© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements


PROJECT RISK MANAGEMENT
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
ITIL: Service Transition
 Life cycle costing, LCC, is the process of economic analysis to asses the total cost of ownership of a product, including its cost of installation,
1 Introduction to System Engineering G. Nacouzi ME 155B.
Health Informatics Series
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Performance Measurement and Strategic Information Management
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Project Risk Management. Learning Objectives  Understand what risk is and the importance of good project risk management.  Identify project risks, describe.
Cost Analysis of Military Training Marcel C. Smit SAS-095 workshop on Cost-Benefit Analysis of Military Training Amsterdam, The Netherlands 5-6 June 2012.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Cost Management Week 6-7 Learning Objectives
© 04/16/20011 Logistics Systems Engineering System Cost Analysis, Part II NTU SY-521-N SMU SYS 7340 James R. Brennan, Product Assurance Analysts.
1 Logistics Systems Engineering Availability NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
What is Business Analysis Planning & Monitoring?
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management: Madness or Mayhem
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
1 Logistics Systems Engineering Logistics System Definitions NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
SynGenics Corporation 72 E Granville Road Worthington OH ©2003 SynGenics Corporation. All rights reserved. The Use.
From Research Prototype to Production
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 8 Performance Measurement and Strategic Information Management.
Software System Engineering: A tutorial
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1 Logistics Systems Engineering Reliability Fundamentals NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
1 ECGD3110 Systems Engineering & Economy. 2 Lecture 1 Introduction to Engineering Economics.
Feasibility Study.
Inventory/Purchasing Questions
Leadership in Engineering
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Risk Management 1. Risks and Risk Management Risks are potential events that have negative impacts on safety or project technical performance, cost or.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
© G. A. Motter, 2006, 2008 & 2009 Illustrated by Examples Quality Function Deployment and Selection Matrices Customer Driven Product Development.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Chapter 27 The Engineering Design Process. Learning Objectives Describe the various factors that are changing the design process Discuss the steps in.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Carnegie Mellon Software Engineering Institute © 2006 by Carnegie Mellon University Software Process Performance Measures James Over Software Engineering.
Supply Chain Performance Measurement “The more you measure, the more you know!” M.Tariq Yousafzai Innovator and Business Creator (ILSCM)
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Road Investment Decision Framework
ITIL: Service Transition
by Anthony W. Hill & Course Technology
Supply Chain Management for Non Supply Chain Management Professionals
Chapter 3: Cost Estimation Techniques
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
Chapter 3: Cost Estimation Techniques
Presentation transcript:

© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow

© 04/08/20012 System Cost Analysis Definitions Cardinal Principles Scope of Life Cycle Cost (LCC) LCC Model Structure & Analysis Flow LCC Applications LCC Phases LCC Analysis LCC Tracking Summary

© 04/08/20013 Definitions LCC: The total cost to the customer of acquisition and ownership of a system over its full life. It includes the cost of development, production, operation, support and where applicable, disposal. Cost Effectiveness: Consideration of performance, mission reliability, operational readiness (availability), etc., along with LCC to evaluate competing design or support approaches.

© 04/08/20014 Definitions Life Cycle Costing: An analytical study of a system’s live cycle cost- not an exact science. Design to Cost (DTC): Cost is a design parameter receiving consideration along with performance, schedule, etc. DTC is a management tool to integrate cost into the design process.

© 04/08/20015 Cardinal Principles Not an exact science - numerous estimations No right or wrong - reasonable or unreasonable No such thing as an LCC expert - too broad and deep Not a good budgeting tool - effective as comparison/trade-off tool

© 04/08/20016 Cardinal Principles Requires a project team approach - need specialized expertise Should be integral part of the design and support processes - DTLCC

© 04/08/20017 Scope of LCC LCC analysis can be applied on commercial as well as government programs Existing government programs require LCC analysis - increasing frequency is expected LCC analysis is applicable across all phases of a program - development, production and use

© 04/08/20018 Scope of LCC LCC analysis is applicable to software as well as hardware

© 04/08/20019 Typical LCC Model Structure ACQUISITION COST D & D COST NONRECURRING INVESTMENT COST Acquisition Cost Insert Model

© 04/08/ LCC Analysis Flow Doctrines Procurement Operational Maint./Support System Characteristics Standard Factors Input Data Estimates Cost Model Estimate of LCC Best Estimate of LCC Sensitivity Analysis

© 04/08/ LCC Applications Customer: –Affordability studies - measure impact of a system’s LCC on the system budget –Source selection - compare LCC among competing systems (suppliers) –Design trade studies - influence design aspects of systems that impact LCC Evaluate design alternatives Evaluate support alternatives Establish reliability and maintainability levels

© 04/08/ LCC Applications Customer (continue): –Repair level analysis –Warranty pricing and cost effectiveness Supplier –Identification of cost drivers for emphasis during program - sensitivity –Comparison of competing design and support approaches - ranking –Estimate of total LCC - tracking –Marketing tool - new and modified programs

© 04/08/ Life Cycle Costing in Sys. Acquisition SAE RM&S Workshop-April, % 85% 95% By end of concept studies By end of system def. By end of full scale devlp. Cumulative Percent of LCC System Life Cycle 50

© 04/08/ LCC by Program Phase Determination of Mission Need Conceptual Studies Investigation of Alternative Solutions Phase I Demonstration and Validation Phase II Engineering and Manufacturing Development Phase 0 Concept Exploration and Definition Phase III Production and Deployment Phase IV Operations and Support Identification/ Analysis of Major System Alternatives Competitive Demonstration Design and Test Selected System Alternative Design Tradeoffs Rate Production of System Warranty User Support Modifications/ Product Improvement

© 04/08/ Phased Lice Cycle Costs D&VFSD Development Costs Acquisition Costs Production Items Support Items Acquisition Costs Ownership Costs Operational and Support Costs (O&S) Impact on Force Structure Equipment/Personnel Logistical Support Systems Concept Annual Cost Life Cycle Phases

© 04/08/ LCC Analysis LCC Analysis Applications Types of LCC Analyses LCC Baseline Analysis Operating and Support Costs LCC Tradeoff Analysis

© 04/08/ LCC Analysis Applications Marketing Effort: conducted to demonstrate the cost advantage of a proposed system compared with existing equipment or competitors equipment Proposal Effort: Conducted per customer’s requirements and used as a customer evaluation tool

© 04/08/ LCC Analysis Applications Required Contractual Effort: Conducted per customer’s requirements and used to evaluate different alternatives or to monitor LCC as design matures General Program Support: conducted to assist internal management in deciding among alternative approaches to solving a problem or in evaluation the risk associated with particular decision

© 04/08/ Types of LCC Analyses Baseline LCC Analysis: Evaluates the life cycle cost for a particular system configuration for a given operational and maintenance environment Sensitivity Analysis: Determines the sensitivity of the output results ot key input parameters in order to identify ocst drivers which will require special controls and monitoring as well as improved model input accuracy

© 04/08/ Types of LCC Analyses Tradeoff Analysis: Evaluates different alternative approaches and selects a preferred candidate based upon a decision criterion such as cost, performance, availability or a weighted combination of these factors

© 04/08/ Types of LCC Analyses LCC Tracking: Monitors the life cycle cost of a system over an extended period of time, noting variances from an established baseline and from the previous estimate and relating these changes to hardware/software modifications, maintenance policy changes, scenario fluctuations or other factors

© 04/08/ LCC Baseline Analyses Sensitivity Analysis: –Pinpoints hardware/software, cost categories, and input parameters with greatest impact on LCC - drivers –Establishes thresholds for the drivers Reference point for subsequent LCC analysis Frequent drivers - from experience –Unit Production Cost (UPC) - The average cost per unit for defined quantities

© 04/08/ LCC Baseline Analyses Frequent drivers-from experience (cont.) –Mean Time Between Failures (MTBF) - with operating hours, estimates the expected number of failures per unit in a defined time frame –Mean Time To Repair (MTTR) - with labor rate, estimates the active maintenance labor cost per failure - determined for each maintenance level

© 04/08/ Operating & Support Cost: 20 Year Distribution Fuel 75% Sch Maint 2% Trans 5% Uns Maint 15% Spares 3% Operating & Support CostUnscheduled Maintenance Cost Parts Consumed LaborRepair Matl Elements of Cost 50% 40% 10%

© 04/08/ LCC Tradeoff Analysis Identifies preferred design/support candidate from LCC standpoint Provides ranking of candidates with respect to LCC - minimal emphasis on magnitude of LCC for each candidate (concentrate on difference(s)) Through sensitivity analysis, identifies thresholds on input data drivers where ranking of candidates is changed

© 04/08/ LCC Tradeoff Analysis Evaluates other tradeoff criteria, i.e., performance, operational readiness and mission reliability, and combines these with LCC for overall cost-effectiveness figure of merit

© 04/08/ LCC Tracking Indicates trend of total system LCC every 6 months - compare with baseline estimate Provides feedback to design and support engineers - status against assigned goals Control of LCC drivers related to the hardware/software - must meet specs Definition of tradeoffs to balance LCC drivers to control total LCC - triggered by increasing LCC over previous estimate

© 04/08/ LCC Tracking Minimize importance of absolute magnitude of LCC estimate - trend is the key issue Provides interval estimates for LCC prediction purposes - cost-risk analysis

© 04/08/ Life Cycle Cost Forecasting Margin of Error LCC Uncertainty LCC Time - Years SAE RM&S Workshop-April, 1989

© 04/08/ Relationship Between LCC and MTBF Cost ($) MTBF (Hours) Total Life Cycle Cost Operating and Support Cost Development and Acquisition Cost

© 04/08/ Conclusion LCC can be controlled on government and commercial programs through the diligent application of sound LCC Analysis Process DTLCC is a management tool to integrate LCC into the decision process DTLCC is not well defined and depends on ingenuity to make it work Tradeoffs are the cornerstones

© 04/08/ Conclusion Team concept is the vehicle for a successful DTLCC program - communication and cooperation Emphasis must be placed on the LCC drivers early in the design phase Cost must be traded off against performance to satisfy the true intent of DTLCC LCC Results must be related to the hardware/software to implement DTLCC

© 04/08/ Conclusion Design and support people must “Think LCC” continually if DTLCC is to be successful There must be a continual dialogue between customer and supplier for DTLCC to be successful - adequate time and funding