(PCU, ARIAS Society). ACTIVITYSTATUS Expedite water testing B.Barooah college also entrusted in addition to G.U GW Level monitoring Bids for Civil Works.

Slides:



Advertisements
Similar presentations
European Commission 1 An EU Framework for National Roma Integration Strategies by 2020 An EU Framework for National Roma Integration Strategies by 2020.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
PCU OFFICE HOD OFFICE PROCESS FOR RELEASE OF FUND DDO OFFICE.
ASSAM AGRICULTURAL COMPETITIVENESS PROJECT- Additional Financing
Presentation from Assam Dr.Partha Ganguli Dibrugarh, Assam.
Steps taken to improve the progress and completion rate  Filling up all vacancies of (TC) Block Engineer & Sr. TC (District Engineer)  Funds released.
Status of Universal Health Coverage Assam (Dated 9 th January 2014) National Rural Health Mission Department of Health & Family Welfare Govt. of Assam.
NE Performance Review Committee (PRC) meeting 23 rd June 2012 (MGNREGA Division)
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATION 19 OCTOBER 2010.
Imperial River: Water Quality Status and Basin Management Action Plan.
Operationalizing IE: Case Study example: Textbooks and Teacher Training in Sierra Leone APEIE Workshop, May
Indira Awaas Yojana Performance Review Committee 7 th June, 2013.
Strategy for Technology Extension State : Assam. 24 th September, 2012.
Mid Day Meal Scheme MDM-PAB Meeting-Assam 5 th March, 2015 Ministry of HRD, Govt. of India.
TRANSFORMING PROCESS on ENVIRONMENTAL ASSESSMENT OF SCHOOL BUILDINGS IN ASSAM & PROGRESS/STATUS OF ASSESSMENT AXOM SARBA SIKSHA ABHIJAN MISSION KAHILIPARA,
First Meeting of Inter-Ministerial Group (IMG) for ‘Arsenic Mitigation’ (on 22 nd January, 2015)
A Presentation for Krishi Karman Award, Government of Assam Date : 14 th October, 2014.
Presentation on Preparation of Bank Reconciliation Statement by Chief Consultant, TSG and Finance Controller, SSA Assam.
NATIONAL CONFERENCE on AGRICULTURE FOR KHARIF CAMPAIGN : th & 21 st March, 2009 Assam’s Perspectives… Prospectus & introspection.
Implementation of FM Action Plan and Monthly Expenditure Plan Group-I M.P,Jharkand,U.P.,Gujarat, Chattisgarh,Nagaland,Chandigarh, Daman&Diu Shri Ved Praksh.
ANNUAL WORK PLAN & BUDGET, MID-DAY MEAL SCHEME 1.
National Consultation on Community Action for Health (CAH) 28 th – 29 th October 2014.
Brief Profile of Oilseeds in Assam
AACP: Status:24AUG20101 WORLD BANK FINANCED Assam Agricultural Competitiveness Project ( AACP ) Status Over View.
PORTFOLIO COMMITTEE AND NCOP PRESENTATION DEPARTMENT OF SOCIAL DEVELOPMENT 24/8/05.
Department of Rural Development Government of India Rural Housing 16 th January 2013 (Group –I)
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
ABHIVRUDHI SOCIETY FOR SOCIAL DEVELOPMENT ( LEAD NGO)
Mouchaq Scholarship Test 2014
Indira Awaas Yojana Performance Review Group 2 31 st Jan
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
1 MID DAY MEAL SCHEME MEGHALAYA. State Profile NUMBER OF SCHOOLS 2 Source: O/O Sub-Divisional School Education Officer As on S.NODistricts.
1 Civil Society and Public Participation in the GEF Bonizella Biagini NGO Coordinator Global Environment Facility.
Assam Agriculture Marching Ahead A Presentation for Krishi Karman Award Government of Assam.
PRESENTATION ON I.W.M.P. FOR ASSAM - YEAR Presented by – Dr. Prem Saran Commissioner & Secretay Soil Conservation Dept. & Chairman, SLNA, IWMP,
Board Report - Performance September 2008 Produced by Business Intelligence (Performance)
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
PRESENTATION ON AWP & B MID-DAY MEAL SCHEME Govt. of Assam Education (Elementary) Department Kahilipara, Guwahati-19
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. Status.
ICDS System Strengthening & Nutrition Improvement Project (ISSNIP) Presentation by: State Project Management Unit Department Women & Child Development/Social.
Equitable access to water, Paris Access to Drinking Water in MDA Ion Shalaru, Head of Environmental Health Department, National Scientific.
Evaluating the Indonesia Early Childhood Education and Development Project.
IASC SWG on Preparedness Five Country Initiative Progress 29/06/2009.
Review of BGREI State : Assam Date : 31st October, 2014.
Performance Management Reporting: Quarter 4 Guide to Q4’s reporting Overall performance for Q4 Key Service Priorities Other performance indicators Next.
WATER RESOURCES MANAGEMENT IN SABAH
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
Mid Day Meal Scheme MDM-PAB Meeting –Assam on Ministry of HRD Government of India.
Review of BGREI Assam Date : 27th October, 2015.
Poliovirus Surveillance status of quality, actions to improve sensitivity WHO-India 15 March 2012.
IITB Arsenic Filter for Arsenic, Iron and Phosphate removal from groundwater Prof. Sanjeev Chaudhari Centre for Environmental Science and Engineering Indian.
REVIEW MEETING CUM TRAINING Organized by- State Project Management Unit, RGPSA Office of the Commissioner Panchayat & Rural Development Assam 1.
European Commission 1 An EU Framework for National Roma Integration Strategies by 2020 An EU Framework for National Roma Integration Strategies by 2020.
Ministry of Finance National Strategic Reference Framework Communication Strategy 20 June 2008 Second NSRF Monitoring Committee Zornitsa Arsenieva Advisor.
Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Organized by: Energy Research Centre (ERC), South Africa and.
MUNICIPAL INFRASTRUCTURE GRANT EXPENDITURE STATUS: SECOND & THIRD QUARTER 2015/16 FY (MUNICIPAL) Municipal Infrastructure Cape Town |Marius Brand|
National Health Mission Assam. Community Action for Health Assam.
EDM Strategy for Working with Countries: the Uganda Example
Assam – at a glance Area (in sq.kms.) sq. K.M.
MONITORING & EVALUATION OFFICER NERCORMP, SHILLONG, INDIA
Development of an early warning system for the outbreak of Japanese encephalitis with the help of Remote Sensing and GIS in conjunction with the epidemiological.
National Health Mission Assam
Training for All : Intensive Training Programme
Presentation on project progress
Comprehensive Primary Health Care in Assam
Mid Day Meal Scheme MDM-PAB Meeting – Assam On
Mid Day Meal Scheme MDM-PAB Meeting – ASSAM On
Mid-term review: “CONTINUING REGIONAL SUPPORT FOR THE PERSISTENT ORGANIC POLLUTANTS (POPs) GLOBAL MONITORING PLAN (GMP2)” under the Stockholm Convention.
Presentation transcript:

(PCU, ARIAS Society)

ACTIVITYSTATUS Expedite water testing B.Barooah college also entrusted in addition to G.U GW Level monitoring Bids for Civil Works for GW Monitoring Stations being floated withinDec.12 NERIWALM Study by on safe-yield of GW Completed (for priority districts) GPS/GIS based mapping of installed STWs Under process. District NGOs assigned the task of providing GPS Coordinates

ACTIVITYSTATUS Engagement of Environmental Consultant-2 Ms G.V Sharma appointed as EC-2 Road side plantations (PWD Rural Roads) Proposals Received Sanctioned accorded Study report on sensitive zone for As/F/Fe/HC Completed & submitted by Guwahati University Increase capacity & manpower of GU Manpower increased to 12 nos. Also 3 Atomic Absorption Spectrometer installed.

Total STW installed as on 05/12/12 Total Sample collected Total sample dispatched to GU for testing Total sample dispatched to B.B.C for testing Report Submitted by GU Report submitted by BB. Total Report Submitted till date Samples yet to be collected for testing 59,69252, * * Excluding Karbi Anglong + Hailakandi (596+08)

ParticularsJune 2012December 2012% increase of progress STWS Installed58,46259, % Total samples collected35,85252, % Total samples tested30,68439, % Sample can not be collected during July to September due to Floods

District STW installed as on 08 Dec Sample Status (Nos) Total sample received by PCU (nos.) till 08/12/12 Water Sample yet to be collected (nos.) Water sample Collected by Deptt. Water Sample Collected by DNGO upto 31/11/11 Water sample Collected by DNGO upto 15/3/12 Water Sample Collected by DNGO after 15/3/12 Baksa Barpeta Bongaigaon Chirang Darrang Dhemaji Dhubri Dibrugarh Goalpara Golaghat Hailakandi Continued

District STW installed as on 5/12/2012 Sample Status (Nos) Total sample received by PCU (nos.) till 08/12/12 Water Sample yet to be collected (nos.) Water sample Collected by Deptt. Water Sample Collected by DNGO upto 31/11/11 Water sample Collected by DNGO upto 15/3/12 Water Sample Collected by DNGO after 15/3/12 Jorhat Kamrup K. Anglong Kokrajhar Lakhimpur Morigaon Nagaon Nalbari Sonitpur Sivasagar Tinsukia Udalguri Total

SlDistrict Target of collection (nos) Sample collected (nos) Sample yet to collected (nos) Reasons of delay in collection of samples 1Dhubri  Riots in Aug-Sept’12 in BTAD areas.  Flood wave in July & Sept’12 delayed in sample collection.  Only One NGO is entrusted for Dhubri, Chirang & Bongaigaon districts.  Classes still persist in District Dhubri. 2Dibrug arh  Flood wave in July & Sept’12 delayed in sample collection.  Only 1 no. NGO is entrusted for Dibrugarh, Jorhat, Golaghat & Tinsukia districts.

Water samples collected from 21 districts & tested for Arsenic (As) & Fluoride (F) content. Results reveals that only 10 districts have As & F levels above permissible limits, as shown below SlDistrictBlock Total sample s of District tested Maximum levels found (mg/l) Total samples of District tested Arsenic (As)Fluoride (F) Tota l Nos%TotalNos% 1Bongaigaon2 nos4914 As = F = % % 2Darrang2 nos2849 As = F = % % 3Dhemaji2nos302 As = F = % % 4Dhubri3nos2636 As = 0.0 F = % % 5Goalpara3nos4321As = F = % % Note: Permissible limit for drinking water As=0.05 mg/l, F=1.5 mg/l.

Sl no DistrictBlock Total samples of District tested Maximum levels found (mg/l) Total samples of District tested Arsenic (As)Fluoride (F) TotalNos%TotalNos% 6Kamrup1no3247 As = 0.0 F = % % 7Lakhimpur1 no792 As = 0.0 F = %4912.5% 8Nagaon5 nos6635 As = F = % % 9Nalbari1 no1910 As = F = %9600% 10Sonitpur1 no1758As = F = % Note: Permissible limit for drinking water As=0.05 mg/l, F=1.5 mg/l.

Conclusion  Overall progress of 87.94% achieved in 21 districts.  Significant Progress in spite of followings un-expected constraints: ◦ Cumulative testing capacity of Gauhati University & B. Barooah College (BBC) is 3,000 (in reality) samples per month only ◦ Flood wave in July & Sept’12 delayed sample collection significantly due to total submerging of farm-fields/STWs ◦ Riots in Aug- Sept’12 in various parts of Assam affected collection of water samples ◦ Due to non-inclusion of some earlier districts of AACP under AF, NGOs of nearby districts of AF, entrusted to collect water samples  Constraints significantly affected water sample collection rate- Yet all out effort is on to complete targets  Despite Constraints- 88% water samples collected and of which 75% tested- rest will get completed very soon

THANK YOU CLICK