Graham Beck 6 Feb 2015 1 Thermal QC Options for the Bare Stave/Petal Core This is about thermal QC, i.e. during production. Aims Primary: Verify that the.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Thermostats, Pressure Switches, and Other Electric Control Devices
TYPES OF MECHANICAL SYSTEMS
1 Thermography of Buildings Stacey Ward - BSRIA Instrument Solutions - - Sales Manager -
MICE absorber and Window / flow Design Wing Lau, Giles Barr & Stephanie Yang Oxford University MICE Meeting Berkeley, Oct 2002.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Lesson 15 Heat Exchangers DESCRIBE the difference in the temperature profiles for counter-flow and parallel flow heat exchangers. DESCRIBE the differences.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
ISAT Module III: Building Energy Efficiency
IBL temperature analyses Bart Verlaat 22 April
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Coolant Performance (re thermal tests) Graham Beck WP4 25 Sept R.Bennett: Water + 40% Glycol at -20C, 1 litre/min, 1/8” pipe: htc = 658 W/m.
? ? ? ? ? ?.  3 POINT BENDING TEST :  Varying loads and spans  Variables measured in the gravity center:  Deflections with vision machine  Strains.
Introduction Topic: The Basic Ground Source Heat Pump Name: Matthew Stoangi Objective: To provide a clear understanding of the mechanics involved in the.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Review for Test Friday.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Graham Beck, LBL September Stave Core (“Plank”) Thermal QA - UK Motivation for Thermal QA: Building 24 modules to populate a plank costs a lot of.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Thermal Control System. The Three Mechanisms of Heat Transfer Conduction - The transfer of heat through a solid –Interface Heat Exchangers –Cold plates.
Graham Beck, WP4 - 2nd Oct QA/QC of completed stave core: What test systems exist? Generally: QA tests are under discussion/development (slow but.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Graham Beck 23 Jan Thermal QA Options for the Bare Stave (or Petal) Core ! This is about the production phase. ! Test Systems should be ~ identical.
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
WP4 Liverpool 21 June 2012 Graham Beck 1 Summary/Update of Steady State FEA: Perfect Plank and Plank with a small fault. New: Simulation of Transient behaviour.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Prepared by : Nishant .A. Raval
A two-stage system for the future cooling system.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Skeleton contributions to targets section
Aachen Status Report: CO2 Cooling for the CMS Tracker
update on UT cooling system
Studies in zeotropic C2F6/C3F8 blends for reduced temperature cooling of the ATLAS SCT and pixel detectors + HTC measurements in these blends G. Hallewell.
Lesson 24 NATURAL CIRCULATION
Recirculating CO2 System
Tests on a dummy facet of PIX upgrade using CO2 cooling
Aachen Status Report: CO2 Cooling for the CMS Tracker
Presentation transcript:

Graham Beck 6 Feb Thermal QC Options for the Bare Stave/Petal Core This is about thermal QC, i.e. during production. Aims Primary: Verify that the core functions thermally i.e. will remove module heat. Secondary: Check mechanical integrity (thermal signature of stave construction faults ). QC tests -will be made on every stave / a fraction / none? … depending on yield and experience. -should cause minimal damage/degradation (e.g. non-contact measurements). - should be made with ~ identical systems, that users are happy with, across sites. Possible Tests: Please suggest additions / alternatives / details (e.g. T ranges) ! 1)Thermal Performance: Fluid through pipe (e.g. CO 2 at operating T) + Surface thermal load (to mimic modules). Measure surface T distribution. 2)Thermal Cycling: e.g. -40C to +40C, followed by thermal/mechanical tests (tbd). - from this morning’s Freiburg summary (Sergio): -35/-40C to T g (+30/50?) 1)Thermal Shock: Robustness against Power and/or Coolant ON  OFF + accidents!

Graham Beck 6 Feb Issues: Expect flow rate LOW for 2mm id pipe (BNL to check full length sample) >5C T rise around loop. [FD flow calcns ok to ~ 20%. htc ≈ 4000 W/m 2 K ] !! Worse performance for equivalent chiller in Europe (50Hz cf 60Hz). Precision IR measurements of absolute T unlikely: camera systematic errors (~ 4C vignetting, narcissus – also known to QMUL). Thermal load poorly defined - but expect very similar to module load. Providing flow is acceptable, GOOD for comparative tests + finding localised faults. (Note BNL core pressure test does not check foam-pipe joint). Thermal Performance Test. What we have so far: BNL Chiller circulating LIQUID (hfe7100 ) at -35C. 6bar? Thermal load from ambient (box flushed with N 2 ) Surface T from scanned IR camera: – NON-contact! - Clearly can detect missing glue between facing and foam (built-in faults, ≥20mm long).

Graham Beck 6 Feb WARM liquid: A potentially quick, first stage QC of thermal performance. e.g. hfe7100 at +40C (chiller). Q transfer to ambient ≈ 30% module heat. Simple set-up: no N 2 box, easy IR view Useful so far, flowing water (eventually must replace by hfe due to corrosion concern). Stitch-up of ~ 12 IR thermograms (each distorted due to ~20° viewing angle) US Stave250 (foam sealed with BN/Hysol, CGL joint) looked uniform UK Plank7 : unreliable joint between foam and pipe or facing? (3C wobbles, confirmed by TCs. Not seen on reverse face) camera was eventually tilted!

Graham Beck 6 Feb Alternatives: BNL-like Chiller + hfe7100 (in cooling pipe). In principle much faster (if well insulated). T Range: -35C to +50C. (lower T possible, see later). TRACI Evaporative CO 2 (if adequate control) : -40 to about +15C only. For higher T need heating elements too. Thermal Shock not investigated, but expect possible with either CO 2 or Chilled liquid. Thermal Cycling (Freiburg summary (Sergio): environmental chamber ok for petals, difficult for staves) QMUL “Coffin”: custom built environmental chamber. Cooling by liquid N 2 dewar boil-off (77K). Switched (noisy). Heaters. Fanned circulation. Large volume (stack several staves). Convective exchange with surface => ±50°C cycle takes 1 hour. Doesn’t rely on cooling tube => useful for bus tapes etc pre-assembly (but a cooling tube based chamber could be faster?).

Graham Beck 6 Feb Liquid hfe7100 Bi-phase CO2 Lytron Chiller (AMS)TRACI Blow-off Stave T range (C, approx.) -35 * => => +15 Pressure [bar] 6 10 – 50 Programmable ? Yes Yes (tbc) No ! (e.g. for Thermal Cycling) (but need heaters?) Other advantages Off-the-shelf, Moderate P. CO 2 – as ATLAS Other problems Low flow rate (add aux. Build effort ! Build effort ! pump: HighP/LowT spec!) User friendly? Need bottle bank? Safety issues? Capital cost * £19k (no hfe7100 warranty) £50k ? (initially) £5k £38k (-80/+50C, hfe7100) Capability can usually be extended by investing £££s + technical expertise (where available). TRACI capabilities to be discussed with Lukasz Zwalinski (ff. feedback from today). What is minimal acceptable thermal QC? What is best combination of test apparatus using Liquid (chiller), Gas (N 2 cycling) and bi-phase (CO 2 ) ? Need a plan – solution will depend on QC requirements (need agreement on these)

6 Example of a non-production QC setup: UK Thermomechanical Stave (2010) + Blow-off CO 2. Destructive: glued dummy modules + ntcs. Graham Beck 6 Feb 2015

BNL BN-Hysol samples for thermal conductivity measurement. (Centrifuged to de-gas. Room temperature cure...) BN: ZYP, PT140, PT180, Goodfellows × 10, 20, 30% by weight. - LBNL: Thermal Diffusivity apparatus. - QMUL: TIMTower - a ±5% measurement? On-going effort to ensure understand IR systematics (background, response..) Need more equal  Ts sample vs tower: Replace Cu (385) by Pb (35.3) W/mK) Graham Beck 6 Feb T vs height

8 Laser surface height measurement ( two of slides from Dave Lynn, Jan 2015) -Detects built-in missing glue faults (plus maybe an unintentional one!...) -working on speeding up + reducing noise spikes (IR, for comparison)

9