Base Case Basics Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

Reading a GE PSLF *.epc into PWS
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
January TSS J. Gronquist, S. Kincic
2014 Website Heather Rasmussen Communications Specialist W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung January 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Western Planning Regions Interregional (IR) Coordination Activities
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid.
Path Operator Task Force Report Joint Guidance Committee December 1, 2014.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Installation and Setup Doug Tucker Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning Coordinator Function Task Force Survey Results Doug Tucker Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Creating Profiles Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
Base Case Coordination System Report Philip Augustin – TSS Chair Nathan Powell – PCC Staff Liaison July 2015 Salt Lake City, UT W ESTERN E LECTRICITY C.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRWG Meeting 15-2 Power Plant Validation Tools Eric Bakie July 2015.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PSS/E RAW File Format for appending to case
Stability Analysis on WECC Systems with Wind Penetration and Composite Load Model Introduction The growing complexity of generation and load pattern in.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
Topology Comparison PowerWorld Users Tool Zach Gill Sanford Engineer, Energy Delivery May 21, 2014.
Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report for MIC Pete Heiman October 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
WECC Training Report January 26, 2016 Deveny Bywaters W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
North America Energy Standards Board Craig L. Williams, Specialist Ld.Sr. ISAS Meeting January 13, 2016 Phoenix, AZ W ESTERN E LECTRICITY C OORDINATING.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS & TEPPC Update CCTA Assumptions Vijay Satyal - RPCG Liaison, Sr. Policy Analyst & Colby Johnson - Associate Engineer, SAP W ESTERN E LECTRICITY.
2026 Common Case Development Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee ISAS Report Pete Heiman April 20, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. MIC Meeting March 23, 2016 La Jolla, CA W ESTERN E LECTRICITY C OORDINATING.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PowerWorld Case Validation
Nick Hatton Associate Staff Engineer
Progress Report for the May 26th 17:31 Event
Slaven Kincic SMVTF Progress Report
Eleanor Ewry Base Case Coordination Subgroup Chair
Load Model Data Tool Development Update
Software testing strategies 2
Base Case Build Process
Elena Melloni Associate Engineer
ADS and WPR Seed Case Background
Doug Tucker and Jon Jensen WECC Staff
Base Case Build Process
Topology Comparison PowerWorld Users Tool Zach Gill Sanford
ADS and WPR Seed Case Background
Jon Jensen Associate Staff Engineer
SRWG Meeting 15-2 Power Plant Validation Tools
Jonathan Young SDWG Chair
Jon Jensen Associate Staff Engineer
System Review Work Group Update to TSS
Presentation transcript:

Base Case Basics Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL

“People who work together will win, whether it be against complex football defenses, or the problems of modern society.” -Vince Lombardie “If everyone is moving forward together, then success takes care of itself.” -Henry Ford Purpose 2

From the WECC Staff: Doug Enoch Jon Nick Introductions W ESTERN E LECTRICITY C OORDINATING C OUNCIL 3

WECC Base Case Building Procedure Reporting Data Anomalies Discussion Outline W ESTERN E LECTRICITY C OORDINATING C OUNCIL 4

Base Case compilation Schedule CASEDATE DATA REQUEST MAILED DATE DATA DUE TO SUB COORD DATE L&R INFO DUE TO SUB COORD DATE DATA DUE TO AREA COORD DATE DATA DUE TO STAFF STAFF SEND CASE FOR REVIEW DATE COMMENTS DUE TO AREA COORD DATE AREA COORDINATOR COMMENTS DUE TO STAFF STAFF FINALIZE DATE 2015 HS4-OP07/18/1408/01/1408/08/1409/12/1409/26/1410/10/1410/17/1410/31/ LS1-OP07/18/1408/15/1408/22/1409/26/1410/10/1410/24/1410/31/1411/14/ HW109/12/1409/26/1410/03/1411/07/1411/21/1411/28/1412/05/1412/19/ HS110/17/1410/31/1411/07/1412/12/1412/26/1401/02/1501/09/1501/23/ HW3-OP11/21/1412/05/1412/12/1401/16/1501/30/1502/13/1502/20/1503/06/ LW1-OP11/21/1412/19/1412/26/1401/30/1502/13/1502/27/1503/06/1503/20/ HSP1-OP01/16/1501/30/1502/06/1503/13/1503/27/1504/10/1504/17/1505/01/ HW102/27/1503/13/1503/20/1504/24/1505/08/1505/15/1505/22/1506/05/ HS204/03/1504/17/1504/24/1505/29/1506/12/1506/19/1506/26/1507/10/ HS3-OP05/08/1505/22/1505/29/1507/03/1507/17/1507/24/1507/31/1508/14/ LS1-OP05/08/1506/05/1506/12/1507/17/1507/24/1507/31/1508/14/1508/28/ HS1-S07/03/1507/17/1507/24/1508/28/1509/11/1509/25/1510/02/1510/16/15 20XX-Regional08/07/1508/21/1508/28/1510/02/1510/16/1510/30/1511/06/1511/20/ HW109/11/1509/25/1510/02/1511/06/1511/20/1511/27/1512/04/1512/18/ HS110/16/1510/30/1511/06/1512/11/1512/25/1501/01/1601/08/1601/22/16 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

From each AC we should receive the following: 1.Area Specific power flow data 2.L&R spreadsheet 3.Any dynamic model changes/updates 4.Any tie line changes (must be coordinated!!!) 5.List of significant changes 6.Any additional info that will help with base case compilation Base Case Building Power flow W ESTERN E LECTRICITY C OORDINATING C OUNCIL 6

Creating a Raw Case W ESTERN E LECTRICITY C OORDINATING C OUNCIL 7

Contains raw data for the following: 1.Branches 2.Transformers 3.Line connected shunts 4.DC lines (Bus, Line, DCC) 5.Transformer impedance tables 6.Interface data (Paths) 7.Branch interface data 8.Zones 9.Owners 10.Area Interchange The Master Tie Line File W ESTERN E LECTRICITY C OORDINATING C OUNCIL 8

Tying It All Together W ESTERN E LECTRICITY C OORDINATING C OUNCIL 9

Area Interchange Schedules BC Hydro Interchange with Northwest 2300 MW Northwest Interchange with BC Hydro MW W ESTERN E LECTRICITY C OORDINATING C OUNCIL 10

Power Flow Solution and Data Checking Island check Tie line check Edit table checks – Mustfix.p – Checks.p – svdsnap.p – Pathmoni.p – Tappfixer.p – Dchk – Baseloader.p – InsertTurbine.p Overload check (Line & Path) Solution check – InsertLID.p – InsertGENID.p – FillRatingsPSSe.p – DCINTMT.p Replog – PowerWorld PTI Conversion W ESTERN E LECTRICITY C OORDINATING C OUNCIL 11

Questions About Power Flow Compilation? W ESTERN E LECTRICITY C OORDINATING C OUNCIL 12

The Master Dynamics File (MDF) 1.Models 2.Updates in PSLF format 3.Temporary vs. permanent changes 4.Motor load modeling 5.Condenser and pump check 6.Unused models 7.Composition load models Base Case Building - Dynamics W ESTERN E LECTRICITY C OORDINATING C OUNCIL 13

Reading in the MDF Missing data Duplicate models Modstat.p Built into PSLF 17.0 Initialization Governor errors/warnings Exciter errors Initializing Dynamics Data W ESTERN E LECTRICITY C OORDINATING C OUNCIL 14

Running and Plotting A no-disturbance run The alldyns.p disturbance routine – Ringdown – Double Palo Verde Outage – Loss of PDCI – Post-transient solution – Disturbances Metcalf-Moss landing, Tesla-Metcalf Comanche-Daniels Park Colorado River – Red Bluff Hells Canyon – Brownlee N-0 Overloads- Operating cases W ESTERN E LECTRICITY C OORDINATING C OUNCIL 15

Plotting Plotting the channel file 1.Searching for the largest deviation (spread) 2.Plotting parameters W ESTERN E LECTRICITY C OORDINATING C OUNCIL 16

Types Submitted in EPCL, EPC,.m, or by list MUST be made to review case Changes to tie lines must be coordinated Extensive data changes Base Case Building - Comments W ESTERN E LECTRICITY C OORDINATING C OUNCIL 17

Questions about Dynamics and Comment Submission? W ESTERN E LECTRICITY C OORDINATING C OUNCIL 18

Master Tie Line File Data Series Compensation New Phase Shifters Additional Solution Tools Any Area Substitution Data PSS Exemptions Dynamics Data Study Report Suggestions Reporting Data Anomalies W ESTERN E LECTRICITY C OORDINATING C OUNCIL 19

Questions W ESTERN E LECTRICITY C OORDINATING C OUNCIL Jon Jensen