Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs.

Slides:



Advertisements
Similar presentations
River Regulation / Dam Construction – Effects on Rivers and Streams.
Advertisements

UNW-DPC International Workshop Institutional Capacity Development in Transboundary Basins Lessons learned from practical experiences 10 – 12 November 2008.
The adequacy of the existing reserve system for the protection of freshwater ecosystems Janet Stein Fenner School of Environment and Society.
Implementation of WFD in Hungary - rivers Zoltán Simonffy Hungarian Academy of Sciences Research Group for Water Management Zoltán Simonffy Hungarian Academy.
Module 3: Environmental Objectives, Programme of Measures, Economic Analysis, Exemptions Environmental Objectives Yannick Pochon Afyon, 2015.
Wet Woodlands and the Water Framework Directive Ben Bunting, South West River Basin Programme Manager.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Hydropower – a regulatory perspective Jacques Sisson EA North Wales Area Account Manager HEP Area Environmental Planning Team.
European Agricultural Fund for Rural Development: opportunities in the Energy Sector Victoria Jane Primhak.
GIS development. Danube Commission+ISRBC meeting Sava GIS Sava GIS establishment –Performed in accordance with the Sava GIS Strategy EU WFD INSPIRE Directive.
Environmental flows in Europe Mike Acreman. Green and pleasant land? Thames basin 10,000 km mm rainfall 15 million people significant water stress.
Current state of energyproduction and useage, sources and domestic production.
HYDRO POWER SYSTEMS Hydropower is the capture of the energy of moving water for some useful purpose. Hydropower now supplies about 715, 000 MWe or 19%
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Workshop on Disproportionate Costs, 10./ Copenhagen Navigation-related issues of affordability and extended deadlines. Consideration of residual.
Hydrological Energy By:Saeed Merghani and Dalal Dumaidi.
Hydropower and the Water Environment Peter Gammeltoft European Commission DG Environment, D.1 Water 2nd Workshop on Water Management, WFD & Hydropower.
Manuel Lago, Ljubljana,Slovenia, 12/02/20131 Economic analysis of water use: future solutions for the Hydropower sector Dr Manuel Lago “Future water use.
Water Power By: Andrew Paulshock.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
IPPC Discharges Monitoring Workshop Water Framework Directive Overview (and its implications for Industry) Peter Webster Regional Chemist (EPA Cork)
Ecologic.eu 12/3/2009 – HMWB Workshop, Brussels Summary of Member State Questionnaires on HMWB Eleftheria Kampa Ecologic Institute.
Fish migration from a Water Framework Directive perspective
18-Nov-15 / 1 Strategic planning for hydropower in the Danube Sergiy Moroz WWF European Hydropower Summit, Bucharest 28 February 2012 Water and energy.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
19 June 2003, Athens, Greece INTEGRATED MANAGEMENT THE RIVER BASIN PERSPECTIVE The Jucar River Basin - First results Teodoro Estrela Júcar PRB Coordinator.
Hydropeaking and minimum flow : the French approach. P. Baran CIS ECOSTAT - HYDROMORPHOLGY WORKSHOP 12th and 13th June Brussels Pôle Ecohydraulique.
Ecologic.eu Brussels, 19 March 2009 Environmental & economic impact of water pricing and quotas in the agriculture sector What do we learn from practical.
MODULE 1 Water Framework Directive, Relation of WFD with Daughter Directives, River Basin Management Planning, Water Bodies, Typology, Classification River.
HMWB-Workshop „Heavily Modified Water Bodies: Information Exchange on Designation, Assessment of Ecological Potential, Objective Setting and Measures”
Water.europa.eu Water Framework Directive - a framework for Community action in the field of water policy Marieke van Nood WFD Team, DG ENV.D.2, European.
CURRENT CHALLENGES FACING HYDROPOWER DEVELOPMENT IN EUROPE Brussels 1-2 october 2009 Sara Gollessi APER (Association of Producers of Energy from Renewables)
Water Quality Certification for hydropower licensing in Wisconsin.
Austrian Approach for Identification of Water Bodies Workshop on Identification of Surface Water Bodies Brussels, 25/26 September 2003 Birgit Vogel Austrian.
Water Director Meeting 30th November 2006, Inari / SF WFD and Hydromorphology Technical report on “Good practice in managing the ecological impacts of.
Implementing environmental flows in Catalan rivers Cost analysis and impact on use CIS ECOSTAT HYDROMORPHOLGY WORKSHOP 12 th and 13 th June 2012 Antoni.
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
Thematic assessments based on results from RBMPs Coastal and transitional ecological status & related presures Inland surface waters Hydromorphological.
Identification and evaluation of anthropogenic pressures Northern calotte water authority meeting Levi 16 th -18 th April 2013 Pekka Räinä/ Lapland ELY-centre.
River Regulation / Dam Construction – Effects on Rivers and Streams.
Identification on Significant Pressures - Surface Water Bodies
WFD and Inland Navigation
Compiled by core group ECOSTAT workshop, Paris
Proposal for reporting on Programmes of Measures in 2016
on Identification and Designation of Heavily Modified and
GEP vs. GES.
A. Pistocchi, A. Aloe, S. Bizzi, F. Bouraoui, P. Burek, A. de Roo, B
WFD and Hydromorphology - 4/5 June 2007, Berlin, Germany -
River Kokemäenjoki – Flood risk management & WFD
River Kokemäenjoki – Flood risk management & WFD
Design of monitoring networks for rivers in Austria
DG Environment, Nature Protection Unit (D3)
Future EU rural development policy and the Water Framework Directive
Hydropower and the WFD: constraint or opportunity?
CASE STUDY: A SPECIFIC CASE OF NON-ACHIEVEMENT OF THE OBJECTIVE
WFD and Hydromorphology
Progress and activities of Oulujoki PRB (Finland) PRB Workshop 2006 Stresa, Italy Teemu Ulvi Seppo Hellsten Finnish Environment Institute.
Objective setting in practice
on Identification and Designation of Heavily Modified and
ENERGY AND WATER Experiences with recommendations (1).
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
Preparation of the second RBMP in Romania
ALPINE CONVENTION - Platform „Water Management in the Alps“
Hydropower in Europe Strategic coordination group
Anja Skiple Ibrekk & Tor Simon Pedersen
Workshop WFD and Hydromorphology Brussels, June 2012
”Identification of water bodies as potentially heavily modified”
Summary overview of methods used to define GEP in practice by countries represented in the ad-hoc group Dr. Ursula Schmedtje.
Seppo Hellsten & Teemu Ulvi
ALPINE CONVENTION - Platform „Water Management in the Alps“
Presentation transcript:

Seite Hier steht ein thematisches Foto European Workshop on HMWBs, March 2009, Brussels Final designation of HWMBs in Austria for WBs impacted by Hydropower Veronika Koller-Kreimel / Ministry for Agriculture, Forestry, Environment and Water Management

Seite 2 Brussels, March 2009 HMWB-designation in Austria - Hydropower Hydropower in Austria 3 types causing different pressures and impacts run-of-river plant ….. Impoundments (change of type) diversion plant……… residual flow storage plant ……….. reservoir (peak load production/ … flow fluctuations ancillary services) … residual flow …. continuity interruption

Seite 3 Brussels, March 2009 HMWB-designation in Austria - Hydropower Steps for final designation of HMWBs in Austria Criteria for „substantially changed in character“ List of restoration/mitigation measures for each pressure type (Driver Hydropower) List of possible adverse effects on uses/wider environment Criteria for „significance“ of adverse effects Criteria for better environmental options

Seite 4 Brussels, March 2009 HMWB-designation in Austria - Hydropower Criteria for substantial change in character* * HMWB Guidance: profound, permanent, irreversible 2- steps: 1) Screening by applying criteria, which are - pressure related and / or –impact related leading to a „provisional identification of HMWB“ 2) final decision – additional biological impact criteria has to be fulfilled

Seite 5 Brussels, March 2009 HMWB-designation in Austria - Hydropower Impact related criteria specific threshold Length of river expected to be worse than good - small rivers: >1 km due to hydromorphological alterations - large rivers: > 2 km Intensitiy of river fragmentation - highland: > 2 (number of migration barriers) - lowland: > 1

Seite 6 Brussels, March 2009 HMWB-designation in Austria - Hydropower Substantial change in character - Screening by pressure related criteria (1) specific thresholds Length of dammed section (impoundment) - small rivers: > 1km (change of type) - large rivers: > 2 km morphology changed into reservoir - change of river category to lake any - enlargement of lake any Height of weirs: (migration barrier) - highland: >70 cm - lowland: > 30 cm change of hydrological regime - downsurge: surge > 1: 5 (small, medium) due to water discharge from storage pp - any surge (large rivers) (Intensity of water flow fluctuations) Reduction of flow as being part of a - residual water flow < MJNQt or storage plant system: - no ecological minimum flow guaranteed

Seite 7 Brussels, March 2009 HMWB-designation in Austria - Hydropower Substantial change in character – pressure related criteria (2) Reduction of flow due to diversion plants = significant pressure causing singnifiant hydrological and morphological impacts, but no substantial change in character: »not irreversible »not permanent (will be changed when licence expires) Basic requirement is not fulfilled – no designation as HMWB possible! Restoration of ecological minimum flow might mean a significant adverse effect on use (electricity production ) - but that would be a reason for applying an exemption acc. to Art. 4 (4) or 4(5) WFD

Seite 8 Brussels, March 2009 HMWB-designation in Austria - Hydropower Substantial changed in character 2 nd step - final decision Proven biological impact:  „good ecological status“ is really failed (with high confidence) due to hydromorphological alterations  In case that the „good ecological status“ is already achieved in the water body, the application of Art. 4 (3) test would make no sense! „Changes to hydromorphological characteristics which would be necessary for achieving good ecological status would have a significant adverse effect ….“

Seite 9 Brussels, March 2009 HMWB-designation in Austria - Hydropower Measures to restore GES in wb impacted by hydropower might have an significant adverse effect on use  Storage for power generation: Significant* losses of electricity production base load (*more than natural variation due to natural flow variations) Decrease of peak load production and ancillary services Decrease in security of electricity supply on regional or national level  Flood Protection: decrease of protection level (HQ 100) for settlements endangering infrastructure (railways, highways)  … Investment costs (e.g. for habitat improvement/creaation) were considered to have no significant adverse effect on hydropower use !

Seite 10 Brussels, March 2009 HMWB-designation in Austria - Hydropower No significant adverse effect on hydropower use  fish passes for upstream migration Production losses are always much smaller than natural variation at the site Fish pass for upstream migration is state of art/BEP.  Measure to improve the morphological situation/habitat creation  balance reservoirs There might be significant costs -> question of exemption Art (or Art. 4.5.) WFD

Seite 11 Brussels, March 2009 HMWB-designation in Austria - Hydropower Better environmental option for hydropower generation Can hydropower production be shifted to another site? NO – as any new hydropower plant of comparable size would cause a deterioriation of ecological status in any case Can electricty production (base load) be replaced by other renewables or saving? (oil, gas, coal could never be a a better environmental option! ) national scale: 40% of Austrian electricity production is generated in run-of-river plants – no chance for replacement/saving – in particular under the pressure to increase the share of renewables up to 2020 (Renewables Directive) Can peak load production/ancillary services be replaced by another energy source Theoretically only by „non-Renewables (gas), but that is not „environmental friendly“ – therefore answer is NO

Seite 12 Brussels, March 2009 HMWB-designation in Austria - Hydropower Conclusion In case that to achieve GES hydromorphological measures are needed which would mean a decrease in electricity production (base or peak load/ ancillary services ) no better environmental option does exist

Seite 13 Brussels, March 2009 HMWB-designation in Austria - Hydropower Result (wb failing good status with high confidence) all impoundments (small rivers > 1 km, large rivers > 2 km) all river water bodies which belong to the complex system of a storage power plant (hydropeaking) all lakes which were changed into storage reservoirs were designated as HMWB as all requirements of Art. 4 (3) were fulfilled 300 river water bodies, 6 lakes

Seite 14 Brussels, March 2009 HMWB-designation in Austria - Hydropower Thank you for your attention

Seite 15 Brussels, March 2009 HMWB-designation in Austria - Hydropower Provisional identification HMWB Rivers > 10 km 2 Length or river network : km Lakes > 50 ha (1036 km 2 ) designated HMWB 1% 10% designated HMWB already