04/02/2004 - FH Plans for 2005 PH-DT1-GS. 04/02/2004 - FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.

Slides:



Advertisements
Similar presentations
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Technical Support Activities in PH-ADO-PO
The RPC Closed loop Gas System Slides from Bianco and Guida.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Section Meeting News and MARS 22/01/ FH1. General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider.
ELENA installation progress F. Butin / ELENA collaboration.
Alice TOF Production Readiness Review Gas Control Systems.
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
Gas Schedules
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
CMS gas systems meeting
SPS cryogenic proximity equipment and SM18 validation
Current Status Future Progress Monitoring
Status of the cryogenic system for B180
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

04/02/ FH Plans for 2005 PH-DT1-GS

04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea d’Auria, Patrick Carrie, Daniel Fromm, Steven Pavis, Albin Wasem, Sylvain de Boissieu Frederic Merlet FSU: Aygun Aydin, Vincent Darras, Leon Muller, Herminio Rama, A. Sari. Protvino Team: Andre Kiver, Vladimir Kosenko, Anatoli Kapitchinkov, and since 2 days: Alexander Provotorov, Irina Smotrova On Behalf of

Overview Achievements / short flashback on 2004 Update Resource Situation Overview Construction Schedule Detailed Plans for 2005 Installation Schedule (as shown in Nov. 04) Forecast on Expenses for 2005 Next Steering Meeting

Flashback 2004 Mixer Module is nearly finished; 3 months delay bco Pressure Regulator; finished end of April. Pump Racks construction is ongoing (60-70% completed); finished by June (up to schedule). ATLAS Distribution; altogether 30 Racks, construction is ongoing (60-70% completed) (up to ATLAS Schedule) TPC debugging finished; installation at point 5 is ongoing (see Stefan’s talk)

Summary was a year with important progress for the construction of the gas systems. Work flow has considerably increased compared to previous years. (Component cleaning and analysis processes have improved a lot.) Internal Organization –FSU unit defined and installed. Major changes for work organization and for the team leader. –Protvino Team increased from 1 to 3 persons. –Quality control has become systematic and the results are encouraging. New cleaning facility Bldg. Xxx is operational since one month.

Developmental areas QC of modules after construction and cabling. Plan: use MTF database for Workflow (QC) and later for maintenance. Difficulties to handle the huge workflow in the lab. (number of components, number of racks in parallel,…) (We will be still at the critical load for the next 12 months.) Calibration of flow cells was too slow, but going fine now. Though, debugging and tuning is still taking a lot of time.

Present Resource Situation 1.Construction and Installation Manpower PROTVINO team 5 people FSU 5 people 2.Lab Space: –Labs in Bldg’s 155 and 167 are operational –New Lab in Bldg. 216 will be ready end of March. Pipe workerCabler (Since yesterday) The department has given high priority and SMI group has worked very fast

Work Plan Overview Construction Installation Commissioning Main serial construction should end autumn 2006 ALICE TPC Pilot commissioning multi channel system Main commissioning phase Installation block for block

Objectives 2005 Finnish Mixer Module: by April Finnish Pump –Mechanics by April/Mai –Chassis and Cabling around June Humidifier Module –New module 2 racks to built. –Chassis and Controls covered by Xavier. Exhaust Module start by April ATLAS ID Flushing systems (finish < November) Rack Construction (1)

Objectives 2005 Distribution: –ATLAS (Muon) finish all racks < May. Including calibrated flowcells –ATLAS TRT Distribution (deliver Racks < July) –Build ALICE and LHCb during second half of Rack Construction (2) Target: Finish all distribution racks by the end of 2005

Objectives 2005 We would like to make a number of control chassis, i.e. Pump, Exhaust, Humidifier, Purifier, CC-Module. (to be produced outside) The Hardware Modules made in 2005 need to be cabled: Distribution, Pump, Exhaust, Humidifier. The Distribution read-out: –Large scale test of ELMB’s, Webmass (new interface to CAN bus) The cabling layouts for the experimental sites have to be made and communicated to the experiments. Electrical Control Chassis and Cabling … and this starts toady, see talk of Steven

Overview Construction Schedule New Advanced …still to come Delayed

Installation Phase (1) (Managed by Mar Capeans) A new phase with new difficulties: –Safety requirements (work permits, equipment, etc.) –Need more tools and equipment that stay on-site. –Rationalize work organisation bco. distance to the sites; –Need a 2 nd car for the Section. Propose: cost sharing 700 CHF/y/experiment. Note: currently we can effort to work only on one site at a time.

Installation Phase (2) Installation should be organized by Zones: –ALICE TPC is pilot installation –Generally UX caverns come first, rack connections of multi channel systems are handled by piping contracts of the experiments. (example CMS) –SG and US areas: should be installed as complete areas where possible Plan: Start with ALICE TPC then may be CMS SG –Apart from some exceptions commissioning of closed loop systems will be done in –Flushing of Open circuits can be possible before.

Proposal Installation Planning (1) ATLAS: UX racks in time in 2005 Main Commiss. in 2007 CMS : UX racks are done Do SG in 2005 Closed Loop Commissioning As shown in November 2004

Proposal Installation Planning (2) ALICE: TPC in commis. early 2005 Single Pass Syst.’s Mid TRD, TOF in 2007 LHCb: Muon and OT Distribution early 2006 RICH’s pending TRD As shown in November 2004

Installation Schedule The schedule is not rock solid, adjustments and corrections to optimize the work flow will be necessary. Arbitration must be done in the Steering Meeting

Steering Meeting / 6 months Providing: Full status report on the project Cost review Schedule review Status of production rate. Next Meeting: Date to be scheduled ( June 2005 ? )

Forecast for Expenses in 2005 ATLAS [kCHF] CMS [kCHF] ALICE [kCHF] LHCb [kCHF] Materials (+TRD) 266 Manpower Total Period: March 2005 to Dec. 2005