©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.

Slides:



Advertisements
Similar presentations
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Advertisements

McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Part IV MANUFACTURING SYSTEMS
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Ch 1 Introduction Sections: Production Systems
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
For the exclusive use of adopters of the book Introduction to Microelectronic Fabrication, Second Edition by Richard C. Jaeger. ISBN © 2002.
Rev. 11/30/03SJSU Bus David Bentley1 Chapter 5 – Capacity Planning and Control Definitions, capacity measurement, MRP II and capacity, utilization,
Chapter 5 – Capacity Planning and Control
Part II AUTOMATION AND CONTROL TECHNOLOGIES
Automated Production Lines
Ch 18 Cellular Manufacturing
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Ch 3 Manufacturing Models and Metrics
Part IV MANUFACTURING SYSTEMS
Operations Management
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Part II AUTOMATION AND CONTROL TECHNOLOGIES
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 2 Product Costing Systems: Concepts and Design Issues.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
5-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Capacity Planning
Part I OVERVIEW OF MANUFACTURING
Ch 25 Production Planning and Control
Ch 1 Introduction Sections: Production Systems
Chapter 5 Section 2.  Marginal Product of Labor ◦ The change in output from hiring one additional unit of labor  Increasing Marginal Returns ◦ Workers.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Ch 15 Manual Assembly Lines
Ch 18 Cellular Manufacturing
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Learning Curves Chapter 19 Sections: Learning Curve Theory
Unit 6 Costs and Decision Making. Role of the Firm Goal  Firms make decisions to maximize profits Production  Transformation of factors into goods Production.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Classification of Costs Lecture No.
Controlling Manufacturing Costs: Standard Costs
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
COMPUTER INTAGRATED MANUFACTURING. Production System A collection of people, equipment, and procedures organized to accomplish the manufacturing.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Product Costing Systems: Concepts and Design Issues
Ch 17 Automated Assembly Systems
Part II AUTOMATION AND CONTROL TECHNOLOGIES
Ch 3 Manufacturing Models and Metrics
Ch 5 Industrial Control Systems
Analytical Tools for Process Analysis and Improvement
Week 13 COMPUTER INTEGRATED MANUFACTURING SYSTEM (CIMS)
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
COST CONCEPTS AND DESIGN ECONOMICS
MANUFACTURING SYSTEMS
Chapter 1: Introduction to Control Systems Objectives
Manufacturing Operations
Capacity Planning For Products and Services
Ch 1 Introduction Sections: Production Systems
Presentation transcript:

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 1 Ch 3 Manufacturing Models and Metrics Sections: 1.Mathematical Models of Production Performance 2.Manufacturing Costs

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 2 Production Concepts and Mathematical Models  Production rate R p  Production capacity PC  Utilization U  Availability A  Manufacturing lead time MLT  Work-in-progress WIP

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 3 Operation Cycle Time Typical cycle time for a production operation: T c = T o + T h + T th where T c = cycle time, T o = processing time for the operation, T h = handling time (e.g., loading and unloading the production machine), and T th = tool handling time (e.g., time to change tools)

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 4 Production Rate Batch production: batch time T b = T su + QT c Average production time per work unit T p = T b /Q Production rate R p = 1/T p Job shop production: For Q = 1, T p = T su + T c For quantity high production: R p = R c = 60/T p since T su /Q  0 For flow line production T c = T r + Max T o and R c = 60/T c

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 5 Production Capacity Plant capacity for facility in which parts are made in one operation (n o = 1): PC w = n S w H s R p where PC w = weekly plant capacity, units/wk Plant capacity for facility in which parts require multiple operations (n o > 1): PC w = where n o = number of operations in the routing

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 6 Utilization and Availability Utilization: U = where Q = quantity actually produced, and PC = plant capacity Availability: A = where MTBF = mean time between failures, and MTTR = mean time to repair

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 7 Availability - MTBF and MTTR Defined

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 8 Manufacturing Lead Time MLT = n o (T su + QT c + T no ) where MLT = manufacturing lead time, n o = number of operations, T su = setup time, Q = batch quantity, T c = cycle time per part, and T no = non-operation time

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 9 Work-In-Process WIP = where WIP = work-in-process, pc; A = availability, U = utilization, PC = plant capacity, pc/wk; MLT = manufacturing lead time, hr; S w = shifts per week, H sh = hours per shift, hr/shift

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 10 Costs of Manufacturing Operations  Two major categories of manufacturing costs: 1.Fixed costs - remain constant for any output level 2.Variable costs - vary in proportion to production output level  Adding fixed and variable costs TC = FC + VC(Q) where TC = total costs, FC = fixed costs (e.g., building, equipment, taxes), VC = variable costs (e.g., labor, materials, utilities), Q = output level.

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 11 Fixed and Variable Costs

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 12 Manufacturing Costs  Alternative classification of manufacturing costs: 1.Direct labor - wages and benefits paid to workers 2.Materials - costs of raw materials 3.Overhead - all of the other expenses associated with running the manufacturing firm  Factory overhead  Corporate overhead

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 13 Typical Manufacturing Costs

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 14 Overhead Rates Factory overhead rate: FOHR = Corporate overhead rate: COHR = where DLC = direct labor costs

©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. 15 Cost of Equipment Usage Hourly cost of worker-machine system: C o = C L (1 + FOHR L ) + C m (1 + FOHR m ) where C o = hourly rate, $/hr; C L = labor rate, $/hr; FOHR L = labor factory overhead rate, C m = machine rate, $/hr; FOHR m = machine factory overhead rate