Neptune Power Overview- 1 All rights reserved © 2003, Neptune NEPTUNE power subsystem Progress and Plans April 2003 Harold Kirkham.

Slides:



Advertisements
Similar presentations
Unit 8 Combination Circuits
Advertisements

Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Virtualization and HA PI Systems: Three strategies to keep your PI.
DC-DC Power Supply Design for the Computing Industry Presented by Ronil Patel 12/03/03 EE Power Electronics SJSU © 2003.
Power System for Ocean Bottom Observatories Taken from the Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Buck Regulator Architectures
NEPTUNE Power System Low Voltage Circuit Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
EKT214 - ANALOG ELECTRONIC CIRCUIT II
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
Lecture 3: Resistive Circuits Nilsson & Riedel , 3.7 ENG17 (Sec. 2): Circuits I Spring April 8, 2014.
Lecture 2: Resistive Circuits Nilsson 2.5, , 3.7 ENG17 : Circuits I Spring April 2, 2015.
150W Inverter - an optimal Presenter: Dr Gawie van der Merwe design in solar home systems.
Software Process Model
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
May 17, 2005 E-sign Web Forms replace Paper Forms Presented by: Bob Schneider Western Washington University.
NEPTUNE Branch Unit Operations and Circuit Design Shuai Lu, Prof. El-Sharkawi EE, University of Washington March 31, 2005.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
North East Pacific Time-series Underwater Networked Experiment (NEPTUNE): Power System Design, Modeling and Analysis Aditya Upadhye.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Textbook  “Data Communications and Networking” 2 nd Edition by Behrouz A. Forouzan  “Data and Computer Communication” 6 th Edition by William Stallings.
Chapter 8.
NASA EEE Parts Challenges for Spaceflight Electronics National Aeronautics and Space Administration Quality Leadership Forum March 21, 2013.
Applied Circuit Analysis Chapter 3 - Power and Energy Copyright © 2013 The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
FAULT TOLERANT POWER SYSTEMS Carsten Nesgaard Advisors: Professor Michael A. E. Andersen Professor Seth R. Sanders Ext. collaborators:
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
EXCiPACT TM EXCiPACT TM International Pharmaceutical Excipients Certification Minimize risks – maximize benefits.
Command and Data Handling (C&DH)
Mission Assurance Concepts and Discussion NEPTUNE Power CoDR Richard Kemski June 10, 2002.
Chapter 3 Power System Harmonic Mitigation. INTRODUCTION Power system harmonic issues have existed since the early 1900 ’ s. The earliest discovered issues.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
New proposed BU circuit and control logic design University of Washington.
Chapter 8 Principles of Electric Circuits, Electron Flow, 9 th ed. Floyd © 2010 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Intent Specification Intent Specification is used in SpecTRM
EDI communication system
M340 Modbus Plus Proxy Link legacy systems to Ethernet
SONIC-3: Creating Large Scale Installations & Deployments Andrew S. Neumann Principal Engineer, Progress Sonic.
Chapter 6 Voltage Regulators By En. Rosemizi Bin Abd Rahim EMT212 – Analog Electronic II.
Find the Norton Equivalent as seen by resistor R 7. Problems With Assistance Module 4 – Problem 3 Filename: PWA_Mod04_Prob03.ppt Next slide Go straight.
Software Safety Case Why, what and how… Jon Arvid Børretzen.
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
Reliability and availability considerations for CLIC modulators Daniel Siemaszko OUTLINE : Give a specification on the availability of the powering.
SONIC-3: Creating Large Scale Installations & Deployments Andrew S. Neumann Principal Engineer Progress Sonic.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
Signamax™ Cabling System Review Revision E. INTRODUCTION.
Reliability Applied to KM3NET
Harold Kirkham Jet Propulsion Lab 21 May 2002 The NEPTUNE Project: Wiring the Juan de Fuca Plate for Science Bruce Howe University of Washington.
EMT212 – Analog Electronic II
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
Neptune Power Versions compared 1 All rights reserved © 2003, Neptune Power sub-system Versions 1 and 2 Key features V2 is functionally equivalent to V1.
NEPTUNE Power System Controller Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
Power Monitoring And Control System (PMACS) Kevin Schneider, Chen-Ching Liu University of Washington Department of Electrical Engineering.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Power System Restoration Kevin Schneider, Chen-Ching Liu University of Washington Department of Electrical Engineering.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
PRO-H Power Supplies. PRO-H Series  P owerful R eliable O ptimized - H azardous Areas  Complete family of Power Supplies 1-phase 3.8A up to 25A  Output.
Electricity. TYPES OF CIRCUITS Individual electrical circuits normally combine one or more resistance or load devices. The design of the automotive electrical.
Dr inż. Agnieszka Wardzińska Room: 105 Polanka cygnus.et.put.poznan.pl/~award Advisor hours: Monday: Wednesday:
Chapter 6: Voltage Regulator
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
CS 389 – Software Engineering
M. Hansen, CERN S. Lusin, CMS TC / UW
A lecture for Arduino Course, Winter 2017/18
PSU-Lab: A valuable expertise shared and open to CERN users
Integrating CCSDS Electronic Data Sheets into Flight Software
Chapter 16: Distributed System Structures
Chapter 2 – Software Processes
GLAST Large Area Telescope:
Presentation transcript:

Neptune Power Overview- 1 All rights reserved © 2003, Neptune NEPTUNE power subsystem Progress and Plans April 2003 Harold Kirkham

Neptune Power Overview- 2 All rights reserved © 2003, Neptune Presentation outline Progress review –Converter –Mission Assurance –Delivery system –Documentation Plans

Neptune Power Overview- 3 All rights reserved © 2003, Neptune

Neptune Power Overview- 4 All rights reserved © 2003, Neptune

Neptune Power Overview- 5 All rights reserved © 2003, Neptune Progress: Converter All operating principles demonstrated –Efficiency and Voltage Regulation are excellent –Current is evenly shared by parallel stages –Voltage is evenly divided by series stages DC-DC Converter DC-DC Converter DC-DC Converter DC-DC Converter LOAD

Neptune Power Overview- 6 All rights reserved © 2003, Neptune Progress: Converter Efficiency

Neptune Power Overview- 7 All rights reserved © 2003, Neptune Progress: Converter Regulation

Neptune Power Overview- 8 All rights reserved © 2003, Neptune Mission Assurance Four aspects: –Converter –Node Distribution System –Delivery System –Communications

Neptune Power Overview- 9 All rights reserved © 2003, Neptune Mission Assurance: Converter Converter stack MTBF estimated: 40 years –Assume worst-case: failure takes out stack –Assume cold-standby redundancy –Assume 30 year NEPTUNE lifetime –Observatory may need a few replacements Assume substring failure is not fatal –Converter power de-rated by 17% –Observatory may never need a replacement The Message is: Don’t worry – BE HAPPY!

Neptune Power Overview- 10 All rights reserved © 2003, Neptune Mission Assurance: Node Distribution Distribution system power at 400 and 48 V –Assume 400-V source is solidly available –Assume 48-V COTS converters –Assume COTS switches –This is so simple, we have deferred the design BOTE cost estimates done by JPL & UW –JPL cost: $2,000,000 –UW cost: $250,000

Neptune Power Overview- 11 All rights reserved © 2003, Neptune Mission Assurance: Node Distribution JPL assumes –Hardware handled by certified people only –Complete paper trail for all activities –Extensive testing, with tests traceable back –Environment complies with ESD and contamination rules –All handling requires multiple personnel UW assumes –Hardware handled as needed –Marginal paper trail –Some testing

Neptune Power Overview- 12 All rights reserved © 2003, Neptune Mission Assurance: Node Distribution The difference between these numbers is one of culture The two cost estimates are equally valid Neither is “right” or “wrong” The product of the work is different, however You pay for what you get Is there a middle ground?

Neptune Power Overview- 13 All rights reserved © 2003, Neptune Mission Assurance: Delivery System Triggered by concern over converter reliability, we have devised a “Version 2” The original motivation may not be valid, but the new design brings major benefits The biggest benefit of Version 2 is that node failures (power supply or comm failure) do not affect the backbone This segregation of function leads to better observatory availability

Neptune Power Overview- 14 All rights reserved © 2003, Neptune How does Version 2 work?

Neptune Power Overview- 15 All rights reserved © 2003, Neptune Component availability Zeners, qualified to 2A, preliminary study done for 10A upgrade Capacitors, qualified Latching relay, similar to qualified, limited re-qualification needed Resistors, similar to part in qualification Bridge, qualified Controller, space qualified part may be suitable, limited development, or control by analog electronics (qualified)

Neptune Power Overview- 16 All rights reserved © 2003, Neptune Version 2 power sub-system Pros and Cons High reliability – Parts are qualified or low development cost –Low component count –Low power consumption –Switching only at low power Segregated functionality – Better observatory availability Can use single conductor cable, BU to Node – Cost savings BU requires a ground Controllability reduced –Switches cannot be remotely operated

Neptune Power Overview- 17 All rights reserved © 2003, Neptune Progress: Documentation Configuration Management Plan Configuration Management Plan Project Documentation Plan Requirements Document Deployment Vessel ICD Operations Concept Doc System Description Documents Verification Plan ICD Test Plan Reports and Minutes Power Project History PMACS Protection Converter NEPTUNE levelPower Subsystem level

Neptune Power Overview- 18 All rights reserved © 2003, Neptune Progress: Documentation All key documents started and on web site –Concept of Operations (Rev 5) –Test Plan (Initial) –Converter (3 files) –PMACS (17 files) –Assorted trade-offs –CoDR docs (37 files) Total number of files ~400