Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.

Slides:



Advertisements
Similar presentations
Air / Ground Communications in Europe
Advertisements

The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
Surveillance in Europe: status and plans
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
EASA Airborne Separation Assistance Systems (ASAS) Certification
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
NextGen & ADS-B Presentation to Aviation Accreditation Board International (AABI) Industry/Educator Forum July 18, 2013 Kansas City, MO.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
The CASCADE Programme Validation Results ASAS TN2 27 September 2005 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL European Organisation.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Air Traffic Management Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP RVSM Implementation in Europe.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
ASAS Thematic Network II First Workshop Savoy Hotel, Malmö.
ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager.
ADS-B Out, In and GNSS Requirements Update
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B Regulations, Standards and Guidance
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Rome November 2008 Johan Martensson, CASCADE
International Civil Aviation Organization
Chris Shaw, EUROCONTROL Experimental Centre
EUROCONTROL SURVEILLANCE STRATEGY
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
Presentation transcript:

Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety of Air Navigation

Overview CASCADE Programme: Scope, Implementation Policy, Worldwide Co-ordination CASCADE Validation: Status: ADS-B out & ADS-B in, Pioneer Airlines, Monitoring Requirements Focus Group: Within CASCADE, Status, Planning Timeline: Standardisation, Certification, Rulemaking

CASCADE Programme

CASCADE Scope Ground Surveillance Applications (ADS-B-out) ADS-B Receiver In a non-radar environment In a radar environment On the airport surface Airborne Derived Data Airborne Surveillance Applications (ADS-B-in & TIS-B) Situational awareness on the surface Airborne situational awareness Visual separation on approach In Trail Procedure

The Bigger Picture 2015 IR based implementation in wider areas upgraded equipage voluntary implementation in pocket areas certified existing equipage

The ADS-B Implementation Policy

ADS-B in other Continents Worldwide Co-ordination

CASCADE Validation

First “ADS-B out” Implementation Sites LVNL (Netherlands) implements ADS-B NRA with WAM (2009 in N. Sea) LFV Sweden implements ADS-B NRA (2008, Kiruna) ADS-B RAD (2009, Ostgota) 7 ANSPs (CRISTAL MED:Cyprus, France, Greece, Italy, Malta, Portugal, Turkey) validate ADS-B NRA & RAD towards implementation decision by 2008 DFS has included ADS-B (and WAM) in its SUR Strategy Target date is 2015

ADS-B-in: Emerging implementation CRISTAL ATSAW (simulations of ATSA VSA, SURF, AIRB) to be completed in Oct 2007 CRISTAL ITP (simulations and trial in N. Atlantic) ongoing CRISTAL Germany (TIS-B feasibility for ATSAW) ongoing CRISTAL Sweden (ATSAW trials for GA) completed: Implementation by 2009 (Ostgota) Certification target date: 2009

ADS-B Implementation Roadmap ADS-B-NRA Pre-ops ValidationImplementation ADS-B-RAD ATSAW-VSA ATSAW-ITP Initial ValidationPre-ops ValidationImplementation ADS-B-APT ADS-B-ADD ATSAW-AIRB ATSAW-SURF Initial ValidationPre-ops ValidationImplementation NRA: In Non-Radar Airspace RAD: In Radar Airspace VSA: Visual Separation on Approach ITP: In Trail Procedure APT or SURF: On the Airport Surface ADD: Aircraft Derived Data for ground tools AIRB: During flight operations

ADS-B Pioneer Airline Project Target: “ADS-B out” Certification 17 Airlines Aircraft – flights/year

Pioneer Airline Project Monitoring & Certification Airworthiness Approval Avionics Vendors Airframers Airlines CASCADE Avionics Design Statistical Evidence Possibly supporting means of compliance demonstration (in-flight statistics) Primary means of compliance demonstration (design assurance, tests)

Timeline D3: 1 st Pioneers Certified EASA AMC JAA NPAED-126EASA NPA NPA: Notice of Proposed Amendment AMC: Acceptable Means of Compliance Comments Deadline: 7 Sep DecJanFebMarAprMayJunJulAugSepOctNovDecJan D1: high-level fleet info D2: detailed fleet info Certification Application “ADS-B Certification Workshop” Nov in Palma (hosted by Air Europa)

Requirements Focus Group

High-level RFG Planning Dec 06Apr 07Aug 07Dec 07Apr 08Aug 08Dec 08 Apr 09Aug 09 ADS-B-NRA (ED-126, DO-303) Enhanced ATS in Non-Radar Areas TBD: ASPA-S&M Enhanced Sequencing & Merging Operations (advanced as background task – feasibility check in Jan 08) ADS-B-ADD – Aircraft Derived Data for Ground Tools ADS-B-RAD ATSA-ITP ATSA-VSA ADS-B-RAD: Enhanced ATS in Radar Areas ATSA-ITP: In-trail Procedure in Oceanic Airspace ATSA-VSA: Enhanced Visual Separation on Approach ADS-B-APT ATSA-AIRB ATSA-SURF ATSA-APT: Airport Surface Surveillance ATSA-AIRB: Enhanced TSA During Flight Operations ATSA-SURF: Enhanced TSA on the Airport Surface

Application Status ADS-B-RAD, ATSA-VSA & ATSA-ITP OSEDs are “frozen”: Apart from ATSA-VSA “enhanced procedure” Assessments are concluding: Safety (incl. surveillance risk modelling), Performance & Interoperability SPR/INTEROP document Integration to commence Critical step to facilitate wider review Target dates for EUROCAE/RTCA approval: ATSA-ITP – April 2008 ATSA-VSA – April 2008 (tbc) ADS-B-RAD – July 2008

RFG – 2007/2008 Meetings Week of 15 October 2007 (Europe, Toulouse) Week of 21 January 2008 (USA, Melbourne) Week of 07 April 2008 (Europe, Brussels)

Overall Timeline: Standardisation, Certification & Rulemaking

Overall Timeline: Standardisation, Certification & Rulemaking Overall Timeline: Standardisation, Certification & SES Rulemaking RFG SPR/INTEROP RAD, VSA, ITP APT, other ? AIRB, SURF FAA TSO C166A > <2007 Implementation EC SES IR Rulemaking EUROCAE/RTCA 1090 ES Transponder MOPS NRA EASA/FAA (E)TSO-166x Towards Joint Transponder TSO EASA ‘RFG’ AMC ED102/DO260 DO260A EASA NRA AMC EASA/FAA Rulemaking Initial Implementations – Pioneer Phase existing avionics ADS-B out Mandate avionics upgrade SPI IR MoC ED102A DO260A+ Towards Joint MOPS INTEROP Validation ADS-B in (voluntary)

Summary “ADS-B” out rulemaking on its way World-wide co-ordination ADS-B Pioneer Airlines & Monitoring Projects … … ED102/DO260 certification for early deployment RFG key to rulemaking baseline

Thanks

Backup

Scope of ADS-B Airborne Monitoring 1090 ES “ADS-B out“ Extended Squitter BDS 0,5 BDS 0,8 (BDS 0.9) (BDS 6,1) (BDS 6,5) Transponder Control Panel Callsign SPI-ES GNSS Position HPL HFOM Velocity Barometric Altimeter FL Mode S Transponder 24-bit address NUC-NIC/NAC Consistency (Mode A/C/S) Consistency (Performance) Correctness Performance Analysis (incl. latency) ALL: “counting” statistics

RFG within the CASCADE Context ASA/GSA SPR-INTEROP Simulations, Trials & Monitoring Procedures ATC Manual Aircrew Manual Ground Infrastructure Avionics System Standards Preliminary Safety Case EASA & JAA Regulation Airworthiness Approval Operational Approval EC SES Regulation