Abandoned Mine Lands Assessment of the North Yuba Watershed.

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
Cottonwood Wash Abandoned Mine Reclamation Project: A Partnership in Watershed Reclamation.
INTRODUCTION TO THE USE OF CERCLA FOR ENVIRONMENTAL CLEANUP PROJECTS USDA FOREST SERVICE Grants and Agreements Workshop February 28, 2002 Great Falls,
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Minerals and the Environment. The Rock Cycle Definitions Mineral –a solid homogenous (crystalline) chemical element or compound; naturally occurring.
Characteristics of Channel Darter Habitat in the Winooski River, Vermont Douglas E. Facey and Shannon M. O ‘Brien Department of Biology Saint Michael’s.
DRASTIc Groundwater Vulnerability map of Tennessee
Acknowledgements: Dr. Nancy Hoalst Pullen Department of Geography, Kennesaw State University, Dr. Jay Gatrell Department of Geography, Indiana State University.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
SCR-15 Coal Slurry Underground Injection. SCR-15 “That the Department of Environmental Protection and the Bureau for Public Health shall jointly design.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
Information from stream sediments Measurement of concentration of metals present (as solids) in sediment Gives information on: 1.Background levels of contamination.
Anthropogenic Background Historic Fill WSCAC March 2015
Overview of Exercise Module 1 – Geologic Setting Module 2 – Flow Regimes Module 3 – Downstream Effects.
Earth Science Mercury in the Environment Santa Clara High School Todd Space Kenn Chase.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
Soil Testing Methods Chapter 8.
+ Gold Mining Monica, Alicia, & Jon. + Techniques Placer Mining Panning Sifting through to try and find the denser gold Sluicing Uses a sluice box ( panning.
Hydrologic Issues in Mountaintop Mining Areas Ronald Evaldi, USGS-WSC, Charleston, WV Daniel Evans, USGS-WSC, Louisville, KY Hugh Bevans, USGS-WSC, Charleston,
29 th International conference SEGH, 8-12 July Toulouse, FRANCE 2013 Health risk estimate for groundwater and soil contamination in the.
Mercury: From the Sierra to the Delta… and beyond! Izzy Martin The Sierra Fund.
Department of the Environment Overview of Water Quality Data Used by MDE and Water Quality Parameters Timothy Fox MDE, Science Service Administration Wednesday.
Stream Quality Analysis Problem Based Learning Module Kerry Hartman Fort Berthold Community College.
GIS Tools for Watershed Delineation Public Policy Perspectives Teaching Public Policy in the Earth Sciences April 21, 2006 Gary Coutu Department of Geography.
1 of 35 The EPA 7-Step DQO Process Step 4 - Specify Boundaries (30 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 4.
Vulnerability of freshwater fish communities to human mediated impacts Jenni McDermid 1 and David Browne 1,2 1 Wildlife Conservation Society Canada, Peterborough,
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Dept. of Agricultural and Biosystems Engineering Iowa State University How is.
Karst Topography – Developing a Sinkhole Inventory to Protect Groundwater Quality Presenters: Stacey Jarboe and John-Paul Brashear Stantec Consulting Services.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Water Quality Data, Maps, and Graphs Over the Web · Chemical concentrations in water, sediment, and aquatic organism tissues.
Earth Science Daily Challenge, 11/30 There will be a TEST on Minerals and Mining this WEDNESDAY. What QUESTIONS do you have about minerals and mining or.
Implementation of the Particle & Precursor Tagging Methodology (PPTM) for the CMAQ Modeling System: Mercury Tagging 5 th Annual CMAS Conference Research.
April 2012 Improving Remediation Planning through Effective Mine Material Delineation Formosa Mine Superfund Site, Douglas County, OR Mark Nelson PG Nicholas.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
State Water Planning Presented to State Water Plan Regional Advisory Committees December 8-19, 2003 William A. Gast Chief, Division of Water Use.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
1 Groundwater Pollution Week 1 – 0306 Introduction to Groundwater.
1 of 39 The EPA 7-Step DQO Process Step 3 - Identify Inputs (45 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 3.
Expanding Water Quality Assessments beyond the Realm of 'Impairments' and into a Tool Useful to Watershed Managers at the Local Level Ken Edwardson Watershed.
Characterizing Ground-Water Flow Paths in High -Altitude Fractured - Rock Settings Impacted by Mining Activities Mike Wireman, U.S. EPA Region 8 Dr. Mark.
ICGGE 2003 Mike Wireman US EPA Region
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
U.S. Department of the Interior U.S. Geological Survey Norman B. Bliss, ASRC Federal InuTeq Contractor to the USGS 6/4/2015 A continental view of soil.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
BOT / GEOG / GEOL 4111 / Field data collection Visiting and characterizing representative sites Used for classification (training data), information.
Metal Sorption Properties The binding behavior of Zn, Cu, and Pb relates to the surface complexation constant, K int. Dzombak and Morel, 1990 Assessment.
WMAN Conference 2005 COMPARISON OF PREDICTED AND ACTUAL WATER QUALITY In Environmental Impact Statements for major hardrock mines in the U.S. James Kuipers,
Chapter 16: Mining and Mineral Resources
Mining in Canada.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Greg Reller  Thank you EPA staff for inviting me.  Many co-workers who have taught me.  Clients who have provided the opportunity.
Think about answering the questions: Who? What? Where? When? Why? How? Before your volunteers begin collecting data.
Spatial Distribution of Arsenic in Ohio Soils Nate Wanner, CPG Cox-Colvin & Associates, Inc. Ohio Brownfield Conference 2016 Columbus, Ohio April 6, 2016.
 Water Quality Variability in a Bioswell and Concrete Drainage Pipe, Southwest Lincoln, Nebraska Jessica Shortino, B.S. University of Nebraska-Lincoln.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Placer County Water Agency Middle Fork American River Project FERC Project No February 26, 2008.
Qays Jasim Saud Syed E. Hasan Department of Geosciences
Debra S. Baker and Donald G. Huggins
MINING.
Assessing Vulnerability & Climate Change Impacts
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
APES 1/9 Get a computer.
Hydrologic Investigation Summary
Presentation transcript:

Abandoned Mine Lands Assessment of the North Yuba Watershed

Purpose and Scope California Bay-Delta Authority contracted with the Department of Conservation to select a high priority watershed and perform an assessment of the abandoned mine issues. Collected data during field work and combined with historical data to form the North Yuba Watershed database.

Watershed Selection Watershed based on water flowing in to the bay-delta area. Selection criteria for priority watersheds were created by analyzing many geospatial datasets.

Watershed was partitioned into 2 regions: Coast Range and the Sierra Nevada. Sierra Nevada Province: anthropogenic mercury and arsenic Coast Range Province: natural mercury and geothermal activity.

Geospatial datasets Seven datasets used in watershed selection: –Principle Areas of Mine Pollution (PAMP), mines with production over $100,000 that could impact WQ –arsenic occurrences, derived from USGS’s Mineral Resources Data System (MRDS). –public ownership, public vs. private. –acid rock drainage, sites with acid generating ore minerals and bodies from MRDS. –historic hard rock mining, from USGS 1:24,000 topo maps –historic hydraulic mining, from USGS 1:24,000 topo maps –watershed boundaries

Matrix for Scoring Watershed Categories Matrix for Ranking Watersheds

Mining History First gold discovery party was lead by “Major” William Downie. Claims were set based on “30 feet per man” Population over 5,000 in 1851

Mining History, cont. Surface placers worked intensively Extensive hydraulic mining took place between the 1850s and 1884, with some operations worked into WWII. Drift placer mining developed around the same time as hydraulic mining. Lode gold production began in 1853 and lasted until the 1960’s

Sample Design Contracted to visit at least 100 sites. 128 mine sites actually visited.

Sample Design,cont. Used USGS 7.5 minute topographic maps to determine where to catalog. 400 topo symbols in North Yuba, 221 cataloged Attempted to visit PAMP sites first but was unsuccessful.

Data Acquisition Historical literature search (commodity, extent of workings, processing methods, etc.) In the field, data collected on location, character and condition of mine sites and features. Location information for each mine feature was collected with a Trimble GPS to an accuracy of 10 meters or less. Screening parameters for on-site water sources: pH, electrical conductivity, oxidation-reduction potential and temperature. Limited grab soil samples were taken when appropriate.

Soil Sampling For underground mines: sampled tailings dumps and fine- grained waste rock dumps. Dumps with varied physical characteristics were sampled in each discreet unit of the material. For hydraulic mines, sampled fine-grained tailings, sediment down gradient of probable ground sluices and tunnel exits. Also sampled mill areas and impoundments Methodology: Top 1-2 inches was discarded and only material deeper than 1 inch was bagged in “Whirl-Pack” bags to be tested. The 18 oz. bags were filled 1/3 to 3/4 full, sealed and placed in a second clean and empty bag and sealed. GPS recorded the exact locations of each sample.

Ironsides Mine

AS=130 ppm, Hg=47 ppm, Pb=590 ppm

Soil Sample Analysis The soil samples were shipped to CLS Labs in Rancho Cordova. Samples were air dried and sieved to a particle size of 1.0 mm. Samples analyzed for arsenic, lead, mercury using EPA methods: –EPA (cold vapor test) for mercury –EPA (ICP) for arsenic and lead

Arsenic Lead Mercury

Site Summary

Priority Listing of Sites 2 priority lists developed Matrix for Ranking Sites Based on Chemical PAR Score Chemical PAR Score Ranking of Sites

Matrix for Scoring Sites by Chemical PAR Scores and Soil Sample Results Matrix for Ranking Soil Sampled Sites

Ranking of Soil Sampled Sites

Further Actions Complete inventory of the watershed, both private and public lands. Full site characterization, including detailed studies into the geology, hydrology and biology. Sampling program to examine downstream effects of high mercury, lead and arsenic concentrations.

Comments Sarah Reeves (916)