1 11 1 INS Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch.

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

Ali Baydoun1 Controllers (hard drive controllers).
1 Flight Test Instrumentation of the Ohio University Delphin Turbo Jet For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.
1 Flight Test Instrumentation Package for the L-29 Delfin Turbojet For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.
Inputs: Digital and 4 configurable for Digital or 10 bit Analog Outputs:4 - 8 amp Relays or 700ma Transistors (1 PWM) 4 Line by 18 Character fully.
System Setup CGS2564. What Happens When You Start up a Computer? BIOS Basic Input Output System A set of programs stored in ROM Contain instructions on.
Chapter Six Networking Hardware.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
March Automation and results of Adjacent Band Emission testing Greg Gerten Dr. Marshall Haker Kirk Meyer.
LORAN-C Band Data Collection Efforts at Ohio University Presented by Curtis Cutright to the International LORAN Association 32 nd Annual Convention and.
Basic Input Output System
ABSTRACT The goal of this project was to create a more realistic and interactive appliance interface for a Usability Science class here at Union. Usability.
Parts & Functions of a Computer. 2 Functions of a Computer.
External Interfaces and the Connector Board Interfaces Specified Originally 2x Camera Link camera2x Gigabit Ethernet camera Power Supply (9V to 36V)10/100.
Electrical and Computer Engineering SMART GOGGLES To Chong Ryan Offir Matt Ferrante James Kestyn Advisor: Dr. Tilman Wolf Preliminary Design Review.
Smart Rover Aaron Westphal Ben Merkel Joe Merrill Mike Wissolik.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 1 Introducing Hardware.
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
The Evolution and Development of the United States NOAA National Weather Service Universal Radiosonde Replacement System TECO 2005 World Meteorological.
Aircraft Response to Control Input Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch Project Sponsor: JUP.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Wireless Data Acquisition System and its application for electrical emission measurement in Substations Supervised by Dr. W.H.Siew Presented by Yu Wang.
Preparations for GPS/INS Flight Testing on a High-Dynamic Vehicle Presenter: Curtis Cutright Advisor: Dr. Michael S. Braasch.
Viking Pump Flow Manager - Phase 2 Senior Design May
Module 1 WANs and Routers.
1.In Windows desktop, right-click ‘ My Computer ’ and select ‘ Properties ’ from the menu. Activity 5 Know more about your computer system Follow the steps.
1 A+ Guide to Managing and Maintaining Your PC, Fifth Edition Hardware Needs Software to Work Hardware  Physical components of a computer  Visible part.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 1 Introducing Hardware.
1 INS Data Collection System For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Wednesday October 10 th,
GPS based time synchronization of PC hardware Antti Gröhn
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Preliminary Design Review Monday, March 25 th, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.
SoftPLC In TealwareTM SoftPLC ProcessorsTM Hardbook SoftPLC’s
By: Khalid Hawari Muath Nijim Thaer shaikh Ibrahim Supervisor: Dr. Jamal Kharousheh Dr. Nasser Hamad 27 December 2010.
NSGF 2000 PICO EVENT TIMER HERSTMONCEUX SLR STATION.
HARDWARE INTERFACE FOR A 3-DOF SURGICAL ROBOT ARM Ahmet Atasoy 1, Mehmed Ozkan 2, Duygun Erol Barkana 3 1 Institute of Biomedical Engineering, Bogazici.
M.S. Thesis Defense Jason Anderson Electrical and Computer Engineering Dept. Clemson University.
Carnegie Mellon Zoë Computing Design Design Review December 19, 2003 Michael Wagner 
Abstract The purpose of this project is to create a fully functional 8.5 meter radio telescope which can receive signals at a frequency of 1.42 GHz. The.
CS-EE 481 Spring CMOS Optically Triggered Traffic Recorder Authors Annette Collins Tom Kinnear Jeff Scott Advisor Dr. Aziz Inan Dr. Peter Osterberg.
November 15 Timing is Everything A software approach for a generalized profilometer Dr. John B. Ferris Stephen Chappell Cameron Rainey.
Copyright 2003 The McGraw-Hill Companies, Inc CHAPTER The System Unit computing ESSENTIALS    
©2002 B&R Controls Technology. B&R Control Systems Always one software – Compatible with all PLCs No matter which form factor or performance Classical.
Module 1. Upon completing Module 1 students should be able to: Understand the physical connections needed for a computer to connect to the Internet Recognize.
1 November 4th, 2003 Vehicle Safety Communications Consortium Vehicle Safety Communications Project VSC Progress Briefing #2 – Task 4 Field Testing – Overview.
Why Do Airplanes Crash? Investigating Air Data Inertial Reference Units Department of Electrical and Computer Engineering INTRODUCTION Modern aircraft.
CPU/BIOS/BUS CES Industries, Inc. Lesson 8.  Brain of the computer  It is a “Logical Child, that is brain dead”  It can only run programs, and follow.
New product introduction:
Review 1 Chapters Chapter 1 Understanding Computers, 12th Edition 2 Chapter 1 Explain why it is essential to learn about computers today and discuss.
1 Sarah Thomas, Curtis Cutright, Michael S. Braasch Avionics Engineering Center Ohio University, Athens Project Sponsor: NASA/FAA Joint University Program.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
123rd Air Control Squadron Mobile network
1 GPS/INS Flight Testing on the L-29 Delfin For the Quarterly Review of the Joint University Program for Air Transportation Research Friday, October 18.
Lecture Exam 1 Study Guide Albert Kalim. Chapter 1: Computer Basics 1. Explain why it’s essential to learn about computers today. 2. Discuss several ways.
Bus Seat Sensor Network By: Jason Hady, Michael Stevens, Wyrgy Pamphile.
KNU RTLAB A Real-Time Linux System For Autonomous Navigation And Flight Attitude Control Of An Uninhabited Aerial Vehicle Charles E. Hall, Jr. Mechanical.
Younis H. Karim, AbidYahya School of Computer University Malaysia Perlis 1.
Faculty of technical education, King Mongut’s Institute of Technology North Bangkok 1518, Pibulsongkram Road, Bangsue, Bangkok 10800, Thailand Mr.Phadungsak.
4m. Blanco TCS Upgrade: Signals and Interfaces
4m. Blanco TCS Upgrade: Signals and Interfaces
Diagram 1. Trig 1090ES ADS-B Out System
AQT90 FLEX Service Training
Packet Switch Architectures
Data Transmission System Digital Design Chris Langley NRAO
Computer Basics PE 266 Dr. Mike Butler.
Command and Data Handling
Packet Switch Architectures
Presentation transcript:

INS Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch

2 Purpose: This project will develop a method of using INS data to update position and velocity data during loss of GPS lock Software development and modification are the primary focus at this time Hardware installation and system configuration are also being evaluated Future testing may include the collection of control system data

3 Flight Test Vehicle L - 29 Delfin High Altitude High Speed Fully Aerobatic

4 Initial Data Collection System Block Diagram Ethernet Antenna 1 PPS 400Hz(Initialization) Air Data Computer Inertial Reference System PC-104 -Ethernet -ARINC Interface -Power Supply Data Collection PC Novatel GPS Receiver TTL to RS VDC 28VDC ARINC 429 Bus 12-36VDC

5 Updated Data Collection System Block Diagram 400Hz(Initialization) Air Data Computer Inertial Reference System PC-104 -Ethernet -ARINC Interface -Power Supply VDC 28VDC ARINC 429 Bus 28VDC Power/Mode SelectorBaro Set Corrections

6 Data Collection INS data will be collected on the PC-104 computer through the ARINC card Time tagging will be accomplished using the CPU clock GPS data collection software will be added later

7 Software Development Considerations ARINC card is configured for high speed receive and low speed transmit Initialization data is transmitted in 2 to 4 bursts on the low speed bus INS data is received on the high speed bus Labels can be used to mask unwanted outputs

8 Hardware Configuration Considerations Encoding altimeter will be replaced with a variable potentiometer Control Display Unit (CDU) could be replaced with a 4 position switch or 2 single throw switches

9 Conclusions Data collection system is still in development As the development continues changes will be made to the early versions of the software Other types of hardware that will be integrated into the system will drive these changes

10 Questions?