SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.

Slides:



Advertisements
Similar presentations
Current Status of the FDOT SunGuide SM Software Project Robert W. Heller, Ph.D. March 16, 2005.
Advertisements

FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
FDOT Central Office ITS Software Update
FDOT District 6 ITS Project Update Manuel Fontan, E.I. ITS Project Manager.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14,
Presented by: SAGE KAMIYA, P.E., PTOE
ITS/CVISN Efforts in the Border Region Border Partnership Working Group January 11, 2006 Al Kosik Traffic Operations Division TxDOT.
Maryland’s Coordinated Highways Action Response Team Richard R. Dye, CHART Systems Administrator “Welcome to the World of.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Statewide Transportation Management Center Software Library System Status Meeting February 17, 2004.
SunGuide SM Software Development Project Ramp Meter Firmware Discussions August 8, 2006.
SunGuide SM Software Development Project Status Meeting February 23, 2005 CDRL
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
SunGuide SM Software Development Project Status Meeting March 9, 2004.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.0 August 18, 2008 August 18,
2 Background Lake County –24 x 20 mi area –Population 690,000 –52 municipalities Congestion –No freeways –Limited 4-lane arterials –Transportation controversies.
Rural Application of the Colorado Transportation Management System Presented at ITS America, June 2007, Palm Springs, CA By Raj Chaudhuri and Ken DePinto.
SunGuide SM Software Development Project Status Meeting (via teleconference) October 4, 2005 CDRL
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting January 11, 2005.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
SunGuide TM Center-to-Center Functionality What “it is” and How to “use it” November 12, 2008.
January 11, 2007Map Alternatives Workshop 1 SunGuide SM Map Alternatives Workshop.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
Smartphone Application for Road Rangers Tucker Brown Roger Strain Robert W. Heller, Ph.D. Southwest Research Institute San Antonio, Texas USA.
Infrastructure Security Leveraging the ITS Experience Base Presented at ITS America Commercial Vehicle and Mobility Forum K.K Saxena, CCP Principal Kimley-Horn.
1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting August 27, 2007.
Statewide Transportation Management Center Software Library System (SunGuide SM ) TIM & SunGuide SM Coordination Meeting October 21, 2004 Orlando, Florida.
Statewide Transportation Management Center Software Library System Software Requirements Review (SRR) and Status Meeting January 8, 2004.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
C2C COORDINATION LOCATION: FDOT DISTRICT 4 August 17, 2004 LOCATION: FDOT DISTRICT 4 August 17, 2004.
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
SunGuide SM Software Development Project Status Meeting December 7, 2004.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
SunGuide SM Software Development Project Operator Training CDRL SunGuide-TM-Oper
SunGuide SM Software Development Project Status Meeting July 13, 2004.
Security and the National ITS Architecture ITS America 2003 Session 19: The State of the Practice: ITS and Homeland Security May 19, 2003 Minneapolis,
SunGuide SM Software Development Project Status Meeting May 10, 2005 CDRL
SunGuide SM Software Development Project Status Meeting November 9, 2004.
SunGuide SM Software Development Project Administrator Training CDRL
SunGuide TM 4.0 Functionality Data Fusion: How Data is Managed June 24, 2008.
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting October 1, 2007.
Clay Packard, PE ITS GC Software Project Manager Florida Department of Transportation WAZE – FDOT Integration.
SunGuide SM Software Development Project Status Meeting April 29, 2004.
SunGuide SM Software Development Project Status Meeting October 13, 2004.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
FHWA Sponsored Webinar August 18, 2009 Denise Markow, PE TMC/ITS & Program Manager NH Department of Transportation Gail Hambleton IT Leader Transportation.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007.
April 29, 2004 Project Status Meeting Liang Y. Hsia, P.E. ITS Engineer Administrator Florida Department of Transportation.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Implementation of a Hybrid Analog/Digital Video Management System City of San Jose, CA Kenneth Salvail, P.E. ITE District 6 Annual Meeting June 2006, Honolulu.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
SunGuide SM Software Development Project Software Design Review May 12, 2004.
SunGuide SM Incident Management Concepts Robert Heller October 21, 2004.
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:50
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Agenda Time Item Lead 10:00 – 10:05 Introductions Liang Hsia
ITE Midwestern District Conference June 20, 2017
Milestone Demonstration #1
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:45
SunGuideSM Software Development Project Status Meeting and Demonstration April 5-6, 2005 CDRL
Presentation transcript:

SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004

July 14, 2004SunGuide Software: Status Update 2 Goals and Objectives FDOT Goals –Improve transportation safety. –Reduce congestion and delays. –Acquire (own) the most technically comprehensive ITS software. –Establish a software standard at TMCs throughout the State of Florida. –Reduce multiple TMC software development, maintenance, and update costs. SunGuide software goals: –Flexible and expandable to match individual TMC needs. –Respond to traffic incidents in a rapid, accurate, and effective manner.

July 14, 2004SunGuide Software: Status Update 3 Project Web Site

July 14, 2004SunGuide Software: Status Update 4 SunGuide SM Software Architecture Robust Extensible Flexible Scalable Configurable Proven

July 14, 2004SunGuide Software: Status Update 5 Release-Oriented Development Approach

July 14, 2004SunGuide Software: Status Update 6 Scope of SunGuide SM Effort Release 1: –Core software framework: Database Process viewer Status logger User interface Map –DMS subsystem, drivers for: NTCIP Florida MIB Mark IV version 2.5 –CCTV subsystem, drivers for: NTCIP camera support NTCIP Video Switch Support IP-Video support Barco Video Wall Support –Traffic Detection, driver for: BiTrans B238-I4 RTMS (EIS and Wavetronix) Microloops (3M) –Incident management subsystem Release 2a: –Core software framework upgrade –Center-to-Center –FDOT Central office configuration –Ramp metering –DMS subsystem, drivers: Trailblazers –RWIS –Archive data –HAR –Web server –Emergency evacuation Release 2b: –Inventory and maintenance

July 14, 2004SunGuide Software: Status Update 7 Traffic Conditions

July 14, 2004SunGuide Software: Status Update 8 Camera Control GUI

July 14, 2004SunGuide Software: Status Update 9 DMS Status GUI

July 14, 2004SunGuide Software: Status Update 10 DMS Control GUI

July 14, 2004SunGuide Software: Status Update 11 Event Manager

July 14, 2004SunGuide Software: Status Update 12 Incident Management Data Entry

July 14, 2004SunGuide Software: Status Update 13 Response Plan GUI

July 14, 2004SunGuide Software: Status Update 14 Center-To-Center Status: –Centers must explicitly subscribe for data –User must choose to view the data Command/Control: sender must have credentials at the receiving center

July 14, 2004SunGuide Software: Status Update 15 Center-to-Center User wishes to view other center’s data: –Systems administrator must configure SunGuide to subscribe to other center’s data –User must configure User Interface to display other center’s data User wishes to command a remote center’s devices: –Select equipment to command –Issue command (credentials established locally will be transmitted to the remote center) –Conflict resolution occurs at remote center

July 14, 2004SunGuide Software: Status Update 16 High Level Schedule Software Releases –Release 1 – November 2004: District 4 –Release 2a – August 2005: District 6 –Release 2b – November 2005: Statewide Short-term deployments: –District 4 Broward County RTMC –District 6 Miami RTMC: Early release of Ramp Meter with Release 1 target for May / June 2004

July 14, 2004SunGuide Software: Status Update 17 Schedule Status Current schedule is posted to project web site Functional threads that can be demonstrated: –Support processes (executive, logging) –Data Bus –GUI / Map –Incident Management –Administrative Editor –DMS: Subsystem master process Mark IV NTCIP –CCTV: Subsystem master process NTCIP CCTV Camera control –TSS: Subsystem master process BiTrans simulators

July 14, 2004SunGuide Software: Status Update 18 Functional Threads: Graphical View

July 14, 2004SunGuide Software: Status Update 19 District 4 Milestone Demo Milestone Demonstrations: demonstrate system functionality prior to formal release Coordination meeting took place July 1, 2004: –D4 discussed current configuration and projects underway Field / Center tours –Current center interfaces to field equipment / infrastructure –Field interface to sign equipment –New center interfaces Milestone demo date is still TBD; weekend testing is likely

July 14, 2004SunGuide Software: Status Update 20 Release 1+ Ramp Metering in D6 Need: D6 needs Ramp Meeting before release 2a will be complete. Release 1+ –Incorporate ramp metering into Release 1 –Not formal release Schedule –Install 6/1/2005 –Operational 6/30/2005

July 14, 2004SunGuide Software: Status Update 21 Liang Y. Hsia, P.E. (850) Florida Dept. of Transportation 605 Suwannee St. MS 90 Tallahassee, Florida Robert Heller (210) Southwest Research Institute P.O. Drawer San Antonio, Texas Questions? Contact Information: