Day 2 Summary, planning recap 19.30Adjourn for the day

Slide # 21 GEO Task AR Architecture Implementation Pilot Task Description Call For Participation (CFP) Kickoff Meeting Plans George Percivall GEO ADC Meeting, 14 & 15 May 2007