1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

Slides:



Advertisements
Similar presentations
D. Y. Patil Collage of Engg & Tech.
Advertisements

HYDROELECTRIC PROJECT
1 Topic I.7. Pipelines: Kinds, Structures, Construction and Testing Definition: Pipes, transmitting water from the intakes to the service (distributing)
A Close Look at Hydroelectric Dams, Generators and Coal Power Plants.
Hydro power systems. Loch Sloy dam: 290 m head, 130 MW rated output.
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
1 Southeast Alaska Power Agency SEAPA’s Mission: To provide the lowest wholesale power rate consistent with sound utility planning and business practices.
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
EE535: Renewable Energy: Systems, Technology & Economics
MICRO HYDROELECTRIC POWER PLANT WITH CHAIN TURBINE
POWER PLANT.
Hydro Optimization Tom Halliburton. Variety Stochastic Deterministic Linear, Non-linear, dynamic programming Every system is different Wide variety.
Hydro Electricity Generation What is Hydroelectricity?  the production of electrical power through the use of the gravitational force of falling.
Hydro Power Plant Prepared by: Nimesh Gajjar
The Importance of Hydropower and the Dam of Włoczławek
HYDRO ELECTRIC POWER PLANT
Hydroelectric Power Kathryn Boit. Step 1: How Does it Work? Water rushes through rivers at incredible speed. So how do we use a resource that is all around.
46 mini/micro hydro plants KP Pakistan
HydroExpert Decision Support System Quick Guide to HydroSim XP Simulation Model Version 1.4 – Revision: 13/07/2012 HydroByte Software.
What is Hydroelectricity? In order to produce electricity, most machines require some form of mechanical energy. Hydroelectricity is one form of mechanical.
Lecture 5 Hydropower Sept 9, 2008 CVEN 4838/5838.
Water Energy. Hydro Energy - the energy generated by water.
Hydro electric (Hydel) Power Plant
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
Hydropower: Electricity From Moving Water By: Lauren Murphy and Candice Burgan oover_dam.gif.
Convection currents (wind and ocean waves), W Evaporation of water, heating of water & ice W Photosynthesis on land and sea, 98.
Hydroelectricity. little bit of information about hydroelectricity, well first is does involve water it can either be falling or the flow of the water.
Power from the waves. Global ocean wave energy resource (annual averages in kW/m width of wave)
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Turbines RAKESH V. ADAKANE DEPARTMENT OF MECHANICAL ENGINEERING
Critical parameters of hydraulic transient regimes in hydropower plants with complex water conveyance systems Jernej Mazij, Anton Bergant, Uroš Karadžić.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
Hydroelectric Power Plant -Turbine wheel consist of at least one moving part called rotor ( a shaft with blades attached ). -Moving fluid change pressure.
By: Michael Brannon and Anthony Nguyen. Outline:  Advantages/Disadvantages  How it works  Where to find Hydro power  Production time  Energy Provided.
HYDROELECTRIC POWER PLANT. PRELIMINARY INVESTIGATION  The purposes of preliminary investigations are to provide sufficient information to find out the.
Middle Fork Project Project Description April 25, 2006.
HYDRO POWER PLANT
Do Now: What are the 4 steps of the Water Cycle? What is the difference between transcription and evaporation?
1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.
Hanoi, January 27 th 2015 Enrico Weber DEIB – Politecnico di Milano IMRR Project INTEGRATED AND SUSTAINABLE WATER MANAGEMENT OF RED-THAI BINH RIVER SYSTEM.
Middle Fork Project Potential Project Betterments October 1, 2007.
1 Power Resource Management with assistance of Kevin Gawne Karl Reznichek and Dave Cormie.
Do Now:. Hydro Turbines: Power & Efficiency The Potential Energy of Reservoirs Dams force water to back up behind them into reservoirs which store the.
Do Now: How much water, in cubic meters, is inside of all of the humans on the planet Earth???
Where I worked for the day Dad’s team manages all of Contact Energy’s generation offers to New Zealand Electricity Market. There is over 20 computer screens.
Copyright © Texas Education Agency, All rights reserved. 1.
Tidal Energy. Contents : Renewable Energy : Renewable energy is generally defined as energy that comes from resources which are naturally replenished.
THE ENERGY FROM WATER The construction process of: -Hydro-electric turbines - Micro hydro-electric power stations in Technology.
1. A generating station which utilized the potential energy of water at a high level for the generation of the electrical energy is known as a hydro-electric.
Parc des Chutes- de-la-Chaudière Mini Hydro Project: Enhancement Through Development Lessons from a success story by Jean–Pierre Fau and Guy Dufort.
By: Tiffanie Thornton. Hydroelectric Power Diagram.
The main source of electricity generated in NZ. Fossil fuels Hydro dams Geothermal Wind turbines Hydro power. coal.
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation – 2a Topic 1: Electricity Generation – 2a.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
HYDRO POWER PLANT PRESENTED PRESENTED BY B.yedukondalu v.manikanta.
By Tasia Muse & Jada Mapp AP Environmental Science Mills 2014.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Electrical energy is a very convenient form of energy and it can be easily Converted into other forms. To meet the ever increasing use of electric power.
Electric Generators: supply electrical energy!
Hydropower introduction
Micro-hydro Understand the fundamental principles and
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Foundation Program in ICT for Education
BASICS OF ELECTRICAL ENGINEERING
By: Kelly Brown Matt Burger
The Journey of Hydropower in Snohomish County
Hydroelectric Damming of rivers and utilizing the potential energy store in the water. Eventually the stored water is released under pressure whereby.
Hydro Electricity.
Hydro electric (Hydel) Power Plant
Hydro electric (Hydel) Power Plant
Presentation transcript:

1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

2 Topics to be covered today Scheme modelling; Operating capability of Lochaber; Turbine selection; Penstock works.

3 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

4 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

5 Spey Dam

6 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

7 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

8 Laggan Dam

9 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

10 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

11 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

12 Loch Treig and Dam

13 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

14 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

15 Schematic of the Lochaber Scheme Loch Laggan & reservoir Loch Treig Spill Gravity Inflows Power- house Tailrace Spill Surge Chamber Loch Linnhe Spey reservoir Penstocks tunnel

16 Penstocks, Powerhouse and Smelter

17 Simplified Lochaber Scheme Model Q Tspill Q P/H Q Tin Laggan Q Tin Q Tunnel Treig Q Lspill Q Lin Q intakes Gravity Intake Flows are combined with Reservoir Inflows

18 Energy Modelling Results Trial Installed Cap. (MW) Overall Efficiency (%)7587 Headloss Coeff. (k) Operating ruleExt Max E Laggan Spill (mcm)2,0341,7944,1601,7091,2271, Treig Spill (mcm) Ave. Energy (GWh/yr)

19 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows

20 Operating Capability in terms of Loch Treig Level Note: 90.7% of water from Loch Treig 9.3% of water from gravity intakes

21 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows

22 Operating Capability in terms of Surge Shaft Water Level Penstock Limitation Note: 90.7% of water from Loch Treig 9.3% of water from gravity intakes

23 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows

24 Note: All water from Loch Treig Operating Capability in terms of Surge Shaft Water Level

25 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows

26 Operating Capability in terms of Surge Shaft Water Level Note: All water from gravity intakes

27 Scheme Operating Capability Diagram 9.3 % Q 90.7 % Q Average Operation 0 % Q 100 % Q No Gravity Inflows 100 % Q 0 % Q Max. Gravity Inflows

28 Example Operation exceeding Penstock Pressure Rise Limit

29 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model

30 Scheme Operation Frequency Plot

31 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model

32

33 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model

34

35 Turbine Selection The steps towards to turbine selection were: Analysis of historical data of scheme operation The number of generating units was selected – 5 Analysis of operating data from scheme model Performance data from tendering suppliers was fed into the scheme model

36

37 Penstock works Key aspects of the penstock works were: Need to undertake the works minimising shutdown of generation. Existing penstock system was very complex. In order to maintain double isolation, the penstocks needed to be dewatered sequentially. The works were complex with poor access. Decision with RTA to laser scan the penstock system and create a 3-D model.

38 Multiple buspipes Numerous Valves Bifurcations

39 Penstock Area – difficult terrain!

40 Penstock works Key aspects of the penstock works were: Need to undertake the works minimising shutdown of generation. Existing penstock system was very complex. In order to maintain double isolation for the penstocks needed to be dewatered sequentially. The works were complex with poor access. Decision with RTA to laser scan the penstock system and create a 3-D model.

41 Survey Point Cloud Data

42 AutoCAD 3-D Model

43 Project Summary The generating plant has been replaced to give 25+ years life extension. The water to wire efficiency has been improved from 75% to 90+%. Energy production increased from 460 GWh/yr to 600+ GWh/yr. The scheme’s capability is better understood and limitations identified. The scheme was completed ahead of schedule and is operating successfully with minimal disruption to Smelter operations during construction

44

Contact Details Andrew Thick BEng CEng MIMechE URS Infrastructure and Environment UK Limited International House, Dover Place Ashford Kent TN23 1HU United Kingdom Tel:+44 (0) Thank you for your kind attention