Which role for economics in the implementation of the EU Water Framework Directive ? Arnaud Courtecuisse Artois-Picardie Water Agency Miedzyzdroje, 23.

Slides:



Advertisements
Similar presentations
LILLE 3. Comment mettre en pratique l’analyse économique exigée par la directive cadre ? Le recueil des préconisations Jean-Pierre Rideau.
Advertisements

1. 2 Content Principles of the Water Framework Directive WFD and Agriculture WFD and CAP.
Twinning Project BG O7 IB EN 01 Strengthening the administrative capacity of Water Management authorities in Bulgaria for the implementation of Economic.
The WFD’s implementation in Artois- Picardie specific focus on the possibilities for extension of deadlines for achievement of ecological objectives Cooperation.
ACTeon Innovation, policy, environment Madrid – WFD Conference April 2006 How to proceed with the Programme of Measures and the River Basin Management.
Overview of WFD key issues and research needs in Europe Activity leaders: NL and ES Marc de Rooy, RIZA, NL Jornadas sobre la Aplicación de la Directiva.
Water.europa.eu Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
European Commission, DG Environment Unit B.1: Water, the Marine and Soil TAIEX Seminar « Management of Water Resources: River Basin Management in the Baltic.
Selecting cost-effective measures for achieving the WFD Jonathan Fisher- Senior Water Economist.
INTERCONNEXIONS BETWEEN ECONOMICS AND WFD What room and what role for economics?
Consultation on River Basin Planning Guidance Volume 2 and the updated WFD Impact Assessment Rory Wallace WFD Implementation.
THE ROLE OF ECONOMICS IN THE IMPLEMENTATION PROCESS WFD "eco procedure" in practice.
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
Date/event: EEA EIONET Freshwater Workshop 27-28th Sept 2010, Copenhagen Author: Dr Manuel Lago (Ecologic Institute, Berlin) ETC/Water 2010 Overview of.
Water.europa.eu 7-c) Expert Group & River Basins Network AGRICULTURE Strategic Co-ordination Group Brussels, May 2011 Nicolas Rouyer & Ville Keskisarja.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Water.europa.eu Water Framework Directive - a framework for Community action in the field of water policy Marieke van Nood WFD Team, DG ENV.D.2, European.
Water.europa.eu Assessment River Basin Management Plans CIS Strategic Coordination Group meeting Brussels, May 2011 Marieke van Nood WFD Team DG.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Workshop on Disproportionate Costs, 10./ Copenhagen Summary and draft conclusions 11 April 2008.
Aquifers of the Scheldt basin Testing the guidance document WATECO & IMPRESS groups Gabrielle Bouleau (ENGREF) & Arnaud Courtecuisse (AEAP)
Date/event: Water accounts and economics workshop, 7-8/10/2010, Copenhagen Author: Dr Manuel Lago (Ecologic Institute, Berlin) ETC/Water 2010 Overview.
Water.europa.eu Compliance Checking of River Basin Management Plans Strategic Coordination Group Meeting, 4-5 November 2009 DG Environment, European Commission.
Technical Assistance for Conversion of River Basin Action Plans into River Basin Management Plans Economics in the contract INCEPTION WORKSHOP ISTANBUL.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
T.R. MINISTRY OF FORESTRY AND WATER AFFAIRS
The French National Agency on Water and Aquatic Environments
Principles and Key Issues
Environmental Objectives- Article 4.7
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Project Objectives, Workplan and Timescales
WG 2.B Integrated River Basin Management
State of Implementation of CEA in Germany
Restoration target values?
Daughter Groundwater Directive
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
Guidance on application of Article 4.7
Proposed CIS Workshop on WFD Economic Issues
CIS-Workshop on River Basin Management Plans
Water Directors’ Meeting Common Implementation Strategy
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
INTERCONNEXIONS BETWEEN ECONOMICS AND WFD
The Water Directors recognised in 2004 that……..
Preparing a River Basin Management Plan WFD Characterisation Manager
At the Water Directors meeting in June ’04 we recognised ……..
Activity on WFD and agriculture
Natural water Retention Measures
on a protocol for Intercalibration of Surface Water
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Project 2.7 Guidance on Monitoring
DG Environment, Unit D.2 Marine Environment and Water Industry
1st Implementation Report of the Water Framework Directive
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
Ongoing work on CIS Guidance Article 4.7
Developing a common understanding of Articles 8, 9 & 10 MSFD
ECONOMICS IN THE WFD PROCESS
WFD and Agriculture Activity under the CIS 2005/2006 Work Programme
Environmental objective document –
Update WG Eflows activity and link with EcoStat
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
IMPRESS Guidance and Policy Summary Water Directors Copenhagen, 21-22nd November 2002 Working Group leaders: Volker Mohaupt, Umwelt Bundes Amt Isobel.
THE WATER FRAMEWORK DIRECTIVE (WFD)
WG C-1 activity Berlin – 3 May 2007
DG Environment, Unit D.2 Marine Environment and Water Industry
Brussels – 20 April 2007 European Commission - DG Environment
European waters - assessment of status and pressures 2018
Water Director's Meeting December 2013, Vilnius DG Environment
Presentation transcript:

Which role for economics in the implementation of the EU Water Framework Directive ? Arnaud Courtecuisse Artois-Picardie Water Agency Miedzyzdroje, 23 April 2002

The WFD gives to economics a key role to play : by the use of economic instruments as potential measures for achieving environmental objectives by the use of economic analysis all along the process

The WFD gives to economics a key role to play but : it does not mean that making economic analysis is the objective of the WFD economic analysis needs to be integrated into a multidisciplinary approach, be output delivering more than data demanding…..the development of a guidance document by WATECO Working group

The WATECO group in a nutshell Members: Member states, CEE experts, REC, candidate countries, stakeholders Activities 5 meetings Workshops with stakeholders (Bruxelles), candidate countries (Budapest) scooping and testing activities 2 meetings/workshops with HMWB, contacts with IMPRESS and BESTPRACT

A practical and pragmatic approach A mixed group of experts With commitment & input from Member States, candidate countries, stakeholders Interaction with other working groups (HMWB, IMPRESS, BESTPRACT) 2004, 2006 and 2009 requirements identification

A practical and pragmatic approach WATECO 6 : final draft guidance managers workshop Water directors meeting (June) Draft guidance (General approach and toolbox) Pilot case studies (DE, SE, EL, ES, UK, FR, PT..., Scheldt) Lille 3

The guidance document for economic analysis The economic elements of the WFD Implementing the economic analysis The 3 steps approach The toolbox: making key elements of the approach operational Annexes (illustrations, scooping and testing, …)

Economics in the WFD Article 5, Annex III Estimates volume, prices and costs of water services, Estimates present and forecast investments Cost effectiveness analysis of measures Article 9 : Taking into account the principle of cost recovery Support development of incentive pricing

Economics in the WFD Designating HMWB (Art. 4.3) Extending deadlines for meeting the objectives (Art. 4.4) Establishing less stringent objectives (Art. 4.5) Justifying failure to achieve good status as a result of new modifications or new sustainable human development activities (Art. 4.7) Identify cost effective and proportionate product and process controls (Art. 16) Set level of penalties (Art. 23)

The guidance document for economic analysis The three steps approach 1 - The initial status and the baseline scenario ( for 2004)

The guidance document for economic analysis The three steps approach 1- The initial status and the baseline scenario ( for 2004) failing to achieve good status meet the objectives 2 - ( for 2006)

The guidance document for economic analysis The three steps approach 1-The initial status and the baseline scenario ( for 2004) meet the objectives Disproportionate or not ? ( for 2006) Cost effectiveness analysis ( for 2008) Ability to pay Cost benefits analysis Programme of measures failing to achieve good status

The toolbox Water services and water uses Trend analysis and baseline scenario Scale and (dis-) aggregation issues Costs Cost-effectiveness analysis Disproportionate costs Assessment of costs and benefits Incentive pricing Assessing cost recovery Assessing benefits

Key issues to enhance implementation of the economic analysis Define good status ! Assess the effectiveness of measures ! Link economics and Article 14 Anticipate compliance deadlines ! a strategic approach to data and analysis Build capacity !

Testing of the Guidance Document on the Scheldt River Basin (France,Belgium and Netherlands)

International Commission for the Protection of the Scheldt (ICPS) : 5 parties involved (F, W, Fl, Bx and Nl) Action Program : Water quality objectives, Indicators sharing (Emissions Working Group : 5 actions dealing with economics (deadline 2003)) The ICPS/WATECO working group has submited a proposal for testing the Wateco ’s guidance document on the international Scheldt basin Preparing the pilot: background

Objectives Characterisation Baseline scenario Cost-effectiveness Cost-recovery …..on an international River Basin How to make operational some elements from the Draft Guidance document….. IMPRESS links

The Scheldt Pilot Key issues development of 3 case studies : Water Quality, Groundwater Abstraction and Morphology Trans-national context (water management system, data, scale,...) importance of Links between expertise (economics, impact & pressure) Assess the feasibility of the process rather than undertake a detailed «analysis »

« There is nothing like common water to unite people and peoples »