0 iNEMI Board and System Manufacturing Test TIG Update Phil Geiger 2008 IEEE Board Test Workshop Sep 08.

Slides:



Advertisements
Similar presentations
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Advertisements

Course: e-Governance Project Lifecycle Day 1
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
NACE Direct Assessment Standards Office of Pipeline Safety (OPS) Public Meeting November 4, 2003.
<<Date>><<SDLC Phase>>
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Sarbanes-Oxley Compliance Process Automation
Mailer’s Technical Advisory Committee (MTAC) Task Team 2 General Session Presentation November 16, 2010.
INDUSTRIAL & SYSTEMS ENGINEERING
Mohammad Alshayeb 19 May Agenda Update on Computer Science Program Assessment/Accreditation Work Update on Software Engineering Program Assessment/Accreditation.
Project Centric Solutions Page 1 Swaziland Electricity Board Magsoft e-Tendering Solution Magsoft International LLC
Phase II Review MSD II P Size is too big and not comparable with original testing Hinge is not possible with rapid prototyping, metal hinge would.
A c c e l e r a t i n g Y o u r S u c c e s s ™ Electronics Marketing: Electronic Components EMEA Core Distribution Services Financial Strength & Inventory.
Strategic Technology Planning for Nonprofits 2009 Pacific Northwest Digital Inclusion Summit David Forrester January 28, 2009.
PRIME Economics WP Sub-contractors Meeting Thursday 16th December, – In Den Rustwat.
IMS Europe Kevin Riley IMS, European Development
S/W Project Management
BITS Proprietary and Confidential © BITS Security and Technology Risks: Risk Mitigation Activities of US Financial Institutions John Carlson Senior.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
0 Boundary Scan Adoption Survey Results Phil Geiger Steve Butkovich 2009 IEEE Board Test Workshop 9/17/2009.
AIAA’s Publications Business Publications New Initiatives Subcommittee Wednesday, 9 January 2008 Rodger Williams.
Using Business Scenarios for Active Loss Prevention Terry Blevins t
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
 ELECTRI Council Meeting  Information Technology Assessment for Line Electrical Contractors Vanessa Valentin, Ph.D. Assistant Professor Department of.
ESA/ESTEC, TEC-QQS August 8, 2005 SAS_05_ESA SW PA R&D_Winzer,Prades Slide 1 Software Product Assurance (PA) R&D Road mapping Activities ESA/ESTEC TEC-QQS.
IEEE BTW Update Fort Collins, Colorado September 16, 2009.
ADVANCED DESIGN APPLICATIONS UNIT 4 - MANUFACTURING © 2015 International Technology and Engineering Educators Association, Learning Cycle Three – Looping.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Logan Anbinder, Amy Cordell, Gretchen Downey, Kelly Freudenberger, Shabaab Kamal, Nikko Khuc, Josh Lacey, Caitlin Moore, Emmarie Myers, Andrea Schmidt.
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
National Institute of Standards and Technology Information Technology Laboratory 1 USG Cloud Computing Technology Roadmap Next Steps NIST Mission: To promote.
P R E S E N T A T I O N to Academic Senate Forum 17 – May ALFA TECH.
TeamCluster Project Real time project management solutions Harry Hvostov April 27, 2002.
Paul Butterworth Management Technology Architect
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
Repurpose, Compose, Profit— Next Generation SOA Infrastructure William Cox Cox Software Architects LLC Copyright 2008.
Planning your Project Managing your 333T project is like managing any professional project.
Improving Software Testing by Observing Process -Ossi Taipale -Kari Smolander Lappeenranta University of Technology, Finland Presented by Albert Saryan.
FAMLEARNS Project Steering Committee Meeting September 22, :30 – 1:30 PM 113 Tucker Hall.
A GEO Label: Status, Issues, Next Steps Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
Seeking SC Feedback on Draft Technology Strategy and Roadmap for EarthCube Draft of 3 November 2015 The Technology and Architecture Committee (TAC) Chairs:
VA Indian Health Service BCMA Effort Chris L. Tucker Director, Bar Code Resource Office VHA OIA, Health Informatics.
INCOSE Systems of Systems Working Group Alan Harding BAE Systems Dr. Judith Dahmann MITRE Corporation SoS Working Group Co-chairs.
Foundational Program Overview September  2004 Copyright RosettaNet. RosettaNet Foundational Programs Program Overview ProgramPhase InvestigateDesignImplement.
Research in the Office of Vaccines Research and Review: Vision and Overview Jesse Goodman, M.D., M.P.H. Director, Center for Biologics Evaluation and Research.
January Today’s Topics Project Roadmap Benefits of Early Document Collection What If We Don’t Have Time? Global Design Prep (pre-vendor) Global.
Software Quality Assurance. Software Quality Software quality is defined as the quality that ensures customer satisfaction by offering all the customer.
Probabilistic Risk Assessment and Conceptual Design Bryan C Fuqua – SAIC Diana DeMott – SAIC
DecisionDatabases.com Global Computer Servers Industry 2016 Market Research Report Contact No:
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Jeju, 13 – 16 May 2013Standards for Shared ICT Recent Standardization Activities on E-waste Recent Standardization Activities on E-waste Samyoung CHUNG,
©2009 HP Confidential1 1 Teresa Schlegelmann CMS World Cup 2010 AMS - Houston Solution Consulting Services.
This is a customer facing presentation that you can use to present the your assessment findings, recommendations, options, benefits and requirements. This.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Proposed Updates to the Framework for Improving Critical Infrastructure Cybersecurity (Draft Version 1.1) March 2017
Initial project results: Annex 6 – 20 Sept 2016
APEX Electrical Interconnection Consultants, LLC
Industry Buy and Maintain Quiet initiative update
IS4550 Security Policies and Implementation
Reliability Standards Development Plan
Recent Standardization Activities on E-waste
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
RTA report summary Date: Authors: Jan 2019
Presentation transcript:

0 iNEMI Board and System Manufacturing Test TIG Update Phil Geiger 2008 IEEE Board Test Workshop Sep 08

1 iNEMI Overview The International Electronics Manufacturing Initiative (iNEMI) is an industry-led consortium whose mission is to assure leadership of the global electronics manufacturing supply chain. iNEMI roadmaps the needs of the global electronics industry, identifies technology and infrastructure gaps and helps eliminate those gaps (both business and technical) through: –accelerated deployment of new technology –development of industry infrastructure –dissemination of efficient business practices –stimulation of standards

2 iNEMI Test TIG iNEMI Board and System Manufacturing Test TIG Goals: To improve the effectiveness of the test process and the quality of electronic products in a global manufacturing environment Scope includes test technology and process improvement for boards and systems (e.g. automated inspection, electrical test, boundary scan, functional test, system test)

3 iNEMI Test TIG The iNEMI Test TIG was initially formed by representatives of a group of companies (HP, Intel, Apple, Cisco, Dell) with the purpose of exploring solutions to common global manufacturing board and system test related challenges facing the OEMs and the industry in general. Test TIG Chair: Rosa Reinosa, Hewlett-Packard Test TIG Co-Chair: James Grealish, Intel

4 Test TIG Projects 2008/2009 Projects: Functional Test Coverage Model Boundary Scan Adoption Board Flexure

5 Functional Test Coverage Model The goal of the functional test coverage model project is to develop a common industry methodology for predicting functional test coverage on a system board. Chair: Tony Taylor, Intel

6 Functional Test Coverage Model Project Milestones: The first phase of this project is to look at common industry practices today The second phase is to develop a methodology to capture test coverage for functional test The third phase of the project is to exercise the method with existing product boards (server, networking and medical) and to evaluate the effectiveness of the methodology and any gaps that would need to be addressed. First pass conclusions will be available in early 2009.

7 Functional Test Coverage Model Status: First product assessment method in progress Currently applying methodology on 3 product boards Next Steps: Gather learnings from first assessment Modify methodology based on learnings Complete two other assessments Refine and finalize model Publish results Publish model via iNEMI

8 Boundary Scan Adoption The goal of the boundary scan adoption project is to broaden the use of boundary scan technology in the industry. The project is addressing the importance that Boundary Scan has in enabling the test of component interconnects that may not be able to be tested any other way. Many OEMs are faced with the unique challenge of testing these complex components that lack testability features. Chair: Phil Geiger, Dell Co-chair: Steve Butkovich, Cisco

9 Boundary Scan Adoption Project Milestones: The first phase of this project seeks to identify the state of boundary scan technology use in the industry. The team will develop a comprehensive survey to gather inputs from component vendors, OEMs, ODMs and CMs. The second phase is to distribute the survey and collect and analyze the results. Survey results will be published through iNEMI. The third phase of the project will include actions to address major industry gaps found through the survey.

10 Boundary Scan Adoption Status: Currently in Phase 1 Generating draft of industry survey Next Steps: Complete draft of industry survey Send out industry survey Analyze survey inputs Publish results Address initial set of gaps

11 Board Flexure The goal of the board flexure project is to promote the use of standard methodologies to establish strain limits for BGA components and printed circuit boards. Lead free boards are more susceptible to mechanical stresses and therefore more prone to damage when bent. There is currently no consistency in the industry about the placement of gauges on boards to measure strain levels due to the real estate challenges on board designs, test methods to derive strain limits vary, as well as, strain metrics and failure criteria. Chair: Rosa Reinosa, HP

12 Board Flexure Project Milestones: A new emerging spherical bend test methodology originally developed by Intel will be proposed to IPC/JEDEC 97XX committee –This new test method can better emulate worst bend mode/conditions on a PCA during manufacturing, test or assembly process. –Variables that drive strain limit will be highlighted so that designers and engineers can improve board, product and test fixture designs, as well as, handling practices to minimize mechanical damage. New lead free PCA strain limit guidance will be published. –Each company will continue to establish specific guidelines for components and boards based on their own analysis and level of risk. The group expects to have the first proposal for IPC/JEDEC in late Project completion is expected in 2009.

13 Board Flexure Status: Spherical Bend Test Method Standard proposal under development Completed review of IPC 9702 challenges and recommendations Next Steps: Review IPC 9704 challenges and recommendations Present new test method proposal to IPC 97XX committee and JEDEC 14.1 (late 2008) Complete enhancements to IPC 9702 and IPC 9704 Submit recommendations to IPC and JEDEC committee

14 contacts: