Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

Overview of the interoperability Regulation
FANS (Future Air Navigation System) Flight Crew Procedures
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Air-Ground Data Link - DFS Strategy
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
ATN 2001, London - 18 Sep 01 1 PETAL II and II Extension Maastricht Multi-stack Implementation Lessons Learnt Prepared by Gustaaf Janssens/Konrad Koebe.
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Data-link: Fact and Fiction Kim O’Neil Advanced Aviation Technology Ltd.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
ATN 2001, London - 18 Sep 01 1 PETAL II Extension Architecture, Integration and Testing Prepared by Martin Adnams/Isabelle Herail.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
20 FLIGHT OPERATIONS TECHNOLOGY Innovations in flight FANS-1/A involvement and future Captain Joe Burns Director – Flight Operations Technology.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Data Communications Implementation Team (DCIT)
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
International Civil Aviation Organization
Presented by Thales Avionics ATN 2003 London, UK September 2003
The Air Ground Datalink Server (AGDS)
FANS (Future Air Navigation System) Flight Crew Procedures
NEXCOM Next Generation Air/Ground Communications Appendix G
Ground System implication for ASAS implementation
Presented at ICAO ACP WG-I By Robin Hughes
Data Communications Program
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
An Airline Perspective
Presentation transcript:

Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD PETAL-II Preliminary Eurocontrol Test of Air/ground data Link, Phase II Operational Validation & Early Implementation Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD

Topics Aims and Objectives Current Operations Results and Lessons ATN extension & PIT

Original Context

We are Essentially Done We Met Our Original Objectives in 1998 Multiple equipped aircraft on one channel Total rewrite of the key service (transfer) Numerous defects identified (e.g. timers) Requirements gaps identified Operational contact exceeds expectations Accelerated implementation of air/ground datalink Within cost and schedule targets Operational package validated

New Objectives: PETAL-IIe Virtually no trials objectives left after 1998 AAL offered First fully certified and approved ATN avionics End-to-end functionality based on cooperative FAA and European development Transatlantic harmonization for full operations

PETAL-II Operational Package Operational trials, in situ, with users Pilot and controller always in command Voice readback before clearance execution Fully silent for all other communications CPDLC message set (42 up, 22 down) Routine R/T (transfer, level, route, heading, crossing conditions, vertical rate, speed, etc.) A little ADS and CM / AFN (log-on) ATN (and FANS-1/A) compliant events. Multiple a/g datalink-equipped aircraft

End-to-End Partners, Current Ops SAS, Lufthansa SRA, ANZ, UAL, DLH, QFA, SIA, ACA, COA Simulation Downlink Parameters ICAO CNS/ATM Operational data and behavior SITA VDL-4 prototype ATN FANS-1/A VDL-4 stations Mode-S Maastricht PETAL-II Gateway France

Applicable Airspace (in 2010) red: >200 IFR flights / day

Maastricht Controller HMI

NEAN Airborne HMI

B747-400 MCDU

B777 Flight Deck

Airbus Flight Deck OPEN AT ALCOA CLB TO & MAINT FL310 ATC COMM 2119Z FROM KZAK CTL AT ALCOA CLB TO & MAINT FL310 OPEN *UNABLE <OTHER STBY* WILCO* ATC COMM

PETAL-II Review (current ops) 4087 flights used CPDLC thru August 2000 Now 300+ CPDLC flights / month Regular use from DC-9: SAS (NEAN) - currently deactivated B747-200: DLH (NEAN) - currently deactivated B747-400: DLH, QFA, ANZ, SIA, ACA (FANS-1) B777: UAL, COA (FANS-1) Multi-stack operations in place All day, all sectors (16)

Overall Activity

Operational Acceptance Lessons Performance stability seems to be a key Controller familiarity is a key risk Target: One flight per controller shift Training is critical and it does not go away after IOC HMI is critical (air and ground) Advanced displays needed on ground Dedicated displays recognized as useful for air EICAS appreciated in air Mode control panel synch appreciated in air Advanced air HMI appreciated on ground

HMI, HMI, HMI

Operational Uplinks Sent

Message Set lessons Sub-sets are needed, and will exist Interop mechanism needed to assist crews and controllers in handling them Go slow: build a little Your controllers and crews have enough to learn with CPDLC; don't swamp them Start with the HMI; you'll cut your messages There is a common set across airspaces If we can define it, we can optimize HMIs.

Pay Attention to Transfer of Comm Essential service (if it doesn't work, nothing does) Probably the highest operational benefit 8.33 channels noticeably increased its utility Major differences with other regions = trouble If you do, both aircrew and controllers will suffer In this airspace, don't assume datalink Design for voice transfers as common mode Holds true for all CPDLC services

Mixed Equipage Simultaneous datalink aircraft / sector Up to 30 aircraft (all types) in sector at one time Max number datalink aircraft: 3 Flight time / sector: 5 - 30 minutes Overlap time: 1 - 26 minutes Datalink use: heavy to not at all Mixed equipage preliminary results Not considered a serious problem but Will limit benefits Minimum one flight per control session required

Multi-Stack Architecture Controller HMI Flight Data Processing System - Flight plan / address association - ATN SARPS (ICAO doc 9705), CPDLC, ADS, CM - All datalink service logic (e.g. connection set-up / transfer, timers, etc.) P2FEP NFEP - Aircraft address/state - ASE emulation CM, CPDLC, ADS - Data conversion FaFEP - ASE emulation CM, CPDLC, ADS ALLA ProATN - ASEs: CM, CPDLC, ADS - ATN Router FANS-1/A Gateway NEAN Server IDD BER PER PETAL Gateway

PETAL In A Nutshell

FANS-1/A Accommodation (2) Key shortcomings for this airspace type Legacy / older HMIs Lack of magnetic heading in ADS ADS event contract limitations Airways / route designator definitions ( 7 vs. 5 ch) RCP (reliability, performance, integrity) Key log-on data missing No lat/long back-up for route points ARINC 424 vs. ICAO nav databases No logical response (European issue) Old messages displayed without warning Delivery Assurance??

Our Biggest Keys to Success

Minimize Your Procedural Fixes Work the procedures during systems design allows you to use system solutions to fix system problems procedural work-arounds are bad news Procedures will break-down Step on the phrase "That won't happen if they follow the procedures" Sometimes, they won't follow the procedure. Recognise that, and help them if you can.

ODIAC Methodology Direct quote from a requirements document: The standardisation afforded by the SARPs provides assurances that aircraft implementations by different manufacturers will be interoperable with … ground systems This is not entirely accurate PETAL-II implemented: rapidly, and with very few "teething pains" We had the ODIAC source material (end-end) We maintained the multi-discipline, user-driven approach

Pre-requisite: Integration Team Develop End-to-End Specifications End-end procedures, automation, messages interoperable use of SARPS, now to DO/ED Plan and coordinate certification Plan and coordinate initial fielding (air, ground, comm) Formalise issues via RTCA/Eurocae, ICAO Monitor and manage operations Multi-discipline approach essential Introduced after firm commitments Accountability essential Streamlined structure essential Standards bodies are not well suited to this

Certification Framework

End-to-End Partners, Next Generation SAS, Lufthansa AAL SRA, ANZ, UAL, DLH, QFA, SIA, ACA, COA Simulation Collins Avionics Downlink Parameters ICAO CNS/ATM Operational data and behavior SITA ARINC a/g ATN VDL-2 VDL-4 prototype ATN FANS-1/A VDL-4 stations Mode-S Maastricht PETAL-II Gateway French Shadow Mode FAA France

PETAL-II Integration Team (PIT) Op Concept 1997 1998 1999 1996 1995 1994 2000 2001 2004 2002 2003 2007 …. 2006 2005 PETAL Op Requirements PETAL-II PETAL-II extension Sim LINK PIT Base-1 Base-2 FAA Implementation Program Sim B-1 B-1A CPC B-2 ADS AIDC 1 8

ARINC PETAL II VDL Mode 2/ATN Coverage (FL250)

Conclusion Additional Partners always welcome FANS-1 (controller familiarity now) ATN (help achieve operational harmonization) Monthly report, PIT, or newsletter distro? Contact rob.mead@eurocontrol.be petal2@eurocontrol.be www.eurocontrol.be/projects/eatchip/petal2/