Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
September 12, 2011 Global Design Effort 1 ILC Damping Ring Activities Cornell Group Mark Palmer GDE.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
John Carwardine Editing updates, pdf build for top-level editing LCWS session on TDR 1 TEB Webex: 8 th October Global Design Effort John Carwardine.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
September 20, 2005Margaret Votava1 ILC Controls Planning.
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
DCB Activities still many drafts, successive approximations Peter H. Garbincius January 20, 2006 – KEK DCB_KEK_ ppt.
19july06 - Vancouver L.C. Workshop - DCB (PHG) Global Design Effort 1 Report from the Design & Cost Board Peter H. Garbincius* on behalf of: Wilhelm Bialowons*,
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
Management Items – (John) EC comments on TDR snapshot (Brian) Editing status reports (Editors) Other items, wrap-up 1 TEB webex meeting, 6 Aug 2012 Global.
Agenda items TEB activities at KILC TDR SVN repository roll-out
Oct 22 Group Leaders Planning meeting
The ILC Control Work Packages
EDR HLRF Work Packages Draft Summary
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Technical Design Report preparation
Accelerator Physics Technical System Group Review
Curriculum Forms Guidelines and Information
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items

Controls & LLRF 2 Miscellaneous items Cost reduction exercise by DCB. ILC Americas FY08/09 planning. Reference Design Report writing RDR Costing deliverables for Valencia. Breakout sessions at Valencia.

Controls & LLRF 3 Americas Region FY08/09 planning First FY08/09 planning meeting was held at SLAC last week –Slides available on Indico. WBS x.2 Global Systems (Carwardine, Larsen) –Operations & Reliability, Global Controls, Instrumentation & Feedback, Installation, Alignment, LLRF. Initial stage to be completed by Oct 18/19 for submission to DOE –Develop plan for Americas region that covers: TDR, R&D, Facilities. –Connect with global activities. –Connect with universities programs.

Controls & LLRF 4 Reference Design Report Next deliverable due early Oct (sub-section authors): –Develop expanded outline for each subsection. –Create a draft list of figures to be included. Candidate sub-section authors and section editors have been identified, but not all have been contacted.

Controls & LLRF 5 RDR Costing exercise deliverables We have received no new instructions from GDE or DCB, but there is work to be done to develop a stand-alone costing package. This should be cleanup and consolidation. I do not anticipate being asked for any substantially new material or for significant revisions –Identify any missing elements or supporting information. –Develop WBS dictionary elements. –Assumptions, methodology, and supporting material. –Documented comparisons with other facilities (NLC, SNS, etc).

Controls & LLRF 6 Breakout sessions at Valencia? I would like to explore the possibility of breakout sessions at Valencia that would focus on R&D in the Global Systems areas, eg –High Availability tools, techniques, applications: Simulations, controls hardware, software, instrumentation, kickers, DIL, power supplies etc –RF phase distribution. –Low Level RF. Benchmark ILC needs relative to the state of the art. Create/update lists of R&D topics and work packages.