Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

RECYCLING A Rough Guide.
I Situation of water supply and sewerage in Beijing 1. General situation of water supply business Beijing, the driest city in the world: Lack of water.
Waste Management in Latin America
Limited Liability Company 2011 june. 1 Description of the location 2 Main characteristics 3 Capacity and technological process 4 Services 5 Prospects.
Business Park Project: Business Park Project: ‏ Logistic Park, Industrial Park, Gas Station, Shopping Center, Office Building, Restaurant and Motel ON.
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
2012 Investment project of cement plant construction in Soligalich municipal district of the Kostroma region.
Waste Generation Stage Secondary Collection & Transportation
Municipal Waste Statistics in Belarus. The owner of municipal waste statistics in Belarus is the Ministry of Housing and Utilities.
Innovation Centre at University of Latvia: structure and costs calculation BSRUN Warsaw 2011.
REPUBLIK INDONESIA 1 Tsunami Recovery Waste Management Programme (TRWMP)
Italian Ministry for the Environment, Land and Sea National Workshop: Developing Environmental Infrastructure Projects in the Waste Sector in Serbia Case.
Regional Workshop on Recycling
14 Financial and Economic Aspects 1/13 Content of Lecture 14.1 Costs of solid waste collection, sorting and processing 14.2 Benefits of managing solid.
Sustainable waste management by an integrated solid waste treatment plant in Friesland, the Netherlands.
Association of International Road Carriers of the Republic of Tajikistan "ABBAT” Dushanbe – 2014.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
Presentation of workshops on environmental sanitation for the 6th year semester.
Building of multifunctional geothermal rehabilitation town InterMedicalEcoCity Project goal: «InterMedicalEcoCity» - is an International Medical Rehabilitation.
14/10/2015European Agency for Reconstruction1 Water & environment.
Prepared by Changhun Kim
Construction of tourist complex and yacht club (Stage I) in Kherson. Improvement of recreational and coastal urban beach area in Hydropark (Stage 2 ).
22ha site suited for industry & logistics GUGESTI, ROMANIA:
Presentation of investment projects of Kherson Sea Port.
Territory of your possibilities! «DAMU ALMATY» Industrial-logistics park september 2009.
FOOD ENGINEERING DESIGN AND ECONOMICS
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
Building of inter-district wholesale trade base, the wholesale market "Gifts Prusyvashshya" Idea of the project: organization of inter-district wholesale-
PAMUKKALE UNIVERSITY DENİZLİ, TURKEY Rome Meeting July 4-8, 2007.
September 23, 2005 Local Hazardous Waste Management Program in King County Washington Program Funding.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Building of the tourist complex “Saygon Step” Idea of the project: the result of the project implementation will be creation of a complex recreation center.
Sustainable public transport – electric transport development project for the capital.
1 Chemical park Tagil. Approximate number of population of Nizhny Tagil – more than 379 ths people. Main local industries are ferrous metallurgy, machine.
FREE ZONE PIROT. Basic information about Free zone Pirot  Established in 1996  Land more than 103 ha  Export processing zone * main customer Tigar.
Reconstruction of coastal recreational parkland in Nova Kakhovka Project idea: landscaping of the city park along the Dnipro River (length is 1 km), development.
The Priority Environmental Investment Programme for South Eastern Europe – PEIP National Workshop Developing Environmental Infrastructure Projects in the.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
Promotion of Biogas Production and Development in Latvia Astrida Celmina Ministry of the Environment Republic of Latvia.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Session 1: Initial Steps: Initial Steps: Getting your program off the ground Getting your program off the ground Community Benefits Community Benefits.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
«FINANCIER» Brief presentation of the investment project.
Recycling in the IVAR - region Sibiu, november 2009 Tron Ree, Chief engineer IVAR IKS.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
Landfilling in Ukraine – current state of problems by Michael Hoffmann 1) and Valeriy Mikhaylenko 2) 1) Institute of Water Problems and Land Reclamation,
INVESTMENT PROJECT Building regional garbage facilities.
1 Construction of the waste incineration plant with the mini-CHP in Izhevsk 2015 Preliminary presentation.
Strategy and tactics of local government
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
FEZ GRODNOINVEST ADMINISTRATION
System for waste management
The Times 100 Business Case Studies
Information about the resort recreation area "Kenderli"
SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving.
SUMMARY Of project of deep processing of red pepper seeds to give water soluble oil with capsaicin 2700 tons capacity / year * *resume has familiarization.
- Customs duties exemption
“Developing Solid Household Waste Management in Ukraine”
PROJECT OF CONSTRUCTION OF POWER STATION ON BIOMASS 76 MW
10 MW BIOMASS POWER STATION CONSTRUCTION PROJECT
Port Infrastructure Development for Ensuring Sustainability
PROJECT REPORT PREPARATION
Presentation transcript:

Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment facilities of Tsyrypinsk estimated area of 25.0 hectares Total Project Cost : 4 mln. $ Expected result: waste utilization in Tsyrypinsk; Possibility of waste recycling from surrounding areas (The complex is designed for 60 thous. people.); Reducing the required areas for waste disposal landfills; Profit through sales of secondary raw materials and recycling sorted waste (metal, plastic, paper, building materials); Profit from sales of electricity that will be produced during the recycling. Current status of project implementation: approved a detailed plan of placing waste processing plant with a sorting line, a platform for temporary waste storage on a land plot near treatment facilities of Tsyrypinsk and granted permission to manufacture of land documents on transfer of land plots for permanent use. Received positive expert report of SE «Ukrderzhbudexpertysa» on the plant feasibility. Obtained an expert report of SE «Ukrderzhbudexpertysa» for construction of the first stage of waste recycling plant with comments, the main of which is the necessity of land allocation for the relevant construction In May, Last year in SE «Land Management Institute» was ordered the project of land documents for allotment of a land plot for construction of the plant, which is currently undergoing approval and examination. Payback period: First stage –construction of solid waste sorting complex. Second – commissioning of the waste recycling plant with a total capacity of 10 ths. tons / year, and related businesses in processing of secondary raw materials. According to calculations, under favorable conditions, investments will pay off on fifth - sixth year of the enterprise operation. Project benefits : High social value of the project; Environmental feasibility;High profitability of the project; Possibility of introducing complex in two stages; Availability of preliminary project developments, approvals, and land plots ready for construction; Co-financing of the construction from the the local budget; Established and organized system of collection and transportation of ТSP (transport, staff, production facilities) Infrastructure and Resources: Tsyrypinsk is located in the south of Ukraine, 10 km from Kherson; Population is 25,01 thous. people; The route of European importance runs through the city Е97 Kherson-Sochi-Batumi-Acala; The nearest international airports: Simferopol – 250 km, Odesa – 223 km; The nearest ports : river– Kherson – 10 km, sea – Skadovsk 80 km. Sales market: to specialized enterprises on a contractual basis Creating jobs / social effects: the project provides sanitary and household facilities: wardrobe indoor clothing rooms, showers (like changing rooms), dressing rooms, bathrooms, feminine hygiene rooms, dressing overalls rooms, overalls storerooms, heating and meal rooms, medical center. Provided administrative staff rooms, operator of weighing equipment, guards. Employees are provided with special footwear and clothing under the current legislation. Installation of coolers with a deinking water is expected in heating and eating rooms. Water for technical use is expected to take from artesian well. Profitability: sales of secondary raw materials -1 mln. $./year; Sales of electricity and heat-145 thous. $./year.