MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Progress on the MICE Cooling Channel Solenoid Magnet System
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
RF Cavity / Coupling Coil Module
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE RFCC Module Status: RF Cavities Derun Li A. DeMello, S. Virostek, M. Zisman Lawrence Berkeley National Laboratory NFMCC Collaboration Meeting The.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Overview of the RFCC Module and 201-MHz Cavity Design
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 2 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Outline Overview of MICE RFCC module Overview of MICE RFCC module ― RF cavities and superconducting coupling coil magnets Current status of the RFCC module Current status of the RFCC module Plan and schedule Plan and schedule — Success oriented schedule Concerns and risks Concerns and risks Summary Summary

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 3 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Overview of MICE RFCC Module Two RFCC (RF cavity and superconducting Coupling Coil magnet) modules in MICE cooling channel: compensate for muon longitudinal energy losses in AFC RFCC module

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 4 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Overview of MICE RFCC Module (cont’d) Each RFCC module has four 201-MHz NC RF cavities and one SC coupling coil (solenoid) magnet; each RF cavity has a pair of curved Be windows and coaxial loop couplers 201-MHz cavities SC CC magnet

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 5 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 The RFCC Module: RF Cavities Four normal conducting 201-MHz RF cavities mounted in a vacuum vessel Four normal conducting 201-MHz RF cavities mounted in a vacuum vessel ―Cavity is formed by e-beam welding from two spun half shells; ―Large beam iris (21-cm radius) terminated by thin and curved beryllium windows (no differential pressure on the windows); ―Four ports on each cavity: two coaxial loop couplers with integrated ceramic windows; one vacuum port; one view and diagnostic port; ―Six evenly spaced tuners on cavity equator; ―Water cooling pipes brazed to cavity body; ―EP of the cavity inner surface; ―Support structure.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 6 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 The RFCC Module: SC CC Magnet Design and fabrication in collaboration with Harbin Institute of Technology (HIT) and Shanghai Institute of Applied Physics (SINAP), fabrication contract awarded to Qi Huan Company in Beijing, China Design and fabrication in collaboration with Harbin Institute of Technology (HIT) and Shanghai Institute of Applied Physics (SINAP), fabrication contract awarded to Qi Huan Company in Beijing, China One superconducting coupling coil (solenoid) magnet around the four RF cavities: One superconducting coupling coil (solenoid) magnet around the four RF cavities: ―Largest magnets in MICE:  Diameter  1.5 m and 281-mm of coil length;  Stored energy  13 MJ;  250 A (design value), 166 turns/layer and 96 layers ; ―Three cryocoolers (baseline) to cool the magnet at 4.2 K; ―Quench protection: passive with cold diodes and resistors; ―Self-centering support system of the cold-mass; ―Superconductors: 1 mm by 1.65 mm (  87 km/coil).

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 7 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Current Status of RFCC Module RF cavities: RF cavities: All ten cavities (two spares) received at LBNL and five measured; All ten cavities (two spares) received at LBNL and five measured; Received and accepted nine beryllium windows; Received and accepted nine beryllium windows; Ten ceramic RF windows ordered and received ( 4 at LBNL and 6 at UM); Ten ceramic RF windows ordered and received ( 4 at LBNL and 6 at UM); Six full size tuner flexures are being fabricated at UM and LBNL; Six full size tuner flexures are being fabricated at UM and LBNL; Components for 6 actuators are to be fabricated at UM; Components for 6 actuators are to be fabricated at UM; Cavity post-processing (surface cleaning and preparation for EP) to start this year at LBNL; Cavity post-processing (surface cleaning and preparation for EP) to start this year at LBNL; The single cavity vacuum vessel drawings are complete and sent to Fermilab, and fabrication will start. The single cavity vacuum vessel drawings are complete and sent to Fermilab, and fabrication will start. SC CC magnets: SC CC magnets: 1 st coil winding complete at Qi Huan Company; 1 st coil winding complete at Qi Huan Company; Cover plate of cold-mass and LHe pipe starts at HIT in early June 2011; Cover plate of cold-mass and LHe pipe starts at HIT in early June 2011; Cryostat design complete; Cryostat design complete; Plans for cold-mass and cryostat testing are being developed. Plans for cold-mass and cryostat testing are being developed.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 8 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 All Ten RF Cavities (Two Spares) at LBNL Fabrication set-up cavity One cavity on inspection stand Six cavities in their shipping crates; three cavities are stored in another location

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 9 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 RF Cavity Electro-polish at LBNL RF Cavity Electro-polish at LBNL The inner surface of each cavity will be electro-polished at LBNL using the techniques developed at JLab for the prototype cavity at MTA, Fermilab; The inner surface of each cavity will be electro-polished at LBNL using the techniques developed at JLab for the prototype cavity at MTA, Fermilab; EP setup and testing starts Oct. this year. EP setup and testing starts Oct. this year.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 10 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 RF Cavity Frequency Tuner Components Dual – action actuator Flexure tuner arm RF cavity

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 11 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 RF Cavity Frequency Tuner Flexure Six tuner flexures are being fabricated at the University of Mississippi, the first one arrived LBNL last week for inspection, final fabrication finish at LBNL.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 12 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RF Cavity – Mechanical Design and Analysis Actuator Component Fabrication Center plate Lower piston Upper piston Lower support Actuator mechanical components (except bellows) for 6 actuators to be fabricated at UM, but may have to be done at LBNL due to machining limitation at UM.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 13 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RF Cavity – Mechanical Design and Analysis Actuator Bellows and Tuner Control System Sample bellows from a new vendor is at LBNL for testing; Emerson ER3000 electronic pressure controllers have been tested at LBNL Emerson ER3000 electronic pressure controllers have been tested at LBNL Pierrick Hanlet (Fermilab/IIT) visited LBNL and received the controllers for control software development. Pierrick Hanlet (Fermilab/IIT) visited LBNL and received the controllers for control software development. Old bellows New bellows

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 14 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Toshiba Ceramic RF Windows An integral part of RF power (loop) coupler; Ten Toshiba ceramic RF windows ordered by UM delivered to us (four at LBNL for inspection now, six at UM now).

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 15 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Beryllium Windows Curved Beryllium windows: 0.38 mm in thickness and 21 cm in radius Eleven Beryllium windows have been fabricated; Nine are Ti-N coated and accepted; Six of eleven windows have been evaluated/measured; Visited BW last week: two windows were rejected due to excessive distortion Two more will be re-made with proposed/improved technique.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 16 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Evaluation of the Beryllium Windows Distorted window Plot of the laser inspection machine data Accepted Rejected Constant radius scan

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 17 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 RF Power (loop) Coupler Testing/experience of the prototype cavity at MTA: sparking at the coupler MICE RF power coupler design is complete and ready for fabrication; The coupler design has an increased gap spacing; The sparking region can be Ti-N coated if necessary (will be tested at MTA using the prototype cavity); Adding diagnostics: arc detector at the coupler region.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 18 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 RF Cavity Future Work Physical and frequency measurements will be performed on the remaining 5 cavities; Electro-polish of the inside surface of each cavity remains to be done at LBNL; The cavities must be “tuned” to each other for best center frequency (10 cavities) by plastic deformation after completion of RF measurement of all 10 cavities; Final design and drawings of RF power coupler; Single cavity vessel fabrication and testing at MTA, Fermilab.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 19 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Status of SC Coupling Coil Magnet 1 st coil winding complete; cover plate and LHe pipe welding next month; Cryostat design complete, review process started: Three cryocoolers (baseline); Improved cooling circuit design; 40-mm more spacing for MLI insulation and assembly. RFCC module Cryostat Cold-mass

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 20 Derun Li - Lawrence Berkeley National Lab – May 24, st CC Coil Winding Coil winding at Qi Huan: last layer of SC wire (left) and finished Al banding (right) 1 st coil winding complete in Dec SC wire loop for connecting to QP diodes. SC wire leads from cold-mass.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 21 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Status of the CC Cryostat Design Design complete by SINAP and sent to LBNL at end of March 2011; Procurement of Solid-Edge software at LBNL: Translation and updating of the 3D model received from SINAP complete; Implementation of updated design/changes starts soon D drawings sent out to RAL, Fermilab and RAL for reviewing; Further design improvement is implemented at LBNL this month by Drs. Li Wang (SINAP) and Tapio Niinikoski: Review fabrication and assembly procedures; Improved cooling circuit design for easier assembly and MLI wrapping; Identified and finalized diagnostic sensors (location and types); Improved designs of HTS leads and SC leads for better thermal and mechanical stabilizations; Quench protection to be re-evaluated at LBNL or by others; Cold-mass and cryostat testing plan is being explored.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 22 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 The Cooling Circuit Design Simplified design of the cooling circuit for easy assembly: Simplified design of the cooling circuit for easy assembly: Moving clamps and joints underneath the copper plate + flexible pipe; Moving clamps and joints underneath the copper plate + flexible pipe; Addition of a copper sheet for easier MLI wrapping ; Addition of a copper sheet for easier MLI wrapping ; Better thermal and mechanical stabilizations of HTS leads. Better thermal and mechanical stabilizations of HTS leads.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 23 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 The Cryostat Design Kenol connector of LHe fill-line inside cooling pipe for easy assembly; Kenol connector of LHe fill-line inside cooling pipe for easy assembly; The LHe fill-line goes to the bottom reservoir. The LHe fill-line goes to the bottom reservoir. New upper and bottom reservoir designs; Welding procedures allow for cold-mass test without the need of the certification of pressure vessel; A diffuser in bottom reservoir to prevent vapor A diffuser in bottom reservoir to prevent vapor trapping. trapping.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 24 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 CC Magnet Future Work Final machining of cold-mass cover plate and pipe bending at Qi Huan to be completed by end of May and shipping to HIT early June 2011; Welding fixture complete this week at HIT, welding of cold-mass cover plate and LHe pipes at HIT starts mid-June 2011; Finished cold-mass to be shipped to LBNL at end of August 2011; Vacuum impregnation of epoxy at LBNL. Cold-mass testing plan is being explored: Cold-mass testing in the US, potential places: Fermilab or MIT; Identified a cryostat at FSU. Cryostat fabrication and assembly review summer (August) of 2011; Fabrication of the cryostat parts starts after the review. Quench protection re-evaluation starts at LBNL soon, and possible assistance from MIT group; The ¼ testing coil testing preparation is underway and will be tested at HIT this year (assembly contract awarded to a local company);

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 25 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Plan and Schedule RFCC module schedule is mainly determined by the schedule of CC magnets; RF cavity work is in good shape and currently on-hold to save resources for SS (highest priority) and CC magnets; Cold-mass testing of the first coil is critical, ¼ testing coil at HIT; Cold-mass testing in the US, potentially at Fermilab or MIT, best estimate will be September to October nd and 3 rd coil winding starts after successful testing of the 1 st coil; Each coil winding takes 3-4 month at Qi Huan. Fabrication of cryostat parts starts summer 2011 (after review); CC magnet testing with the real cryostat if the 1 st coil testing is successful Fabrication (in China) and assembly (US); Final QP system, design and assembly; Transfer techniques, namely cryostat welding, assembly and testing to Qi Huan Company for fabrication of the 2 nd and 3 rd magnets in China.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 26 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 CC Magnet Schedule (Best Estimate) First CC magnet (MUCOOL): Complete fabrication of the 1 st Cold-mass in China: August 2011; Cold-mass testing in the US: starts Sept-October 2011; Cryostat and institute (?) A meeting in early June at Fermilab to discuss the cold-mass testing by MAP PMG Fabrication of cryostat parts: Sept-Nov. 2011; CC magnet QP study starts July 2011; Cryostat assembly and magnet testing: Jan-March 2012; 2 nd and 3 rd CC magnets (MICE): 2 nd Cold-mass fabrication (coil winding and assembly): Dec – March 2012; 3 rd cold-mass: March 2012 – June 2012; Cryostat fabrication and assembly (#2 and #3): March 2012 – Sept. 2012; Magnet testing (?): where and when?

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 27 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Concerns and Risks Cold-mass testing and cryostat assembly: Resources: funding and qualified personnel: Hard to schedule without finding the right cryostat and where the testing can be conducted (qualified groups); Quench protection scheme (LBNL, Fermilab and MIT); Cryostat fabrication (China), assembly and magnet testing (which US group?). 2 nd and 3 rd CC magnets rely on experience and techniques developed from the 1 st magnet: Must succeed in the 1 st magnet; Transfer of technology (assembly and testing) to Qi Huan Company; Supervision of 2 nd and 3 rd magnet fabrication and assembly by qualified personnel.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 28 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Summary RF cavities, post processing and associated accessory components are under control at LBNL RF work schedule dictated by the cc magnets and available funding The CC magnet design has been improved significantly in the past year, we are more confident the design Experience and lessons learned from SS magnets; Help from cryogenics and magnet experts, and from MICE and MAP collaboration; Progress on cryostat design and fabrication of the 1 st cold-mass; Schedule developed based on what we know so far. The 1 st cold-mass testing plan is being developed; Realistic schedule of RFCC fabrication will/can be developed after testing of the 1 st CC magnet.