Classification: Statoil internal Status: Draft

Slides:



Advertisements
Similar presentations
Shaping the Future of Water Services Implementing the Vision for Irish Water Dr. John Tierney Managing Director Irish Water.
Advertisements

Kuwait Gulf Oil Company (K.S.C.) A Subsidiary of Kuwait Petroleum Corporation Enhancing Reservoir Performance and Production Capability of Divided Zone.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Canada-Newfoundland and Labrador Offshore Petroleum Board ICRARD 2010 W. Bobby.
The Business Value of Using Sensors Atul Arya, BP plc Presented at the 2008 IBM Almaden Institute.
© 2011 Chevron Copyright People, Process and Technology Making IT a strategic capability Randy Krotowski CIO, Global Upstream Chevron Corporation.
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
Update on WITSML deployment in BP - Energistics Public Meeting Houston, 28 May 2009 Dr Julian Pickering Field of the Future Business Deployment.
TNO Measurable Impact EARTO Working Group on Quality and Excellence 20th June 2011.
Low Oil Price – No Time to be Smart? Pieter Kapteijn, Dir. Technology and Innovation Maersk Oil, Copenhagen IO Conference Trondheim Norway 29 September.
© Copyright IBM Corporation 2008 Thoughts on Current and Future Trends in Integrated Operations Tony Edwards BG-Group, Head of iValue iE2008 Organising.
FuTech Systems Business & Engineering Solutions Technology Group Business & Engineering Solutions Technology Group is a Business Group that involves.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
MCS Business Profile Yr Copyright (C) MCS 2013, All rights reserved. 2 MCS Business Focus MCS Business Profile MCS has a business.
It’s About Time Sanjaya Sood May, Initials Key Industry Drivers The Emergence of Three Main Trends Introduction of new enabling technology, bringing.
Genelco Software Solutions © 2007 IBM Corporation “Innovations In Action” Awards.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
The Role of Communications in Mining Innovation Mining Automation Remote Operations & Control Critical Communications About Us.
MCS Business Profile Yr Copyright (C) MCS 2013, All rights reserved. 2 MCS Business Focus MCS Business Profile MCS has a business.
1 © 2008 OSIsoft, Inc. – Company Confidential Customer Cases PI in Oil & Gas British Petroleum.
The future of e-field operations Real Time Operations.
INTEQ Answers While Drilling SM John Shields Director of Software Baker Atlas/INTEQ Houston, TX.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
E&pdct Benefits of WITSML to Drilling & Completions Presentation to Energistics 2 nd Annual Standards Summit Houston - 6 th November 2007 Julian Pickering,
The Coalition for Action on ICT enabled change in Europe.
Journey to a Real Time Enterprise
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
The Eyeblaster ACM Advertising Campaign Management.
Integrated Information Platform for reservoir and subsea production systems Stavanger April 6th 2005.
Planning and Analysis Tools to Evaluate Distribution Automation Implementation and Benefits Anil Pahwa Kansas State University Power Systems Conference.
11 Drilling and Well Centre for Improved Recovery
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Thore Langeland, Ph.D. Manager IO, OLF Information sharing in the Norwegian offshore industry Hilton Americas Hotel, Houston, March.
Classification: Statoil Internal Status: Draft Technology Strategy Co-operation Force meeting
We set the standard Global Topology Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical.
Update on WITSML deployment in BP - Energistics Public Meeting Dubai, 19 November 2008 Dr Julian Pickering IT Programme Manager Drilling & Completions.
IntelliSense.io Beyond the hype - Real World Applications / Solutions of Internet of Things.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Sense Intellifield is an independent supplier of products, systems and solutions for real time integrated operations to operators/contractors in the oil.
WITSML status and road ahead in StatoilHydro Energistics meeting june Lars Olav Grøvik.
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
Real time data in Statoil
WITSML Paris 16-May-2007 Rick Morneau
Integrated Operations and the use of WITSML in Statoil WITSML meeting, October 19, 2006 Peter Eilsø Nielsen Senior Advisor Subsurface.
Shell Exploration & Production Copyright: Shell Exploration & Production Ltd. 6/5/2016 File Title Shell taking the next step with WITSML May 2008 Update.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
Building a Permanent Infrastruture including in e-field operations Real Time Operations.
Combining Cloud Power with Mobile Technology, Fielding Systems Is Delivering the Digital Oilfield to Modern Oil and Gas Production Companies COMPANY PROFILE:
Using WITSML to deliver value in BP Presentation to public meeting 16 th May 2007 Dr Julian Pickering, Domain Lead Drilling & Completions BP Research.
8th Oct 2015 DIRECTOR BUSINESS DEVELOPMENT, WATER, INDIA PMP, C. ENG. MICE, MIET RAJESH PATWARDHAN SMART SOLUTIONS – ENERGY AND WATER.
1 1 Presenter / date if required Independent, integrated thinking.
WITSML SIG Area of Interest –the definition, movement, and storage of drilling data, information, and knowledge, especially the “right time” seamless flow.
 Business Empowerment Bert van den Berg 11 March 2000 / Monterey.
e&pdct Using WITSML to deliver enhanced D&C performance in BP Presentation to public meeting 19/10/06 Julian Pickering, Domain Lead Drilling & Completions.
PRODML Roadmap Energistics 2 nd Annual Standards Summit 2 November 07 Laurence Ormerod, Weatherford.
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Providing intelligent maintenance solutions for intelligent aircraft.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
Improve the Performance, Scalability, and Reliability of Applications in the Cloud with jetNEXUS Load Balancer for Microsoft Azure MICROSOFT AZURE ISV.
WITSML direction in BP SIG Public Meeting – May 2006 Dr Julian Pickering Domain Lead, Drilling & Completions.
AWTC – Seminar Outline 2004 Seminar content outline Advanced Wells – Lessons Learned and Future Directions/Opportunities –Application status and experience.
A Brave New (connected) World – IoT& DX November 2015 Mark Walker – AVP Sub
Scales Technology FZCO
APPEA 2017 Miranda Taylor CEO.
Oil & Gas Integrated Operations using aspenONE
The future of e-field operations
TrinityIoT Premises Monitoring.
Infinium Energy Services
Digital twin for infrastructure: Asset health and availability governed from predictive modelling and data processing. Johan Jonsson Genève 21 November.
© 2016 Global Market Insights. All Rights Reserved Subsea equipment Market trends research and projections for 2019 – 2025.
Presentation transcript:

Classification: Statoil internal Status: Draft Integrated Operations: a corporate initiative in Statoil ‘Why we focus on the development of WITSML’ Peter Eilso Nielsen Senior Advisor pen@statoil.com

Main challenges and drivers for Innovation

What is Integrated Operations? Corporate Initiative: Integrated Operations What is Integrated Operations? Increase the efficiency of exploration, operations and new developments, through the use of new work practices Better and faster decisions Utilize technology that brings competence, data and tools together in real-time, independent of location Seabottom - seismic Downhole sensors and processing equipment Equipment for operation of offshore facilities Fibercable Virtual model Onshore support centres Collaboration Operator Suppliers Notice what is denoted as a Virtual Model, which is a representation of the assets in sucha a way that it make sense for the various decision makers. This can be reservoir engineers, drilling operations, maintenance, operational issues etc.. The virtual model is also relevant for the suppliers, which have responsibility for monitoring/control of some functions. Information management is crucial, that is, the information needed in the right format to make good decisions !

Statoil activities on IO Konserninitiativ: Integrerte Operasjoner Statoil activities on IO The corporate initiative is a sum of activities at many different locations within a large organisation R&D, pilots, deployment, IT infrastructure, ……

Focus areas for the corporate initiative on Integrated Operations Corporate initiative: Integrated Operations Focus areas for the corporate initiative on Integrated Operations Wide deployment Wide deployment Pilots Wide deployment R&D Pilots Pilots 03.05.2005

Digital Technology enabling subsurface progress and innovation in the following areas: Integrated Operations (eField, real-time operation, DOFF) Remote operation Automation of processes (drilling, well operation, production, maintenance) Digital intelligence to aide control over multiple operations New organizational patterns in the oil industry Within companies (from field to real asset operation) Between oil companies and supplying/vendor industry Changes in the geographical location pattern in the oil industry

Depth based project data db Timebased drilling data db Vision Automated and remotely operated fields. Global acquisition & access of RT data Depth based project data db Timebased drilling data db (Coming soon) RTS service Onshore Operational Centre Anywhere Home Office

Tail Production Ambition Research ambitions Subsea IOR Ambition Tail Production Ambition OPEX ∆ = 30% 70% Recovery factor 55% recovery factor 70% recovery factor Integrated Operations will contribute in reaching the Subsea IOR and Tail Production ambitions

The Integrated Operations Vision Full integration across portfolios Step 3: 2015 Business integration Integration per asset Remote operation from onshore location Step 2: 2008 Integration of disciplines Step 1: Now Integration offshore/onshore Implementation of OOCs Transfer of people from offshore to onshore Automation and remote operation

Key focus areas of the project Remote operations (enabled) within 2008! Integrate competency and information towards decisions Automatic monitoring Real-time processing and analysis Work processes and decision support Safe and reliable data and communication infrastructure Onshore control room work processes Change management support Condition monitoring of Facilities Down hole flow, P and T measurement (fiber) Permanent Ocean bottom seismic Fast update of geo & reservoir models Production and process optimisation tools Well planning and drilling optimisation Condition based maintenance applications Integrated fiber optic system Data transmission from bit to surface Safe and reliable offshore network Standards and protocols, applications integration Data Management platform

gap – let these visions challenge each other today THE CHALLENGE: Business Unit focus for ’Integrated Operations’ is on technology that is available. The R&D vision focus on the future and stretching technology Business unit vision: eField possibilities for each field/asset – how far can you get by the use of today's technology? R&D vision: independent of qualified technology – everything is possible – economic evaluation will decide implementation gap – let these visions challenge each other today

Integrated Operations Integrated Operations The 2008 project goals Increased recovery factor: 2-5% Increased daily production: 5% OPEX reduction: - 30% Reduction in HSE related unwanted events: - 50% Integrated Operations 2008 Business drivers Implementation of Tyrihans smart field concept Campaign and condition based maintenance in Tampen Remove turnarounds Remote operation of wells and process facilities on Tampen ICT infrastructure enabling 24/7 onshore operations centers Integrated Operations 2008 Goals Field of tomorrow – business for the future