© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin.

Slides:



Advertisements
Similar presentations
Beyond Spectral and Spatial data: Exploring other domains of information GEOG3010 Remote Sensing and Image Processing Lewis RSU.
Advertisements

GERB SW fluxes: an update (Clear ocean SW radiances and fluxes in the reprocessed V999 June 04 data) Cédric Bertrand GIST th December, Imperial.
GERB Operations: Status Report J. Rufus GIST 26 Coseners House, RAL. 3 rd May 2007 © Imperial College London.
Clouds and the Earth’s Radiant Energy System NASA Langley Research Center / Atmospheric Sciences Methodology to compare GERB- CERES filtered radiances.
Calibration commissioning 16/01/2003: Extended ‘Normal mode’ 282 columns 22/01/2003: TOTAL forward and reverse scans ~11:00-12:15 23/01/2003:Earth stare.
ASIC3 WorkshopLandsdowne, VA May 16-18, 2006 J. Harder Page 1 Calibration Status of the Solar Irradiance Monitor (SIM) : The Present and the Future Jerald.
CERES-GERB Joint Science Teams The Geostationary Earth Radiation Budget (GERB) experiment GERB Status Imperial College London J E Harries (GERB.
Plans for interim data release J E Russell (Imperial)
October 29-30, 2001MEIDEX - Crew Tutorial - Calibration F - 1 MEIDEX – Crew Tutorial Calibration of IMC-201 Adam D. Devir, MEIDEX Payload Manager.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
1 An Observatory for Ocean, Climate and Environment SAC-D/Aquarius HSC - Radiometric Calibration H Raimondo M Marenchino 7th SAC-D Aquarius Science Meeting.
CERES on Terra & Aqua validation and participation in SCALES Z. Peter Szewczyk G. Louis Smith The GIST 19, RAL 08/27-29, 2003.
Overview of the “Geostationary Earth Radiation Budget (GERB)” Experience. Nicolas Clerbaux Royal Meteorological Institute of Belgium (RMIB) In collaboration.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
19 th GIST Meeting 27 th –29 th August 2003 GERB mirror mechanism 1 GERB mirror mechanism, pointing and repeatability (Tech Note MSG-RAL-GE-TN-2011) B.C.Stewart.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
Radiative Atmospheric Divergence using ARM Mobile Facility, GERB data and AMMA stations –led by Tony Slingo, ESSC, Reading University, UK Links the ARM.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
© Imperial College LondonPage 1 Estimating the radiative effect of mineral dust over ocean The radiance to flux problem Dust retrieval quality Applying.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
RMIB involvement in the Geostationary Earth Radiation Budget (GERB) and Climate Monitoring SAF projects Nicolas Clerbaux Remote sensing from Space Division.
Xin Jin 1, Yong Han 2, Ninghai Sun 1, Fuzhong Weng 2, Denis Tremblay 3, Yong Chen 4, Likun Wang 4, Xiaozhen Xiong 1 1 ERT, Inc., 2 NOAA/NESDIS/STAR, 3.
Geolocation Tuning and Status Geolocation Accuracy of Available Data Problems –E-W, N-S Centering –Discrepancies Comparing with RGP –Axis Misalignments.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
Beyond Spectral and Spatial data: Exploring other domains of information: 3 GEOG3010 Remote Sensing and Image Processing Lewis RSU.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
IBB Calibration Update J. Rufus GIST21 Meeting Boulder, CO. 31 st March – 2 nd April 2004 © Imperial College London.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
18th GIST 14 th -16 th May 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Descan mirror bearing life tests Battery issues Operations during eclipse.
GIST, Boulder, 31/03/2004 RMIB GERB Processing: overview and status S. Dewitte Royal Meteorological Institute of Belgium.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
GERB in-flight calibration Monitoring Instrument Gain.
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS JMA’s Cal/Val activities Presented to CGMS-44 Working Group.
Page 1 NPOESS Preparatory Project (NPP) VIIRS Calibration Maneuvers May 15, 2008 Ocean PEATE Team.
Characterizing Diurnal Calibration Variations using Double-Differences Fangfang Yu.
NOAA VIIRS Team GIRO Implementation 8/30/2016 Taeyoung (Jason) Choi, Xi Shao, Changyong Cao, Fuzhong Weng For Lunar Calibration Web Meeting.
© Imperial College LondonPage 1 GERB Straylight Characterisation 28th August 2003 GIST 19, RAL J A Hanafin.
GERB Ground Calibration Overview and Status J. Rufus
NOAA VIIRS Team GIRO Implementation Updates
Cluster Active Archive – Wideband data BM2 mode
Calibrating the METEOSAT SEVIRI solar channels using lunar observations Sébastien Wagner (1) Bartolomeo Viticchie (1), Tom Stone (2), Tim Hewison(1), Gary.
EUMETSAT’s Lunar Calibration Capabilities
MODIS and VIIRS Reflective Solar Bands Calibration Methodologies and
VIRTIS Operations at Lutetia
GOES-16 ABI Lunar Data Preparation to GIRO
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
Calibration and Performance MODIS Characterization Support Team (MCST)
MODIS Lunar Calibration Data Preparation and Results for GIRO Testing
San Diego Conference 2 August 2001
GERB/CERES comparisons
GOES Imager IR Midnight Calibration Anomaly and Correction
USGS Agency Status Landsat Operations Jenn Lacey 21 July 2016
Launch and On-orbit Checkout
Current Status of ROLO and Future Development
Lunar calibration of COMS visible channel using GIRO
goes-16/17 abi lunar calibration
Earth Radiation Budget: Insights from GERB and future perspectives
Presentation transcript:

© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin

© Imperial College LondonPage 2 Operations Report Eclipse season operations Operations to date Instrument investigations Calibration modes Calibration strategy for duration of mission Operations home page

© Imperial College LondonPage 3 Eclipse season – autumn 2003 MSG software patch not ready yet Real-time full SEVIRI data not available yet => GERB will spend 2003 Autumnal eclipse season in SUNBLOCK –in-flight performance of instrument to date shows this is a safe strategy –allows monitoring of despin mirror performance and other housekeeping parameters

© Imperial College LondonPage 4 Instrument tests to date (2003) TCF step test: –results of first attempt inconclusive, to be repeated Mirror face offset test: –Successful, mirror sides largely corrected for non- parallelism, may need slight tweaking Sun avoidance test: –first attempt failed, for reasons TBD. To be repeated

© Imperial College LondonPage 5 Instrument calibration modes Alpha values test Integrating sphere mode Deep space mode PSF mode Lunar mode

© Imperial College LondonPage 6 Alpha values Initial test completed 14/7/03 Results awaiting analysis before completion of test Not time-specific, can be timed to avoid aliasing Repetition of test TBD

© Imperial College LondonPage 7 Shortwave calibration Previous broadband radiation missions have shown quartz filter degradation Current series is not optimal in terms of absolute radiance, but is very close Second series could be initiated, but would involve twice the normal mode data loss, back-to-back with the current series …Inevitable aliasing problem Alternative: scans twice a year at equinox

© Imperial College LondonPage 8 Deep space mode Characterisation of in-flight instrument performance BB temperatures were varied during these measurements to determine temperature dependence of gains Current deep space and blackbody straylight issues may require rethinking of gain calculation

© Imperial College LondonPage 9 Deep space mode Doesn’t compromise data collection, but reduces temporal resolution by 2 (could be improved with a shorter space scan) Recommendation: –A full year of limited deep space data characterise instrument cycles characterise straylight Both useful data for future instruments

© Imperial College LondonPage 10 PSF mode Data to date covers in-flight characterisation, pending analysis Disruption to data collection depends on PSF mode and ability to process PSF data as normal May be useful to repeat on an annual basis in case of optics distortion 500 scanlines

© Imperial College LondonPage 11 Lunar scans 4 scans to date (Jan, May, Aug) Potential to acquire lunar data most months Lunar data of scientific interest as well as for calibration data ROLO (RObotic Lunar Observatory, USGS) are interested in collaboration, providing they can support non-NASA instruments May be useful for long term data series Analysis for absolute calibration will require significant effort The more data there is, the more useful it will become

© Imperial College LondonPage 12 Operational Strategy: calibration tests v. NORMAL data collection TestDurationFrequencyDisruption to NORMAL mode Alpha1 hourAnnualYes Deep space TBD No, but reduces frequency SW Cal45 minQuarterlyYes Lunar45 minTBD (Monthly?) Yes PSFTBDTBD (Annual?) Depends on scan type/data processing

© Imperial College LondonPage 13 GERB Operations home page GIST information –Agenda –Minutes –Presentations GERB data ‘previews’ Links –Data access – GGSPS/ROLSS –Project links –Contacts Secure area access….

© Imperial College LondonPage 14 GERB Operations home page Secure area – GIST-only access (please!) –Username: gerbteam –Password (case sensitive): POLARIS Data quality information –Newsletter –Anomaly reports ‘Support team’ meeting information –Minutes/reports from low level working groups –GGSPS –Operations –Data quality Operations information –Summary of GERB operations (indication of availability of NORMAL mode data) –GERB operational database (calibration mode times, SEVIRI/MSG operations, including earth sensor unit swaps, details of cailbration modes)