ANSI/NIRMA Standard CM 1.0 Status Update

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

INPO Update CMBG Meeting June 2013
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
A Brief History of CM in the Nuclear Industry and the CMBG
1. 2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Configuration Management
GTM for Product Leaders Project Overview A project that guides product leaders and their teams in developing a successful go-to-market strategy.
Defense Nuclear Facilities Safety Board
1 ANSI/NIRMA Standard CM 1.0 – 2007 Update Presented By: Rich Giska NIRMA ANSI Coordinator.
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
Configuration Management Publications at IAEA
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
1 Digital I&C Systems Configuration Management Presented By: David E Woods Senior Engineer – Electrical/I&C Design Engineering June 21, 2011.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
IAEA - Department of Nuclear Safety & Security
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Georgia Institute of Technology CS 4320 Fall 2003.
PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
1 Configuration Management Publications at IAEA Presented By: Kent Freeland WorleyParsons.
NIMSL Nuclear Information Management Strategic Leadership Community of Practice.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
A Brief History of CM in the Nuclear Industry and the CMBG Presented By: John Parler CMBG Steering Committee June 25, 2012 Chicago, Illinois.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
2007 CMBG Conference A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Rick Harris CMBG Steering Committee June 17-20, 2007 Charleston,
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Implementing Program Management Standards at Duke Energy.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Software Project Configuration Management
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Software Configuration Management
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
A Brief History of CM in the Nuclear Industry and the CMBG
Presented By: Mike Stout – PPL Glenn Neises - INPO
NRC Cyber Security Regulatory Overview
How to Manage Guidance from Multiple Organizations into CM
BREAKOUT 4: Vendor Technical Information
A Brief History of CM in the Nuclear Industry and the CMBG
DOE and NRC Regulated CM - A Comparison
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Vendor Technical Information
I&C requirements and configuration management
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Presentation transcript:

ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2015 Glendale AZ June 8, 2015

Evolution of ANSI/NIRMA Standard Industry Historical Events: SSFIs Millstone Event Response to Industry-Recognized Issues History of ANSI/NIRMA Standard Position Papers NIRMA TG-19 ANSI Standard Current Status Next Steps CMBG 2015 ANSI/NIRMA Standard –Status Update

Industry Historical Events Safety System Functional Inspections (SSFIs): In mid-1980s, NRC initiated SSFIs at operating nuclear power plants Basic objective of SSFIs was to ensure Licensee could produce documentation that: Represented the ‘as-built’ facility Verified the facility was within the authorized design basis Support the ability to maintain the plant Demonstrated proper controls are applied for facility changes Millstone Shutdown NRC’s 10CFR50.54(f) letter issued with major focus on CM Triggered industry initiatives on CM CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA Standard –Status Update Industry Reactions NRC required Licensees provide evidence that plants were within their design and licensing bases Utilities committed to reconstituting their design basis for operating units, i.e., Design Basis Reconstitution New plants under construction also committed to developing design basis documentation CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA Standard –Status Update Industry Reactions NUMARC Task Force published guidance for Design Basis Reconstitution (NUMARC 90-02) NRC issued NUREG/CR 5147 on CM Program attributes Design Basis Reconstitution initiatives were launched with expenditures in the $100s of Millions of Dollars…! CMBG 2015 ANSI/NIRMA Standard –Status Update

NIRMA’s Assessment & Direction NIRMA noted that non-adherence to design change control requirements identified in ANSI N42.11 (QA for Design Control) was a major cause of design basis issues BUT that was not CM… Proposed that key underlying issues were ineffective processes, information management and integration of information flows in processes across the entire plant organization Suggested overall issue was absence of Configuration Management Programs which complimented design and document control NIRMA Configuration Management Committee (CMC) was formed in 1987 to focus on the issues and develop guidance materials for establishing effective CM Programs CMBG 2015 ANSI/NIRMA Standard –Status Update

CM Guidance History NIRMA PP-02 TG-19 ANSI/NIRMA Std. CMBG 1987 1989 1993 1994 1996 2000 2007 2012 2015 NIRMA Configuration Management Committee Rev. 0 1989 Rev. 1 1994 PP-02 Rev. 0 1996 TG-19 CM 1.0 2000 CM 1.0 2007 ANSI/NIRMA Std. CMBG Configuration Management Benchmarking Group CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA CM Standard - Status ANSI requires maintenance of Standards on a 5-year cycle 2007 revision was assessed regarding needed updates: CMBG agreed no updates were required at this time Any issues going forward would be addressed in later revision EPRI & NIRMA agreed new build guidance in ERPI Technical Report was adequate for now NIRMA decision was to reaffirm 2007 revision: Initially planned for 2013 Administrative issues pushed out the Reaffirmation process until 2015 ANSI Reaffirmation process status: Completed in May 2015 with 100% approval for Reaffirmation Documentation being submitted to ANSI for formal approval ANSI/NIRMA CM 1.0 – 2007 expected to be reissued as Reaffirmed Standard in fall 2015 CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA CM Standard - Going Forward Industry inputs for updates to the 2007 version will be collected over next couple of years for the next revision Inputs have been collected from some of the Consensus Body members that voted on the Reaffirmation A major effort will begin during this CMBG conference: Breakout Session Monday afternoon will be an open forum for identifying issues to be considered for the next revision A CMBG Task Group will be formed to pursue the task of developing recommendations for the next revision of CM 1.0 The CMBG Task Group will have an initial formation and logistics session on Wednesday morning CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA CM Standard – Key Topics Several key topics to be addressed for the next revision, e.g.: Enterprise risk based on INPO IER LI-14-20 Address nuclear plants that do not necessarily produce power CM requirements/data diagram for requirements, SSCs and FCI 5 models: equilibrium, CM process, margin model, functional area model, and requirement/data model 5 Functional Areas from IAEA Safety Report No. 65: Protect Design Basis, Modify Plant, Operate Plant, Maintain Plant, Test Plant Expansion of margin management discussion Address new plant pre-operational CM topics, e.g.: Design Authority -- controlled / shared on new nuclear builds Margin Information for new nuclear builds CM Information CMBG 2015 ANSI/NIRMA Standard –Status Update

Thank You…! Rich Giska rich_giska@hotmail.com CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA Standard –Status Update Support Materials CMBG 2015 ANSI/NIRMA Standard –Status Update

NIRMA Position Paper on CM CMC focused on a Position Paper on CM for nuclear plants: Engaged experienced multi-disciplined team including: Engineering, Design, Quality Assurance, Procurement Operations, IT, Document Control & Records Management Took holistic approach to CM, i.e., beyond design and design basis Focused on information management and business processes governing changes of all types & managing related information flows Applied CM Standards and associated principles used in Dept. of Defense to nuclear plants, i.e. – baseline, change control, status accounting and verification/validation (or audit) Translated these principles to core elements of a CM Program NIRMA Position Paper PP-02, Rev. 0 was issued in 1989 CMBG 2013 ANSI/NIRMA Standard –Status Update

Continued CM-Related Efforts Identified need for business process improvements: Interfaces of multiple processes not well-defined Isolated processes were used to achieve specific tasks Focused on multiple ways changes could be implemented and ability to perform true impact analyses for each type of change Developed Position Paper PP-03 on CM Enhancement Programs Recognized information management not an industry strength and had limited importance by management in many operating plants: Multiple islands of data existed in individual silos – “My Data” After plant changes, not all duplicated instances of data were updated Developed Position Paper PP-04 on Configuration Management Information Systems CMBG 2015 ANSI/NIRMA Standard –Status Update

Coordination with DOE on CM DOE developed CM Program guidance and directives in DOE Order 1073 issued in 1993: Adopted many of the core elements and principles in NIRMA PP-02 Expanded to provide detailed guidance for DOE facilities NIRMA CMC and DOE collaborated to incorporate applicable guidance from DOE Order 1073 into PP-02 NIRMA PP-02, Rev. 1 was issued in 1994 NIRMA and DOE also collaborated on development of NIRMA TG- 19 which was the foundation document for the ANSI/NIRMA Standard CM 1.0 CMBG 2015 ANSI/NIRMA Standard –Status Update

Events Driving CM Program Progress 1994 – CM Practitioners hosted by PP&L: Discussed current CM issues and practices NIRMA, as an approved ANSI Standards Developer, suggested an industry standard on CM should be considered 1995 – CMBG established 1996 – Millstone Shutdown: NRC’s 10CFR50.54(f) letter issued with major focus on CM Triggered industry initiatives on CM 1996 – NIRMA engaged with CMBG to pursue industry standard: Developed NIRMA Technical Guideline TG-19 1996 Birth of the 3-Ball Model…! CMBG 2015 ANSI/NIRMA Standard –Status Update

ANSI/NIRMA Standard History 1988- NIRMA certified as an ANSI Approved Standard Developer 1998 - NIRMA TG-19 was used as the base document for development of the desired ANSI industry standard 2000 – ANSI/NIRMA Standard CM 1.0 issued 2005 – INPO AP-929 - Configuration Management Process Description: CMBG requested revisions Wanted consistency with ANSI/NIRMA Standard CM 1.0 INPO issued Rev. 1 2007 – ANSI/NIRMA Standard CM 1.0 revised to incorporate CM Process Model and Equilibrium Restoration CMBG 2015 ANSI/NIRMA Standard –Status Update

CM for New Nuclear Plant Projects New nuclear plant projects have unique CM issues that don’t exist for operating units today, e.g.: 10CFR52 licensing process & issuance of combined operating license (COL) CM expected to be implemented during the construction phase of a project Focus of ANSI/NIRMA Standard is on operating plants CMBG 2015 ANSI/NIRMA Standard –Status Update

CM for New Nuclear Plant Projects EPRI addressed CM for New Nuclear Plant Projects: EPRI Technical Report 1022684, April 2011 – “Elements of Pre-Operational and Operational Configuration Management for a New Nuclear Facility” Guidance addresses all aspects of CM: Emphasizes need to address CM early and establish roles and responsibilities Focus on Licensee’s CM obligations, expectations of EPC and information flows during multiple phases of a project CMBG 2015 ANSI/NIRMA Standard –Status Update

CMBG Inputs and Support Steering Committee has agreed topics for consideration of new content of ANSI/NIRMA Standard will be requested of CMBG members and addressed by Task Teams: Breakout sessions at CMBG Conferences to be leveraged for inputs Issues will be defined & research conducted by Teams Recommendations provided to NIRMA for next update CMBG was a voting member for all ANSI/NIRMA balloting : ANSI requires voting from diversified “interest categories” Process is required to achieve the industry consensus for standards CMBG represents “Industry Interest Group” category Inputs from CMBG members to start in Breakout session today! CMBG 2015 ANSI/NIRMA Standard –Status Update