FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.

Slides:



Advertisements
Similar presentations
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Advertisements

THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
THEMIS Mission CDR -UCB, June 14-18, 2004 Search Coil Magnetometer (SCM) MCDR Alain Roux, CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte*
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
FIELDS Fabrication Review Board FRB SearchCoil Magnetometer SENSOR S/N 4 Ferrite cores cracks P. LEROY 1MMS SCM FRB, 20 APR 2012.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
GLAST Large Area Telescope:
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
SPF MAG Quarterly Report – Feb 2015
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS Solid State Telescope Instrument (SST)
THEMIS FM4/FM5 INSTRUMENT SUITE
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
GLAST Large Area Telescope
Presentation transcript:

FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of California - Berkeley

FM4/FM5 PSRSCM - 2UCB, May 5 th, 2006 Personnel and Flight Hardware Status SCM End-Item Data Package Folder #21: FM1 SCM Harness Folder (SN02) Folder #22: FM1 SCM Folder (SN04) SCM Changes since FM2/FM3 PSR None PFRs SCM Backup Slides Environmental Qualification, Acceptance and Performance Test Summary Overview

FM4/FM5 PSRSCM - 3UCB, May 5 th, 2006 SCM Status Personnel and Hardware Status Centre d’etudes des Environnements Terrestre et Planetaires (CETP) –Bertrand De la Porte –Alain Roux –O. Le Contel –Abdel Bouabdellah –Christophe Coillot –Dominique Alison –Sebastien Ruocco Flight Hardware Status –6 Flight Units of SCM Sensor (SCM-SC) and SCM Pre-Amp Electronics (SCM-PA) have been delivered to UCB –Design verification through IDPU system occurs periodically during Instrument Suite Comprehensive Performance Tests. SCM sensor is in quiet magnetic environment in THEMIS Mu Metal Can for these tests.

FM4/FM5 PSRSCM - 4UCB, May 5 th, 2006 Folder #22: SCM FM1 Folder (SC-SN1, PA-SN1) Table of Contents Environmental Test Reports THEMIS SCM-SC Vibration Test Data THEMIS SCM-PA Vibration Test Data THEMIS SCM-SC Thermal Test Data and Log THM-SCM-TST-13 SCM-SC Vibration Test Report THM-SCM-TST-11 SCM-PA Vibration Test Report THM-SCM-TST-14 SCM-SC Thermal Test Report THM-SCM-TST-12 SCM-PA Thermal Test Report Acceptance Data Package Table of Contents: Shipping Documents, Handling and Operations, Qualification Status, Non-Conformance Reports (NCRs), Historical Record, Test Reports, Physical Measurements (mass properties) Note: SCM-PA was delivered with no NCRs Calibration Reports THM-SCM-TST-15 THEMIS SCM Full Calibration Test Report Provides measurement of Transfer Function, Gain, Phase, Sensitivity and exact orientations of magnetic sensor as obtained at Chambon-la-Floret Calibration Facility End-Item Data Package

FM4/FM5 PSRSCM - 5UCB, May 5 th, 2006 Folder #21: SCM Harness Folder (SN02) Table of Contents Harness Diagram THM_SCM_HRN_001 Rev C Assembly Report Jackson and Tull Certification Log (continuation sheet, problem records, work order table, tool and equipment usage record, certification of conformance, crimp tool tensile test records) Inspection Harness continuity test Rework/Repair Reports None Notes & Pictures End-Item Data Package

FM4/FM5 PSRSCM - 6UCB, May 5 th, 2006 PFRs There are no open PFRs on the SCM for any unit.

FM4/FM5 PSRSCM - 7UCB, May 5 th, 2006 BACK-UP:

FM4/FM5 PSRSCM - 8UCB, May 5 th, 2006 ItemModelTest typeQ/A level Report referenceResult SCM- PA EM (ETU) Functional Vibrations Thermal Physical QQQQQQQQ Covered by Thermal Test THM-SCM-PA-TST-01 THM-SCM-PA-TST-02 THM-SCM-PA-TST-03 Success SCM- Pre-Amplifier QUALIFICATION The design of the PA has been qualified with the ETU Model (EM) In addition, the SCM-PA has been tested in Thermal Vacuum, mounted on the IDPU ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THE EM THM-SCM-ADP-0a section 06

FM4/FM5 PSRSCM - 9UCB, May 5 th, 2006 ItemModelTest typeQ/A level Report referenceResult SCM- SC EM (ETU) Functional / Calibration Vibrations Thermal Physical Thermal Potting only QQQQQQQQQQ THM-SCM-SC-TST-05 THM-SCM-CAL-EM1.0 THM-SCM-SC-TST-06 THM-SCM-SC-TST-07 THM-SCM-SC-TST-08 THM-SCM-SC-TST-09 Success Success (*) Success SCM- Search Coil QUALIFICATION The design of the SC has been qualified with the ETU Model (EM) ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THE EM THM-SCM-ADP-0b section 06 (*) in this test, only the functional properties of the Sensor were validated in thermal. A few cracks being observed in the external potting, the design of the potting was modified and qualified in the test TST-09

FM4/FM5 PSRSCM - 10UCB, May 5 th, 2006 ItemModelTest typeQ/A level Report referenceResult SCM- PA F1-F6Functional Vibrations Thermal Physical AAAAAAAA Covered by Thermal Test THM-SCM-PA-TST-11 THM-SCM-PA-TST-12 THM-SCM-PA-TST-03 EM measurements, not repeated with FMs Success See EM ACCEPTANCE TESTS of SCM - Pre-Amplifier The PA, Model F1, has been tested at Acceptance level In addition, the SCM-PA has been tested in Thermal Vacuum, mounted on the IDPU ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THE FM UNITS THM-SCM-ADP-1a

FM4/FM5 PSRSCM - 11UCB, May 5 th, 2006 ItemModelTest typeQ/A level Report referenceResult SCM- SC F1-F6Functional / Calibration Vibrations Thermal Vac Physical AAAAAA THM-SCM-SC-TST- 15 THM-SCM-SC-TST-13 THM-SCM-SC-TST-14 THM-SCM-SC-TST-08 EM measurements, not repeated with FMs Success See EM ACCEPTANCE TESTS of SCM- Search Coil The SC, model F1, has been tested at Acceptance level ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH FM UNITS THM-SCM-ADP-1b

FM4/FM5 PSRSCM - 12UCB, May 5 th, 2006 ItemTestlevelspecification PA/SCVibration Sine Vibration Random Vibration Sine Vibration Random QQAAQQAA According to SAI-STM Qualification According to SAI-STM-2510 – Qualification According to SAI-STM Acceptance According to SAI-STM Acceptance PA SC PA SC Thermal Thermal Vacuum QQAAQQAA 3 cycles; 4 h/step; -45, +60 °C 6 cycles; 4 h/step; -100, +80 °C 3 cycles; 4 h/step; -45, +55 °C 2 cycles; 4 h/step; -70, +45 °C CalibrationQ/AAccording to the scientific requirements THM TESTS SPECIFICATIONS

FM4/FM5 PSRSCM - 13UCB, May 5 th, 2006 THEMIS SCM SCHEDULE ItemModelDelivery DateDelivery Status SCM (SC-PA & Harness) ETU : PA ETU : SC FM1 FM2 FM3 FM4 FM5 Spare Model August 04, 2004 November 24, 2005 January 01, 2005 March 22, 2005 April 04, 2005 May 2005 Delivered

FM4/FM5 PSRSCM - 14UCB, May 5 th, 2006 SC Vibration test

FM4/FM5 PSRSCM - 15UCB, May 5 th, 2006 SC Thermal vacuum test

FM4/FM5 PSRSCM - 16UCB, May 5 th, 2006 PA Vibration test

FM4/FM5 PSRSCM - 17UCB, May 5 th, 2006 PA Thermal test