OSD CAIG 1 Walt Cooper OSD Cost Analysis Improvement Group (CAIG) August 13, 2008 Weapon System Sustainment: Collection of Contractor Costs.

Slides:



Advertisements
Similar presentations
Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Advertisements

1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
Depot Maintenance Partnering for PBL Managers Hollis Hunter OSD Maintenance Policy (DSN 225-)
Human Capital Strategic Planning for the DoD AT&L Workforce April 2004 Ms. Lisa Sper Federal Management Partners / (703)
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Division Director, O&S Cost Analysis
1 DOD Fleet Management Training and Certification 7/31/13.
1 Reducing Total Ownership Cost (R-TOC) and Value Engineering (VE) Dr. Danny L. Reed Institute for Defense Analyses June 8, 2006.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
1 Contractors on the Battlefield Mr. Gary Motsek Assistant Deputy Secretary of Defense (Program Support) November 12, 2009.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Cost 101 for Life Cycle Logisticians R&D Cost: program costs primarily associated with the development of a new or improved capability to the point where.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
DoD Parts Management Reengineering Defense Standardization Program Office Industry Day, 8 May 2007 PMRWG Final Report.
NIST Special Publication Revision 1
Tuesday, August 31, 2010 Dennis Wisnosky DoD Business Mission Area Chief Technical Officer & Chief Architect in the Office of the Deputy Chief Management.
Parts Standardization & Management Committee (PSMC) Meeting Oct 22, 2007 San Diego, CA Parts Management Reengineering Implementation Process Team (PMRIPT)
Adoption of Commercial EDI Standards for DoD Logistics Business Transactions Integrated Product Team (EDI IPT) – Expanded DEFENSE LOGISTICS AGENCY Report.
THE AFMC MOASP Air Force Materiel Command D. Brian Morris HQ AFMC/PKV (937) I n t e g r i t y - S e r v i c e - E x.
Revised Department of Defense Earned Value Management Policy Deborah A. Tomsic Senior Program Analyst Office of the Under Secretary of Defense (Acquisition,
1 Walt Cooper – OSD CAPE Jim York – Technomics August 27, 2009 Weapon System Sustainment: Collection of Contractor Costs.
Life Cycle Product Support Brief to LCL FIPT July 17, 2009.
Defense Cost and Resource Center Contractor Cost and Software Data Reporting: An Update Ron Lile August 2005.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Life Cycle Cost-Logistics Improvement Joint Task with NDIA Logistics Div August J. Cothran B. Pieper J.S. Moorvitch.
Continuous Learning Module (CLM) Status Update Defense Acquisition University.
UID Road Ahead LeAntha Sumpter December Data Roadmap Time Line FY-07 FY-06 FY-05 FY- 04/05 Enterprise Visibility AccountabilityValue OrganizationProgramLocationStatus.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Product Support Assessment Team (PSAT) Tom Simcik Performance Learning Director – Acquisition Logistics LCL FIPT 14 Nov 08.
PRIIA 209 Equipment Capital Working Group Ron Pate, Director Cascades Rail Corridor and Washington State Department of Transportation Rail Division.
Independent Expert Program Review (IEPR) February 2006.
Defense Standardization Program Policy Updates Steve Lowell Deputy Director Defense Standardization Program Office.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
PPBS Planning Programming Budgeting Systems. PPBS The Department of Defense is the only Agency to use this type of budget.budget.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010.
OSD CAIG 1 OSD Cost Analysis Improvement Group and ODUSD (L&MR)/LPP and MR&MP April 26, 2007 Weapon System Sustainment: A Project to Identify Requirements.
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Condition Based Maintenance Plus (CBM+) Overview
DLMS Migration DLMS “Jump Start” Defense Logistics Management Standards Office (DLMSO) UITC Meeting 13 December 2006.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
UID Program Plans.  Template Released after last JACG 14 October  Comments Rec’d from the Air Force and the Army Plans need to address: Cost, schedule.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
1 Services Contracting in the DoD: An Empirical Analysis of the Use of a Project Management Approach Breakout Session # D14 Dr. Rene G. Rendon, CFCM,
U.S. Department of Defense Foreign Comparative Testing Program How to participate and win?
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
GFP Attachment Fields Mandatory/Optional Updated 11 Jan 2016.
Animal Research funded by the U.S. Department of Defense 2015.
UNCLASSIFIED PSM Support to Cost Reporting 1. UNCLASSIFIED PSM Help Required 2 DoDI requires cost reporting on ALL Sustainment Contracts over.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Performance Based Logistics
DoD Template for Application of TLCSM and PBL
State Coordinator Intervention
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Performance-Based Logistics
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
DFARS CASE 2003-D009 Payment and Billing Instructions
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
Sustainment Issues Affecting the Cost Community ICEAA 2018
Office of Secretary of Defense
Joint Planning and Development Office “Where new ideas are welcome”
Business Case Analysis (BCA) Workshop
Energy Statistics Compilers Manual
FlexFile 101 MARCH 2019.
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
Presentation transcript:

OSD CAIG 1 Walt Cooper OSD Cost Analysis Improvement Group (CAIG) August 13, 2008 Weapon System Sustainment: Collection of Contractor Costs

OSD CAIG 2 Outline Background and purpose Current status Issues Next steps

OSD CAIG 3 O&S Costs Represent Largest Fraction of Life Cycle Costs, by Far RDT&E Procurement O&S

OSD CAIG 4 O&S Cost Analysts’ Major Responsibilities Preparation of life cycle cost estimates Formulation of budgets and programs Analysis of working capital funds Development of business case analyses Support of contract negotiations Success depends on analysis of actual O&S costs organized in a standard O&S Work Breakdown Structure (WBS)

OSD CAIG 5 The Source of O&S Actuals: Visibility and Management of Operating and Support Costs (VAMOSC) Only source of ready data on actual operating and support (O&S) costs of weapon systems Evolution –In 1974, Military Departments began developing programs for collection of actual O&S costs –Initial systems largely manual –In mid-1990s, Military Departments introduced automation Army OSMIS (Operating & Support Management Information System) Navy: Naval VAMOSC and USMC VAMOSC Air Force Total Ownership Cost (AFTOC) –Today, VAMOSC systems are state-of-the-art information systems with growing numbers of users Data provided in standard WBS

OSD CAIG 6 Today’s VAMOSC Program Army (OSMIS) Navy (VAMOSC) Air Force (AFTOC) Number of systems tracked Almost 1,500 1,800+ > 200 weapons, hundreds of sub-systems > 200 base operating accounts Data sources Active user accounts1, More than 2,500 active users across DoD.

OSD CAIG 7 An Illustration – The Navy’s F-18C ($M, FY 2005 constant) Historically, contractor support has represented a small percentage of O&S costs. But that is changing…

OSD CAIG 8 Current Trends Greater reliance on industry partners for sustainment –Many forms -- traditional Contractor Logistics Support (CLS), PBL, DVD –More use of public-private maintenance partnerships –Establishment of Product Support Integrators Industry supports sustainment of a growing number of aviation systems MRAP JPO relying extensively on industry for sustainment of MRAP in theater

OSD CAIG 9 F-22A O&S Costs (Then-year dollars in millions) Sources: AFTOC, AFMC 778 AESG/FM

OSD CAIG 10 Demand for CLS data is growing… top queries in FY 2008 for OSMIS

OSD CAIG 11 About The Project Objective: To recommend policy and procedures for collection of contractor costs in weapon system sustainment arrangements To be completed in FY 2009 Collaborative effort among the CAIG, OUSD (AT&L), and all military departments

OSD CAIG 12 Current Status Currently, numerous programs have proposed CSDR plans –Working these on a case-by-case basis –Plans map to O&S Cost-Estimating Guide WBS Long term –Establish formal regulatory requirements Draft DoDI establishes requirement for sustainment contract cost reporting AR (approved 26 Mar 08) requires program offices to provide O&S costs –Develop formats and procedures for collection Draft to be vetted with military departments this summer Will conduct workshops with selected program offices –Global Hawk (August 14) –JSTARS (August 15) –T-45 (August) –Stryker (?) Maintain dialog with industry

OSD CAIG 13 CSDR Sustainment Plans ProgramContractorStatus F-119 engine (F-22A)Pratt & WhitneyApproved Under contract week of 11 Aug 08; expected CY 2008 value of $215 million F-22A air vehicleLockheed MartinIn final review Expect to submit for approval week shortly; expected CY 2008 value is $653 million F-414 engine sustainment (F/E- 18E/F) General ElectricApproved Under contract; PoP: 1 Apr 2008 – 31 Dec 2010; contract value: $90 million F/A-18E/F Integrated Logistics Support BoeingApproved; undergoing mods to reflect contract changes Will be re-submitted shortly F-35Lockheed Martin, Northrop Grumman, BAE Approved Under contract

OSD CAIG 14 CSDR Sustainment Plans (Cont’d) ProgramContractorStatus StrykerGeneral DynamicsIn development Joint Cargo AircraftL-3Approved Under contract; PoP: 29 Aug 2007 – 29 Nov 2011; contract value: $2 billion C-5M RERP Interim Contractor SupportLockheed MartinIn development Light Utility HelicopterEADSApproved Data submitted V-22 Air Vehicle Joint PBLBell-BoeingApproved Will go under contract 1 st Qtr, FY 2009

OSD CAIG 15 Cost Analysts’ Desired Outcomes Periodic reports needed -- annual submissions preferred –To be used for updating budgets and programs, analysis of Working Capital Fund requirements –Consistent with VAMOSC system updates –However, must be synchronized with contract milestones Program and contract plans consistent with CSDR –O&S cost WBS –Other items, e.g, G&A, undistributed budget, fee Reports submitted directly to DCARC Subsequently sanitized and incorporated into VAMOSC systems

OSD CAIG 16 Issues to Address Protection of proprietary data Reporting frequency WBS/Level of detail Thresholds

OSD CAIG 17 Next Steps Continue to work with program offices on current plans Vet proposed standard formats and instructions with departments and industry Update cost-reporting appendix to DoD M, “Department of Defense Cost Analysis Guidance and Procedures Manual”