Mock Logbook This mock logbook was produced at the request of internal verifiers at City of Westminster College. SCST felt it might be useful to publish.

Slides:



Advertisements
Similar presentations
IT KEY SKILLS LEVEL 1 Evidence required for: A poster or Word document.
Advertisements

Accounting and Finance Verification Group 266 Verification Feedback Session 2006/2007 Kim Tree Senior Verifier.
1 Developing Assignments using the assessment grid.
SVQ Management Networking Event March 2011 Verification Update.
Higher Int 2 NAB Questions. Question (higher only) Explain, in detail, how you used the knowledge you gained from studying both Key concepts/Key Features.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
..
ITQ qualification briefing 17 June 2010 Museum of London.
Entry Pathways Introduction to Science Today Brian Harris, Subject Officer Feb 2012.
MONITORING DIFFERENT TYPES OF TRIALS. BY OGUNDOKUN OLUSEGUN BIOMEDICAL SCIENTIST / CLINICAL RESEARCH PROFESSIONAL BMLS (LAUTECH), PGD (Clin. Research.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Business Management CPD Presentation External Verification School SQA Co-ordinators will receive notification of Verification Selection and Verification.
1 Recognition Assessment Questions Answered. 2 What is Recognition Assessment? It is not an exam or test. It looks at the candidate’s industry skills.
SVQ in Food & Drink Operations External Verification Report.
Preparing for appraisal: what’s changing ? Dr Paula Wright GP tutor for Newcastle East GP tutor for Sessional GPs Deanery Adviser on Retainer and FCS.
The ISO 9002 Quality Assurance Management System
CPD means adding to your professional knowledge and keeping your skills up to date throughout your career Professional knowledge is based on formal qualifications.
Computing Science CPD Presentation Internal Verification of National 4 and National 5 Units.
Communication Key Skills INSET. Outline of INSET training 1. A review of the standards for all levels of communication key skill 2. Examples of portfolios.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
© Copyright, The Joint Commission Advanced Certification in Heart Failure Measures Pilot Test Training Part II: Tuesday, November 15, 2011.
Unit B065 – Coding a solution PREP WORK 1)Make sure you keep a work log / diary. Use the table on page 16 of the hand book as a template 2)Keep a bibliography.
Providing Education and Training in the AGRI Sector Implications of the new proposals for quality provisioning.
SESSION 4 COLLECTING EVIDENCE OF LEARNER PERFORMANCE CAT AND IT.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
AO1 – Planning the Project  Unit 2: Collaborative Working.
Judith Wheeler, OCN Eastern Region Quality Reviewer Direct Claims Status Or, what do we need to see when undertaking a monitoring visit?
Satisfactory Completion of Dental Foundation Training (DFT) Pilot Programme 2015/16 Recommended Minimum Requirements September 2015.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Continuing Professional Development Navigating the RCOphth e- portfolio.
EARLY APPROVAL WHAT TO WORK ON THIS SUMMER. PORTFOLIO Get a 2-inch binder and a bunch of page protectors Put a placeholder for each required item in a.
BTEC Quality Assurance BTEC Foundation Level – Level 3 including Workskills The quality assurance includes three processes: Lead Internal Verifier.
Final Assessment Supervised Practice Stage 1 Assessment Stage 2 Assessment Scheme for Registration Timeline.
2015 Canadian Hypertension Education Program Recommendations
Application guidelines, Forms and evaluation criteria CBO Window Fannie Nthakomwa December 2015.
Personal Project Writing the Rough Draft. Evidence Check 4 Supervisors will sign off on your evidence check form once you submit your rough draft.
Specialist Associate CESR Evaluation Day
Certificate IV in Project Management Assessment Outline Course Number Qualification Code BSB41507.
Improve Own Learning and Performance. Progression from levels 1-3 Progression from levels 1-3 At all levels, candidates are required to show they can.
New Employability Qualifications - Briefing WebEx August 2015.
Foundation Programme Curriculum: Key Changes for 2016 David Kessel Chair AoMRC Foundation Programme Committee New Improved ?
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Internal Verification Presentation to Presentation by: Chris Blewitt Date 17 th Nov 2010.
Building and keeping a revalidation portfolio Building a repository of evidence for revalidation.
Training for organisations participating in Peer Review of Paediatric Diabetes.
18 Weeks Diagnostic Project RSCH Key features Demand and capacity work - + ongoing data Process mapping Workforce review Administration redesign Adjustments.
Objectives of the session
Producing the Perfect CoPE Folder Some helpful hints for students and staff.
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
National 4 & 5 Physical Education. Documents available on website Unit by Unit approach to Performance (package 1) Unit by Unit approach to Factors impacting.
Conditions & Treatments Conditions Treatments Our experts cardiologist diagnose and treat patients with coronary artery disease, heart failure, valve.
ePortfolio and curriculum
Assessment brief Post graduate route.
MAINPORT ePortfolio (Residency Prototype 1)
Systems Verification Update
GCE Applied ICT G053: Lesson 01 Introduction To The Unit
Introduction to Internal Audits
Introduction and Overview
MAINPORT ePortfolio (Residency Prototype 1)
Professional support guides
Matthew McCullagh Quality Manager. Matthew McCullagh Quality Manager.
The Assessment Process
Understanding Standards Physical Education Higher
The Early Help Assessment Journey. How to Assure a Quality Journey.
Quality Assurance in Clinical Trials
The Early Help Assessment Journey. How to Assure a Quality Journey.
Observations in Psychology
Read more STRIDE BP - Accurate BP Monitors
Nonconformity Writing
Matthew McCullagh Quality Manager. Matthew McCullagh Quality Manager.
Presentation transcript:

Mock Logbook This mock logbook was produced at the request of internal verifiers at City of Westminster College. SCST felt it might be useful to publish it on the website. It has been produced by Chris Burke with grateful thanks to Gretta Borthwick and Jo Nemes for their invaluable input.

Record of Clinical Practice How to put your RCP together I am grateful to Jo Nemes and Gretta Borthwick who contributed to this document

Record of Clinical Practice The RCP is presented to SCST in 2 parts: Part I is presented toward the end of year 2 of the programme Part II is presented toward the end of year 4 of the programme

Internal Verification This process provides the monitoring of quality of work-based assessment IVs visit a minimum of twice a year Any documentary evidence of these visits MUST be included in the logbook

Part I should contain: Resting ECG Spygmomanometry

Part II ETT Ambulatory ECG Ambulatory BP Cardiac Catheterisation Pacing Echo

RCP is in 2 sections Assessment logbook Evidence Portfolio

Assessment Logbook

This section contains the documentation of the work-based assessments

Part I

Life Support A copy of a current life support certificate This should be a minimum of intermediate life support If only basic life support is available an assessment of defibrillation technique must be included

CPR Certificate

OR

Assessment Plan

Performance Criteria

Q&A

Assessor Feedback

ECG Includes Prep equipment, prep patient and evaluate results

Prep equipment (ECG)

Assessment Plan

Performance Criteria

ECG

Q&A

Assessor Feedback

Prep patient (ECG)

Assessment Plan

Performance Criteria

ECG

Q&A

Assessor Feedback

Evaluate Results (ECG)

Assessment Plan

Performance Criteria

ECG

Q&A

Assessor Feedback

ECG 3 ECG assessments are carried out in the workplace. For EACH, the following documentation must be provided:

Assessment Plan

Performance Criteria

ECG (with report generated by student)

Q&A

Assessor Feedback

Sphygmomanometry 4 assessments of blood pressure measurements are completed. At least ONE must be manual For each assessment the following documentation must be provided:

Assessment Plan

Performance Criteria (measured value must be given)

Q&A

Assessor Feedback

Part II

Exercise Testing 4 assessments of ETT are completed For each assessment the following documentation must be provided:

Assessment Plan

Performance Criteria

Copy of final report including ECG medians

Q&A

Assessor Feedback

Ambulatory ECG (AECG) 4 assessments of AECG are completed. These are a mixture of continuous and events recorders which reflect the work of the department For each assessment the following documentation must be provided:

Assessment Plan

Performance Criteria

Copy of the report to include ECGs

Q&A

Assessor Feedback

Ambulatory BP (ABP) 4 assessments of ABP are completed. For each assessment the following documentation must be provided

Assessment Plan

Performance Criteria

Copy of printout with your report

Q&A

Assessor Feedback

Cardiac Catheterisation

Includes Prep equipment, prep patient and evaluate results

Prep equipment (Cath)

Assessment Plan

Performance Criteria

Q&A

Assessor Feedback

Prep patient (Cath)

Assessment Plan

Performance Criteria

Q&A

Assessor Feedback

Evaluate Results (Cath)

Assessment Plan

Performance Criteria

Copy of pressures recorded and measurements made

Q&A

Assessor Feedback

Cardiac Catheterisation 4 assessments of cardiac catheterisation are completed (where possible including a right and left study) For each assessment the following documentation must be provided:

Assessment Plan

Performance Criteria

Copy of pressures recorded and measurements made including manual corrections

Q&A

Assessor Feedback

Pacing Implant 4 assessments of pacing implant are completed. For each assessment the following documentation must be provided

Assessment Plan

Performance Criteria

Copy of implant sheet with ECGs (State type of device)

Q&A

Assessor Feedback

Pacemaker Follow-Up 4 assessments of pacemaker follow-Up are completed For each assessment the following documentation must be provided:

Assessment Plan

Performance Criteria

Copy of Follow-Up sheet, ECGs and programmed data (State type of device)

Q&A

Assessor Feedback

Echo 4 assessments of echo are completed. For each assessment the following documentation must be provided

Assessment Plan

Performance Criteria

Copy of echo report to include images preferably hard copy

Q&A

Assessor Feedback

Evidence Portfolio Evidence must be presented for EVERY investigation Patient ID must be removed from ALL evidence (all pages not just front sheet)

Resting ECG x150 Put ECG report on the left If possible make report sheet landscape so scrutineer can read report whilst looking at ECG Put ECG on the right

Ambulatory ECG x 30 Copy of a final report with ECG examples generated by you

Ambulatory BP Copy of printout and your report

ETT Copy of final report with ECG medians

Cardiac Catheterisation Copy of pressures and haemodynamics with measurements which have been checked by WBA

Pacemaker Implant Copy of implant sheet plus relevant tracings

Pacemaker Follow-Up Copy of follow-up sheet plus relevant programming details and ECGs

Echo Final echo report with example images (Preferably hard copy)