© 2013 DST Systems, Inc. All rights reserved. The California Adventure.

Slides:



Advertisements
Similar presentations
Using Lean Ideas to Get Jobs to Production Faster
Advertisements

Standard Work Making the “new way” become the standard way
Lean Manufacturing.
WAREHOUSING MANAGEMENT
Inventory Management 2.
Job Shop Optimization December 8, 2005 Dave Singletary Mark Ronski.
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Inventory Kanbans Automating the Replenishment Cycle
Supplier Development Kaizen Implementation Kit
JIT, TPS, and Lean Operations
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Lean Operations (JIT) Module
Just-in-Time and Lean Systems
Lean Operations (JIT) Module
Chapter 2 - The Value Stream
Value Stream Analysis Kaizen Training
Cellular Manufacturing and Plant Layout
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
CONTINUOUS IMPROVEMENT PROGRAM
ALTERNATIVE METHODOLOGY -KANBAN CMIS-570 Jacob Adams.
Welcome 1 Lean Overview. Housekeeping  Emergencies  Bathrooms  Breaks  Food/drinks 2.
The Value of Lean Thinking Presented by: Brian D Krichbaum Process Coaching Incorporated.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
SchedulingProducingControllingSchedulingProducingControlling.
Financial benefits of lean improvement
Takt Time Training Pack.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.
Value Analysis/ Flow Analysis
Lean Six Sigma Methodology.
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services and Support Functions.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
LeanSigma ® Fundamentals Module 4 – Specify Value.
Philosophy and Key Concepts
POUS Point Of Use Storage. Agenda POUS AGENDA »Introduction and definition Agenda | »Why / Benefits »Examples »When to Use, Not to Use »How to Implement.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
Activity Of The Product. 2freeleansite.com Activity Of The Product Activity of the product focuses the “Product or Thing” from “start” to “finish”. -
COPYRIGHT ©2002 Thomson Learning, Inc. Thomson Learning  is a trademark used herein under license. ALL RIGHTS RESERVED. C hapter 6 S ervice D elivery.
SchedulingProducingControllingSchedulingProducingControlling.
Waterspider Lean network optimization Final Project IE Deterministic Optimization Instructor: Dr. Leslie MonplaisirLeslie Monplaisir Reed Parker.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Lean training through the Lean Academy Darren Ruane, Carillion PLC
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
© BMA Inc All rights reserved. Financial benefits of lean improvement Lean planning.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Accounting Systems For Measuring Costs Chapter 17.
SchedulingProducingControllingSchedulingProducingControlling.
Value Stream Mapping The flow of your business from start to customer March 8, 2012.
Kanban. What is Kanban Kanban means many things. Literally, Kanban is a Japanese word that means "visual card". At Toyota, Kanban is the term used for.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Mel Wendell – Mountain Pointe High School
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
COMPUTER INTEGRATED MANUFACTURING
SGW WIMS Task Management Solution
Pull Manufacturing and Just In Time
By Shane A. Yount Principal, Competitive Solutions, Inc.
Continuous Improvement”
MGS 4020 Business Intelligence LSS Jul 19, 2018
Value Stream Mapping (VSM) Training
CD Kanban Store Kaizen Event
Manufacturing Production Planning
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

© 2013 DST Systems, Inc. All rights reserved. The California Adventure

© 2013 DST Systems, Inc. All rights reserved.  Before Lean  Pilot Program  Some of our improvements  What we have gained 2 Agenda

© 2013 DST Systems, Inc. All rights reserved.  No single point of scheduling  Material was precision picked by work unit and delivered to machines, operators would frequently run out of materials  Postal supplies were staged at several areas around the plant and operators would perform a necessary non value added task by leaving their machine to get their own postal supplies  There was not a effective method for delivering Printed work to the inserters  Packaging Large statements was three step process and not continuous flow  Consumables on the floor were not readily available to the operator in fact some had to be ordered at time of need 3 Before Lean

© 2013 DST Systems, Inc. All rights reserved.  Put together a core team of material and operations experts  Core team attended Lean Courses  Used one of our largest customers with daily cutoffs  Did a “Paper Kaizen” to map out the current and future state  Built a Plan for Every Part  Trained management and operators on the new process  Observed and reinforced the process 24/7 for 30 days  Made some mid course corrections (Old Habits were hard to break)  Results - Operator efficiency went up - Material shortages virtually eliminated  Results confirmed lean was the way to go 4 Pilot Program

© 2013 DST Systems, Inc. All rights reserved. 5 Production Control

© 2013 DST Systems, Inc. All rights reserved. 6 Material at the operators finger tips Easy material delivery

© 2013 DST Systems, Inc. All rights reserved. 7 Kanbans Throughout the factory Parts Supermarket

© 2013 DST Systems, Inc. All rights reserved. 8 Large statements packaged by continuous flow Material at operators fingers tips

© 2013 DST Systems, Inc. All rights reserved. 9 Postal Supplies Delivered to Machine Supplies for Job delivered to machine

© 2013 DST Systems, Inc. All rights reserved.  High speed MPS machines went from 40+% efficiency to 55+%  Materials management handled a increase of 35% in volume, took on additional tasks and still reduced staff by almost 45%  Special Handling PPLH went up 30%  Operator frustration due to running out of materials eliminated.  The pull delivery system allowed us to remove several non-value added steps from the process and reassign some other activities to keep the operators at their machines.  The pull delivery system also eliminated virtually all downtime previously associated with the inadequate supply of materials at the machines, while dramatically reducing the amount of work-in-process inventory on the floor.  52 percent gain in packages per hour, 62 percent increase in statements per hour, and a 71 percent increase in machine run time. 10 What was gained in California