Tyler C. Ladd and Dr. Robert Traver, Villanova University Evaluation of a Porous Concrete BMP: The Hydrologic Perspective Funding and Acknowledgments:

Slides:



Advertisements
Similar presentations
Katie Rousseau Clean Water Program American Rivers.
Advertisements

Introduction 5 Case Studies Impervious Cover (%) for Various Land Uses [2] [2] Low Density Residential 10 Medium Density Residential 30 High Density Residential.
Upper Providence Township Stormwater Management MS4 Program.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Cascade Charter Township
Stormwater Management 1.Reducing pollutants in runoff Pesticides and chemicals Pet and animal wastes Automotive wastes Winter salts and deicers Grass.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Stormwater Systems ARCH-433. Attendance This water closet, installed in Pullman, Washington, flushes in a counterclockwise rotation. In what direction.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Adapting Stormwater Management to Climate Change Ken Potter Department of Civil & Environmental Engineering University of Wisconsin-Madison.
Runoff Estimation, and Surface Erosion and Control Ali Fares, PhD NREM 600, Evaluation of Natural Resources Management.
Workshop for Rain Barrel Workshop Franklin County Stormwater Act 167 INFORMATION and how Rain Barrels can help ! By Nancy Cisar 3/10/09.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Low Impact Development Best Management Practices
 Development replaces permeable desert with impermeable roofs and pavement  Increases peak and total stormwater discharge  Classical approach: large.
Stormwater Management
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
Runoff Processes Reading: Applied Hydrology Sections 5.6 to 5.8 and Chapter 6 for Thursday.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Ground water.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Engineering Hydrology (ECIV 4323)
A Water Quality Loading Model for Tillamook Bay Patrice A. Melancon Thanks to: Dr. David Maidment Dr. Michael Barrett Dr. Francisco Olivera Dr. Maidment’s.
Jefferson High School Compton Creek Research Project UCLA and Los Angeles Waterkeeper Funded by the Environmental Protection Agency.
Low Impact Development and Stormwater Management in Pennsylvania Villanova Urban Stormwater Partnership – II 1 Low Impact Development.
AGENDA  What is Storm Water & Why we need to protect it  Role of the EQO  Storm Water Pollution Prevention Plan  Potential Sources of Storm.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Energy PUBLIC Running Water: Effective Stormwater Quality Practices Tracy Warner, Municipal Engineer for Ames, IA Josh Shields, Landscape Architect with.
Flooding New Orleans, Aug Flooding –Varies with intensity and amount of rainfall –Perhaps the most universally experienced natural hazard Flood.
Hallstead Borough and the Northern Susquehanna River Watershed Association presents Hallstead Borough and the Northern Susquehanna River Watershed Association.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Impacts of climate change on the Chicago River system.
Seifu A Tilahun School of Civil & Water Resources Engineering,BDU Storm Runoff and soil erosion processes on the Ethiopian highland.
Rebecca Schneider, Nancy Trautmann, & Linda Wagenet Cornell University Roadside Ditches: A Watershed Curriculum Module.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Engineering Hydrology (ECIV 4323)
Why Single-Event Modeling Doesn’t Work for LIDs presented at Stormcon 2009 Anaheim, CA August 2009 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
STORMWATER MANAGEMENT
Sediment Delivery to the Watonwan River
An Overview of our Community’s Stormwater Management Program
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
Jefferson High School Compton Creek Research Project UCLA and Los Angeles Waterkeeper Funded by the Environmental Protection Agency.
ASCE LID Conference LID Analysis Considerations in Western Washington November 17, 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Area of Interest 1.Uncontrolled runoff from impervious surfaces 2.Unstable banks 3.Undercut banks 4.Massive erosion 5.Loss of biotic integrity.
Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?
Manure Storage Systems and Structures Determining environmental impacts of manure storage and storage systems on the farmstead. Joesph Kelpinski, MAEAP.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
HYDROLOGY AND WATER RESOURCES ENGINEERING PARUL INSTITUTE OF ENGINEERING & TECHNOLOGY. Semester:- 5 th Branch:- Civil Engineering.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Comprehensive Thinking and Planning
Lesson 4 Student Activity Solving Water Quality Concerns: Best Management Practices (BMPs) Answer Key for Photos and Line Drawings Student Directions:
LOW-IMPACT DEVELOPMENT
Engineering Hydrology (ECIV 4323)
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Stormwater Management
Hydrology CIVL341.
Engineering Hydrology (ECIV 4323)
Hydrology CIVL341 Introduction
Reducing Stormwater with Trees and Native Plants
Engineering Hydrology (ECIV 4323)
Urban Hydrology & Stormwater management
Presentation transcript:

Tyler C. Ladd and Dr. Robert Traver, Villanova University Evaluation of a Porous Concrete BMP: The Hydrologic Perspective Funding and Acknowledgments: Funding for this project was provided by the Pennsylvania Department of Environmental Protection and Villanova University. Special thanks to Dr. Andrea Welker, Clay Emerson, Michael Kwiatkowski, Matthew Prokop, and Matthew Rea for their help and support. Abstract There is an increasing concern about the environmental impacts of urbanization. Impervious coverage such as rooftops and roadways are replacing wooded natural areas. Impervious cover prevents infiltration and creates excess runoff from storms by not allowing rainfall to come in contact with the natural soil. It is this infiltration that replenishes the groundwater which in turn provides baseflow for streams. Impervious systems like gutters and storm sewers channel rain water directly to streams and rivers. While paved areas decrease baseflow, they increase flood flows causing erosion and sedimentation downstream. Innovative stormwater management practices are being developed to help mitigate these problems. Best Management Practices (BMPs) are techniques that can be both aesthetically pleasing and cost effective with the purpose of protecting and improving water resources. Introduction The focus of this study is to evaluate the effectiveness of a Porous Concrete BMP from a water quantity standpoint. In the summer of 2002, the common area between two dormitories, which was formerly an asphalt paved area, was reconstructed and outfitted with three infiltration beds overlain with porous concrete. The site is designed to collect stormwater from the surrounding buildings and grass areas. The runoff is then diverted to three infiltration beds. The site is instrumented to record rainfall, soil moisture levels, and the amount of water leaving the site. A computer model of the site was created using HEC-HMS, a hydrologic model developed by the Army Corps of Engineers. The effectiveness of the BMP is a measure of its ability to infiltrate runoff. The site will be monitored for long-term performance. The results of this study will hopefully encourage the implementation of these BMPs. Pre-Construction Research Objectives -To determine the percent of annual rainfall infiltrated by the BMP -To compare pre-construction functionality with new design functionality -To monitor the effects of antecedent dry days on infiltration -To create a computer model to predict the effects of future storms -To monitor long-term site effectiveness March 20, 2003 Storm – 1.81 inches March 26, 2003 Storm – 0.32 inches March 28, 2003 Storm – 0.59 inches Preliminary Model Results: V-Notch Weir in Stormdrain used for measuring site outflow Instrumentation Water Content Reflectometers used for measuring soil moisture content Moisture Fronts vs. Rainfall Weir Outflow vs. Rainfall Areas Draining to Infiltration Beds Post-Construction Porous Concrete in action Porous Concrete (foreground) during a rain storm Conclusions -The BMP appears to be extremely efficient at infiltrating stormwater -The BMP is exceeding hydrologic design expectations -More storms required for better model calibration -The BMP can effectively handle storms with 2 inches of precipitation