1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Mechanical Engineering Issues Sushil Sharma, NSLS-II Project The NSLS-II storage ring requires multipoles and.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Alignment and Beam Stability
SR Vacuum Systems and Front Ends
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors United States Particle Accelerator School – Accelerator Fundamentals.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Two-beam module layout
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Workshop on Tau-Charm at High Luminosity
Integration issues at IHEP
Coupling Correction at the Australian Synchrotron
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Additional Upstream Coil Shielding
LCLS Undulator System Status and Schedule
Extraction Michael Bevins May 17, 2007
SNS PPU Cryomodule Vacuum Vessel
LCLS Undulator System Status and Schedule
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will be a 3-GeV 792-meter circumference 3 rd generation synchrotron radiation facility with ultra low emittance and extremely high brightness. There will be a total of 90 multipole storage ring girder assemblies including machined girder weldments, vacuum chambers, multipole magnets and various pieces of ancillary equipment. A major effort was made to eliminate interferences between components and assure adequate assembly procedures. Topics that will be presented include considerations for designing, interfacing and potential interferences in the development and manufacture of storage ring multipole girder assemblies. Software requirements for the design of large assemblies will be presented along with requirements for access to various components after installation. Alignment requirements and the required fixturing for magnets and vacuum chambers took a significant effort and must be integrated into the overall design of a girder system. These topics will be described in detail. *Work performed under auspices of the United States Department of Energy, under contract DE-AC02-98CH10886

2 BROOKHAVEN SCIENCE ASSOCIATES Magnet and Girder Integration L. Doom Magnet Workshop April 11-12, 2012

3 BROOKHAVEN SCIENCE ASSOCIATES Outline Overview Designing, interfacing and interferences What components will need access later Wiring and utility connections Measuring and adjusting General comments

4 BROOKHAVEN SCIENCE ASSOCIATES Girder Assembly Overview All Primary Girder assemblies are modeled in detail Major assemblies include Girders (150 total required) Magnets (60 Dipoles, 300 Quadrupoles, 270 Sextupoles, 180 Correctors) 210 Vacuum chamber assemblies (150 large aluminum chambers, 30 small aluminum chambers, 30 inconel chambers) Diagnostics (370 vacuum chamber mounted buttons) Water manifolds and connections Electrical enclosures and raceways Girder 4 (30 Required) Girder 2 (30 Required) Girder 6 (30 Required) Dipole Girder (60 required)

5 BROOKHAVEN SCIENCE ASSOCIATES Assembly Specifications 5 Multipole magnet alignment requirements Vertical ±30 microns Transverse: ±30 microns Longitudinal: ±500 microns Roll: ±.5 mrad Pitch: ±1.0 mrad Yaw: ±1.0 mrad Multipole magnet alignment at NSLS-II is done in two stages Preliminary alignment with laser tracker Final alignment with vibrating wire inside temperature controlled room Required specifications should be defined as early as possible along with expected procedure.

6 BROOKHAVEN SCIENCE ASSOCIATES Software Use software to identify interferences between parts Use models that are as accurate as possible Involve all groups in interface and interference checks. Regular meetings and reviews as primary design work is being done. This can take a significant amount of time and should be planned for Use software that can handle very large assemblies – Multipole girder assembly is 8127 files. Dipole assembly is 1666 files – Cell assembly is about 30,000 files – Pentant is about 180,000 files – Storage ring is about 900,000 files – Inventor’s usable limit at about 10,000 files – Navisworks is used at NSLS-II for very large assemblies but is primarily for viewing and has limited interactivity

7 BROOKHAVEN SCIENCE ASSOCIATES Lattice -Make sure Lattice is defined using adequate spacing between magnets -Lattice must include real sizes of components (not just points on a spreadsheet.) Coils and Plumbing may extend beyond expectations

8 BROOKHAVEN SCIENCE ASSOCIATES Lattice As the design develops show real sizes and spacing

9 BROOKHAVEN SCIENCE ASSOCIATES Lattice All components must be shown and evaluated to eliminate interference. Review by all Groups as design progresses

10 BROOKHAVEN SCIENCE ASSOCIATES Splitting Magnets If splitting magnets will be required make sure they are designed to do this easily and test. Splitting water lines at the center would simplify process Water manifold removed Unsupported conductors

11 BROOKHAVEN SCIENCE ASSOCIATES Interfaces Magnet Mounts Make sure there is more adjustment available than required Measuring instruments Fixtures for Vacuum Chambers and Magnets Original configuration Final configuration

12 BROOKHAVEN SCIENCE ASSOCIATES Interfaces Survey Access and Visibility Access in the tunnel will be limited

13 BROOKHAVEN SCIENCE ASSOCIATES Interfaces Ion Pumps (move with expansion of bakeout) Vacuum Chamber Stands Expansion during bakeout (expect over 6mm with aluminum chambers) Vacuum Chambers (2mm is minimum 3mm would be better) Leave more room for coils (4mm)

14 BROOKHAVEN SCIENCE ASSOCIATES Interfaces BPMs Room is need for installation, Survey and wiring Water Connections Water flow requirements and pressure drop across magnets must be clearly specified and understood by the suppliers (All suppliers failed to meet this specification)

15 BROOKHAVEN SCIENCE ASSOCIATES Interfaces Bakeout

16 BROOKHAVEN SCIENCE ASSOCIATES SPECIAL WIDE MAGNETS The beam eventually has to get out If wide magnets are made they should be manufactured from the same vender as standard width magnets Confirm exit requirements as early as possible and lock it in STONE (before magnets are designed) Girder 2 Girder 4

17 BROOKHAVEN SCIENCE ASSOCIATES What components will need access later BPMs Ion pumps Flanges and Bellows Vacuum chamber stands Bake-out heaters and instrumentation Corrector magnets slide out for access to bellows Water connections

18 BROOKHAVEN SCIENCE ASSOCIATES Wiring and Utility Connections Power wires Make sure hardware sizes and spacing are clearly identified and standardized Guards Make sure the requirements are clearly understood Water connections Water connection sizes should be relative to the flow requirements. They may be smaller than you think Ground wires and routing

19 BROOKHAVEN SCIENCE ASSOCIATES Measuring and adjusting Leaves access for instruments and hardware Make room for wrenches Push on center for alignment Vertical, Transverse and longitudinal adjustment and fixtures

20 BROOKHAVEN SCIENCE ASSOCIATES General comments There is more to a magnet than harmonics You learn a lot the first time an assembly is put together. – If prototypes are purchased purchase at least a full girder compliment to test all concepts (assembly procedures, measuring equipment, fixtures, alignment, vibration, wiring and plumbing, survey, …) Safety factors should be applied to specifications because some wont be met. Add enough clearances between parts (the boundary's will be pushed)

21 BROOKHAVEN SCIENCE ASSOCIATES It takes a good team Mechanical Assembly and inspection Electrical measurement and inspection