GLAST LAT ProjectMonthly Review, March 30, 2005 4.1.7 DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S March Monthly Review Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 2 TEM/TPS Status & Schedule Status –Two Flight Tower-Electronics Modules/Tower Power Supplies Both modules delivered to I&T –Qual unit All tests completed, one issue On-board current measurement jumpy under certain conditions –After some experimentation, traced it down to leakage between one of the current monitoring ADC connections and the tracker Bias voltage. –Only see it when bias voltage is increased –Most likely cause: leakage path (assembly issue) between neighboring solder pads were pig-tail is soldered to board –De-mated TEM and TPS, first measurements indicate it is TPS –Next step is opening TPS, but pig-tail is staked so not sure what can visually be observed (need new MRB meeting) Not seen on the two flight boards (A & B), likely cause is assembly issue (cleaning of board?) on qual –Balance of 19 TEM/TPS in assembly at vendor 6 TEM and 4 TPS pre-coat at SLAC, being tested Holding TPS supplies pending resolution of issue, see next slide Schedule –4/17/05 Third to sixth TEM/TPS deliver to SLAC? –4/27/05 Third/Fourth TEM/TPS deliver to I&T –5/6/05 Fifth/Sixth TEM/TPS deliver to I&T –7/26/05 Last TEM/TPS to I&T

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 3 TPS Issue No issue on any of EM supplies Qual supply showed (with load-testboard connected) 100mV-ripple on Cal 3.3V digital, but only if turned on at elevated temperatures –If turned on cold, no issue even at 55C –If turned on warm, issue even at -40C –Turn-on issue Put qual supply on tower with 4 flight-lot (non-flight) CAL AFEE cards and 36 flight-lot (non-flight) TKR MCM cards –No issue up to 75C (highest temp tested) –Additional observation (positive) Communication (configuration/event readout) between TEM/TKR/CAL worked over tested temps from 020C to 75C However temp tests with non-flight TPS but with flight components showed ripple/oscillation at above 65C for TKR 2.5Vdig and 1.5V with above tower –Concern Traced it down to low-ESR of flight-lot capacitors –In process of simulating (non-trivial due to non-existence of accurate converter model) –Measurements in progress look again at stability (network analyzer) –Might have to exchange a resistor to another value, tbd

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 4 PDU Status and Schedule Schedule for proto-flight –4/4/05: unit assembled, pre-coat, to be sent to SLAC for testing –Mid to end April: unit fully assembled, ready for environmental test Schedule for Flight Unit –5/15/05 Precoat PDU assembly ready for electrical test –5/30/05 Complete assembly ready for environmental test –7/1/05 Flight PDU to I&T Tester –Designed analog mux card for TV test, fabricated, is in assembly –Vacuum feed-thru plate on order, due next week –Vibration fixture fabricated

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 5 GASU Status and Schedule Status –Parts kitting Delay due to man-power shortage in kitting Parts just delivered to Aeroflex –Flight assembly was to start 3/20/05, delay (2 weeks) Schedule for proto-flight –Mid April + 2 weeks: unit assembled, pre-coat, ready for test –End April + 2 weeks: unit fully assembled, ready for environmental test Schedule for Flight Unit –5/20/05 Precoat GASU assembly ready for electrical test –6/10/05 Complete assembly ready for environmental test –7/13/05 Flight GASU to I&T Tester –Tester in design/debug –Designed analog mux card for TV test Lots of harness assembly in progress for these cards –Ordered 450-pin feed-thru for chamber, due next week

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 6 SIU/EPU Status and Schedule Status –Parts to be kitted –Board had to be refabricated due to coupon failures (fab now at DDI and Tyco for risk/schedule mitigation) –Also reduced amount of copper in boards to simplify PCI connector assembly –Wave-solder connector assembly looks most promising, but has issues Requires another round of 5 boards to be assembled/analyzed before any flight assembly can occur (vary temperature profile, etc) Can only take place after back-plane boards are back from fab, in 10 days. Schedule –In next 2-3 weeks: assemble another set of PCI boards for testing Analysis at GSFC Decision for flight assembly –6/1/05 Precoat cCPI boards ready for electrical test –7/28/05 Complete assembly ready for environmental test –8/19/05 First Flight SIU/EPU to I&T –8/24/05 Second flight SIU/EPU to I&T –8/27/05 Third flight SIU/EPU to I&T –8/30/05 Fourth flight SIU/EPU to I&T –9/2/05 Last flight SIU/EPU to I&T Tester –In design

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 7 Harness Harness in assembly, priority list with dates on web-page below Hardware/LAT-Harness/lat-harness.htmhttp://www-glast.slac.stanford.edu/Elec_DAQ/DAQ- Hardware/LAT-Harness/lat-harness.htm

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 8 VSC (Virtual Spacecraft Simulator) System Design for VSC complete All non-custom hardware to be for 4 systems on order –Received two sets of GPS and MIL1553 Need to install antenna on roof, make it work, etc –Balance of two sets first week of April SSR hardware interface module‘s complete/tested Need to design interface board for thermistor/RTD measurement function in space-craft (temperatures/voltages usually monitored by SC) VSC –Queing/scheduling/1553 2/3 done –Goal to finish be end of next week Proxy Classes –CCSDS/Networking/Handlers 1/3 done –Goal to finish on 2 weeks FSW Test –Python, 1/3 done –Gola to finish in 2 weeks –FSW test groups has interface and is writing scripts against above Debugging of whole system to be done once all pieces are available 2 VSC‘s for FSW/ISOC/I&T for data-flow lab 2 VSC‘s for I&T to follow

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 9 Issues TPS ripple issue AUSTIN EEPROM DPA problems –Don’t have schedule for new lot yet Qualification of cCPI press-fit connector assembly using solder process Delivery issue with GASU PS Zener protection diode for ACD voltage (April delivery, might eliminate the part) Need to work on closing open FPGA review items

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 10 Level 3 Milestone Count

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 11 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 12 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 13 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 14 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 15 Milestone Variance Explanation Schedule Impact Cost Impact Corrective Action –None

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 16 Cost Report

GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 17 FTE Report (DOE/NASA-funded only)