1 The Replanting of Lochaber Hydro Power Station by Andrew Thick
2 Topics to be covered today Scheme modelling; Operating capability of Lochaber; Turbine selection; Penstock works.
3 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
4 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
5 Spey Dam
6 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
7 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
8 Laggan Dam
9 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
10 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
11 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
12 Loch Treig and Dam
13 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
14 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
15 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel
16 Penstocks, Powerhouse and Smelter
17 Simplified Lochaber Scheme Model Q Tspill Q P/H Q Tin Laggan Q Tin Q Tunnel Treig Q Lspill Q Lin Q intakes Gravity Intake Flows are combined with Reservoir Inflows
18 Energy Modelling Results Trial Installed Cap. (MW) Overall Efficiency (%)7587 Headloss Coeff. (k) Operating ruleExt Max E Laggan Spill (mcm)2,0341,7944,1601,7091,2271, Treig Spill (mcm) Ave. Energy (GWh/yr)
19 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows
20 Operating Capability in terms of Loch Treig Level Note: 90.7% of water from Loch Treig 9.3% of water from gravity intakes
21 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows
22 Operating Capability in terms of Surge Shaft Water Level Penstock Limitation Note: 90.7% of water from Loch Treig 9.3% of water from gravity intakes
23 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows
24 Note: All water from Loch Treig Operating Capability in terms of Surge Shaft Water Level
25 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows
26 Operating Capability in terms of Surge Shaft Water Level Note: All water from gravity intakes
27 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows
28 Example Operation exceeding Penstock Pressure Rise Limit
29 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model
30 Scheme Operation Frequency Plot
31 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model
32
33 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model
34
35 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model
36
37 Penstock works Key aspects of the penstock works were: Need to undertake the works minimising shutdown of generation. Existing penstock system was very complex. In order to maintain double isolation, the penstocks needed to be dewatered sequentially. The works were complex with poor access. Decision with RTA to laser scan the penstock system and create a 3-D model.
38 Multiple buspipes Numerous Valves Bifurcations
39 Penstock Area – difficult terrain!
40 Penstock works Key aspects of the penstock works were: Need to undertake the works minimising shutdown of generation. Existing penstock system was very complex. In order to maintain double isolation for the penstocks needed to be dewatered sequentially. The works were complex with poor access. Decision with RTA to laser scan the penstock system and create a 3-D model.
41 Survey Point Cloud Data
42 AutoCAD 3-D Model
43 Project Summary The generating plant has been replaced to give 25+ years life extension. The water to wire efficiency has been improved from 75% to 90+%. Energy production increased from 460 GWh/yr to 600+ GWh/yr. The scheme’s capability is better understood and limitations identified. The scheme was completed ahead of schedule and is operating successfully with minimal disruption to Smelter operations during construction
44
Contact Details Andrew Thick BEng CEng MIMechE URS Infrastructure and Environment UK Limited International House, Dover Place Ashford Kent TN23 1HU United Kingdom Tel:+44 (0) Thank you for your kind attention