UNITED NATIONS STAND-BY ARRANGEMENTS SYSTEM (UNSAS)

Slides:



Advertisements
Similar presentations
Tips and Resources IASC Cluster/Sector Leadership Training
Advertisements

Overview of the Basel Convention and Basel Protocol: History and Goals Ms. Donata Rugarabamu Senior Legal Officer Secretariat of the Basel Convention Regional.
Overview of the Basel Convention and Basel Protocol: History and Goals Laura Thompson Legal Expert Secretariat of the Basel Convention Regional Workshop.
1 SAICM & the QSP Established by the International Conference on Chemicals Management (ICCM), which adopted the Strategic Approach to International Chemicals.
NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
Local Government Pension Scheme November 2013 Auto-enrolment & the Local Government Pension Scheme Presented by Andy Cunningham.
PEACE-KEEPING BUDGETS CURRENT PROCESS OF ESTABLISHING AND EXTENDING PEACE- KEEPING OPERATIONS A: New missions: 1.A Survey mission is sent to the area of.
SGTM 15: Logistics in Peacekeeping
UNSW Strategic Educational Development Grants
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
SGTM 14: Uniformed Personnel in Peacekeeping Slide 1 SGTM 14: Uniformed Personnel in Peacekeeping.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
NORDRESS Consortium Agreement highlights. All participating institutions have signed the CA This presentation gives a brief overview of the main items.
Financial Affairs Communication Plan. Meeting Attendance & FAR Member Guidelines   FAR members are responsible for disseminating information to the.
21. Rapid Reaction. Learning Objectives: – Understand the rationale for rapid reaction – Familiar with the challenges facing rapid reaction – Familiar.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Provider Human Rights Coordinator Role Accessing HCSIS to Support Human Rights Committee Reviews September 11, 2013.
U.S. Small Business Administration
Dr. Diganta Biswas School of Law Christ University, Bangalore.
Unit Introduction and Overview
Integrated Mission Planning Process (IMPP)
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
Unit 2 – Part 2 How United Nations Peacekeeping Operations Function.
Purpose of the Business Plan (as indicated in Paragraph 1) to provide a more coordinated and structured response to the issue of reproductive health commodities/supplies.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Overview of the Rotterdam Convention. Sub-regional Consultation for DNAs 2 Overview of the Rotterdam Convention Structure of the presentation Part 1 -Introduction.
BSBADM307A Diary and Appointment Keeping Prepared by Melanie Lynch Training Consultant.
Strategic Force Generation and Capability Planning
1 What’s Next for Financial Management Line of Business (FMLoB)? AGA/GWSCPA 6 th Annual Conference Dianne Copeland, Director, FSIO May 8, 2007.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Direct Support to Focal Points under CSP  The GEF Country Support Program (CSP) is a capacity building project encompassing an overall comprehensive and.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
LISTINGS BY TALIBAN AND AL-QAIDA SANCTIONS COMMITTEE Briefing to the Select Committee on Security and Justice 12 Augustus
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
RANET EPPR 2007 Ann Heinrich. 2 BackgroundBackground Secretariat issued in 2000 a global Response Assistance Network (RANET)* document Aim: To provide.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Physical Inventory Why? 1 Barbara A. Finnegan, CPPM CF.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Biosafety Clearing House Training Workshop date place.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
BRIEFING TO PORTFOLIO COMMITTEE FOR SAFETY AND SECURITY 27 August 2008 Referred Instruments Memorandum of Understanding between the Government of the Republic.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Briefing to the Portfolio Committee on Police 21 August
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
HORIZON 2020 Amendments to the Grant Agreement. Consequences The amended provisions become an integral part of the GA All other provisions remain unchanged.
Transition Collaborators. Team Models Multidisciplinary Interdisciplinary Transdisciplinary.
Center of Excellence PEACE OPERATIONS COMMAND & CONTROL AND COMMAND & CONTROL AND TRANSITION ISSUES Lt Col (R) John Derick Osman Center of Excellence in.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Secretariat of the Stockholm Convention Getting ready for COP-4.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
EC-UNDP Workshop on Formulating and Implementing Electoral Assistance Projects in the Context of the EC-UNDP Partnership Reporting Pierre Harzé, Deputy.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
process and procedures for assessments
11–12 April 2005 Wissenschaftszentrum, Bonn, Germany
4.2 Contract preparation and signature
Contractual obligations
Agenda 5.11 General Regulations
GMAS Preproposal Entry
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Exit Capacity Substitution and Revision
Overview US Paper C2-7.INF
United Nations Voluntary Fund on Disability (UNVFD)
Committees dealing with Taliban and Al-Qaida
Review of the 1958 Agreement
Interoperable Communications Technical Assistance Program
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

UNITED NATIONS STAND-BY ARRANGEMENTS SYSTEM (UNSAS)

 Background  Concept  Purpose  Resources  Reports  Levels  MOU Template  Summary  Discussions Scope

To provide a brief overview of the United Nations Standby Arrangement System (UNSAS). Aim

 In 1992, in the “Agenda for Peace”, the Secretary-General stated a requirement for troops to be available to the UN at short notice, capable of intervening quickly and efficiently where and when necessary.  In 1993, following the Brahimi Report, the General Assembly ordered the establishment of United Nations Standby Arrangement System (UNSAS).  In 2000 the database for UNSAS was made functional. This data base was on a stand-alone computer.  The UNSAS Data base is now being upgraded (since Sep 2010) into a web based system allowing the TCC to interactively upload their pledges/contributions. Background

 The United Nations Stand-by Arrangements (UNSAS) is based on conditional pledges by Member States (MS) to contribute specific resources within agreed response time and restrictions in UN PKO.  However, the final decision to actually deploy the resources or not still remains a national decision. Concept

 Provides a precise understanding of the forces and capabilities a MS will have available, at a given state of readiness, for deployment from the home country, should it agree to contribute to a Peace Keeping Operations.  Facilitates DPKO’s efforts in mission planning and the actual force generation process and also contributes to the rapid deployment of resources.  Allows the MS to plan, budget, train and prepare its personnel for a possible contribution to a UN PKO and, if necessary, to arrange for the acquisition of the necessary equipment required for UN PKOs.  It provides the UN with a list of potential options/alternatives which enables the UN planners to develop contingency and fall-back strategies in case of anticipated delays Purpose

 UNSAS consists of arrangements negotiated between the UN and individual MS. The resources agreed upon remain on “stand-by” in the Home Country.  Pledges can be general or for specific appointments as preferred by the MS. The pledged resources are of three main categories: Operational units (AD, Armd, Arty, HQ, Inf, Marines, Naval Recce Units and Special Forces). Operational units (AD, Armd, Arty, HQ, Inf, Marines, Naval Recce Units and Special Forces). Support units (Air Svc, Comms, Engrs, Catering Svcs, Health Svcs, Logistics, Maint Movt Control, Navy Aux, Police, Supply and Transportation units). Support units (Air Svc, Comms, Engrs, Catering Svcs, Health Svcs, Logistics, Maint Movt Control, Navy Aux, Police, Supply and Transportation units). Individuals (Milobs, Milads, Arms Monitor, LO). Individuals (Milobs, Milads, Arms Monitor, LO).  MS retain responsibility of stand-by resources and the UN does not pay till they are deployed. Resources

 Information pledges to UNSAS is used by military planners to propose the most appropriate capability to meet the operational requirement of the UN and to plan deployment. To do this effectively, information must be up to date.  A system of quarterly updates (Jan, April, Jul and Oct) by MS is used to ensure that the information held in the UNSAS database is up to date. MS are normally alerted to submit their (fax/mail) updates early enough.  Pledges which are not possible due to national commitments, caveats or any other reason are not required to be included in the quarterly updates.  If MS does not update pledges, they are considered to be the same as they were in the last updated quarter.  UNSAS DATA IS AS RELIABLE AS PLEDGES/UPDATES PROVIDED MS. Reports

 The key element in the system of the standby arrangements is the bilateral exchange of detailed information to facilitate planning and preparation for both participating Member State and United Nations.  The UNSAS scale corresponds to information provided about pledges in regards to capabilities, organisation, movement data, self-sufficiency and major equipment.  There are three conventional levels (1, 2 and 3) of commitment by MS to UNSAS and a Level of Rapid Deployment. UNSAS Levels of Commitment

 Level 1: Provides a list of capabilities (size, strength, and response time) of the pledges made available to the UN.  Level 2: Provides detailed inventory lists of the pledges including the organization of the units, a list of major equipment, level of self-sufficiency, and data on individuals.  Level 3: Provides for a signed MOU giving details of capabilities & resources pledged. UNSAS Levels of Commitment

 Resources pledged by MS in this level can be deployed to a UN Mission within 30/90 days of a SC Mandate, following the appropriate government approval.  The Level enables both the Secretariat and the MS to save time through detailed pre-deployment planning and preparation of a draft MOU. NB: RDL units are those units for which a “draft MOU” has been negotiated and “cargo load lists” have been submitted by the TCC. Rapid Deployment Level

I. PURPOSE THE PURPOSE OF THE MOU IS TO IDENTIFY THE RESOURCES WHICH THE MEMBER STATE HAS INDICATED THAT IT WILL PROVIDE TO THE UN FOR USE IN PKO UNDER THE SPECIFIED CONDITIONS. II. DESCRIPTION OF RESOURCES THE DETAILED DESCRIPTION OF THE RESOURCES TO BE PROVIDED BY THE MEMBER STATE IS SET OUT IN THE ANNEX TO THE MOU. IN THE PREPARATION OF THE ANNEX, THE MEMBER STATE AND THE UN, HAVE FOLLOWED THE GUIDELINES FOR THE PROVISION OF RESOURCES FOR UN PKO. III. CONDITION OF PROVISION THE FINAL DECISION WHETHER TO ACTUALLY DEPLOY THE RESOURCES BY THE MEMBER STATE REMAINS A NATIONAL DECISION. IV. ENTRY INTO FORCE THE PRESENT MOU SHALL ENTER INTO FORCE ON THE DATE OF ITS SIGNATURE. V. MODIFICATION THE PRESENT MOU INCLUDING THE ANNEX, MAY BE MODIFIED AT ANY TIME BY THE PARTIES THROUGH EXCHANGE OF LETTERS. VI. TERMINATION THE MOU MAY BE TERMINATED AT ANY TIME BY EITHER PARTY, SUBJECT TO A PERIOD OF NOTIFICATION OF NOT LESS THAN 3 MONTHS TO THE OTHER PARTY. UNSAS MOU TEMPLATE

 Conventional Levels: 89 Level 1: 24 Level 1: 24 Level 2: 8 Level 2: 8 Level 3: 57 Level 3: 57  RDL: 4 Summary of UNSAS MS

STEPS IN SIGNING UNSAS MS  Step 1: UN Secretariat discusses with MS UNSAS system.  Step 2: UN Secretariat provides the MS with UNSAS MOU and other documents.  Step 3: MS coordinates with the capital in regards to the contents of the MOU.  Step 4: MS informs Secretariat of the decision and a date is set for the signing of the MOU. USG-DPKO and Minister usually signs the MOU. COORDINATION IS KEY AT THIS STAGE. 

DISCUSSION