6/6/2013 1 PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.

Slides:



Advertisements
Similar presentations
10/03/ PHENIX WEEKLY PLANNING Oct. 3, 2013 Don Lynch.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
8/22/ PHENIX WEEKLY PLANNING Aug. 22, 2013 Don Lynch.
10/17/ PHENIX WEEKLY PLANNING Oct. 17, 2013 Don Lynch.
5/2/ PHENIX WEEKLY PLANNING 5/2/2013 Don Lynch.
6/7/20121 PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
7/11/ PHENIX WEEKLY PLANNING 7/11/2013 Don Lynch.
10/31/ PHENIX WEEKLY PLANNING Oct. 31, 2013 Don Lynch Happy Halloween!
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
4/4/20131 PHENIX WEEKLY PLANNING 4/4/2013 Don Lynch.
5/23/20131 PHENIX WEEKLY PLANNING 5/23/2013 Don Lynch.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
8/2/20121 PHENIX WEEKLY PLANNING 8/2/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
7/18/ PHENIX WEEKLY PLANNING 7/18/2013 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
6/20/ PHENIX WEEKLY PLANNING 6/20/2013 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
8/1/ PHENIX WEEKLY PLANNING Aug. 1, 2013 Don Lynch.
7/26/20121 PHENIX WEEKLY PLANNING 7/26/2012 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
7/19/20121 PHENIX WEEKLY PLANNING 7/19/2012 Don Lynch.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
8/29/ PHENIX WEEKLY PLANNING Aug. 29, 2013 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
823/20121 PHENIX WEEKLY PLANNING 8/23/2012 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
7/12/20121 PHENIX WEEKLY PLANNING 7/12/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
7/25/ PHENIX WEEKLY PLANNING 7/25/2013 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
4/18/20131 PHENIX WEEKLY PLANNING 4/18/2013 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
9/12/ PHENIX WEEKLY PLANNING Sep. 12, 2013 Don Lynch.
Presentation transcript:

6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and planning issues over a burger and some salads at the party.

6/6/ This Week Last week of run 13 No Scheduled Maintenance this week: mRPC Test Lab (Formerly RPC Factory): begin operations VTX strip pixel stave re-design prototype evaluation Continue sPHENIX support HCal prototype EMCal prototype design continuing MPC-Ex design for run 14 Future IR evolution modeling End of Run 13 Barbeque

6/6/ Next Week Run 13 Ends FVTX Post run tests Flammable Gas Purge PASS Interlock tests Roll out shield wall Shield wall disassembly Prep to move EC VTX strip pixel stave re-design prototype performance testing Continue sPHENIX support HCal prototype EMCal prototype design continuing MPC-Ex design for run 14 Future IR evolution modeling

6/6/2013 4

5

6

7 5/15/13 7

6/6/ Existing vacuum bellows anti-squirm In MPC S Cavity Proposed vacuum bellows anti- squirm in MPC S Cavity to accommodate MPC-Ex 1 st Tungsten Plate received: Inspection OK

6/6/ MuTr South Arm Areas to be accessed Station-2,3 Noisy ADTX Check Grounding Noisy ADTX Check Grounding

6/6/ Major Projects This Summer: VTX repairs/upgrades/general maintenance (Mike L.) DC East Window Replacement (Kenny J.) MPC-Ex Initial (partial) Installation (Jim L.) mRPC Tests in mRPC Test Lab (formerly RPC Factory) (Frank T.) sPHENIX Prototypes assembly & tests (All) MuTr troubleshooting and Repairs (Chris P.) Window Washer Winch upgrade (Jim L.) Other Mechanical (TBD) Other Electrical Projects HVAC Controls Upgrade (Frank T.) Complete Window Washer Controls Upgrade (Frank T.) Other Electronics Projects Additional upgrading of ADAM system to MODBUS (Sal P.) Electronics research in support of sPHENIX and RATCAP (Sal P.) Lecroy HV comminuications upgrade (Sal P.) Other Gas System Projects (TBD) RPC Gas Recirc. Upgrade (John T.) Drawing and Config. Control Improvements (SULI Student) Other Infrastructure Projects (TBD)

6/6/ Work Permits for 2013 Shutdown Start of Shutdown VTX/FVTX repair & Upgrade MPC-Ex initial/prototype installation DC East Window replacement sPHENIX prototype assembly and test setup MuTr troubleshooting and repairs Window Washer Winch replacement/upgrade Other TBD End of Shutdown/Run 14 Prep

6/6/ Shutdown Schedule Prep for 2013 shutdown2/11-6/11/2013 Design, Fabricate MPC-Ex Define tasks and goals Analysis and design of fixtures, tools and procedures Fabricate/procure tools and fixtures Tests, mockups, prototypes Receive, fabricate, modify, finish installables Review and approval of parts, tools, fixtures and procedures Assembly and QA tests VTX Strippixel redesign In-progress VTX Strippixel 1 st article stave assembly5/3/2013 VTX Strippixel 1 st article qualification/performance tests5/31/2013 VTX strippixel stave production5/20-8/30/2013 VTX Strippixel sensor reclamation4/1-8/30/2013 VTX Strippixel ladder assembly6/1-9/27/2013 Pixel Ladder repairs4/1-9/27/2013 End of Run Party6/6/2013 Run 12 Ends6/11/2013 Shutdown Standard Tasks6/11-7/19/2013 Open wall, disassemble wall, Remove MuID Collars, Move EC to AH, etc. VTX/FVTX Post run tests6/11-6/14/2013 Disassemble VTX/FVTX services 6/17-7/3/2013 July 4 th Holiday7/4-7/2013 Remove VTX/FVTX and transport to Chemistry Lab 7/8/2013 Remove Lampshade MMS, East Vertical7/8-12/2013 Assemble, Test and Install MPC-Ex (Partial, location TBD)7/22-10/1/2013

6/6/ MuTR Troubleshooting, maintenance and repairs7/22-9/27/2013 Summer Sunday (8/11) Prep and teardown7/29-8/6/2013 Summer Sunday (RHIC)8/4/2013 DC East Window Upgrade and Related Repairs8/19-9/27/2013 sPHENIX HCal Prototype Assembly/test8/19-10/15/2013 Labor Day Holiday9/2/2013 Repair upgrade, reassemble VTX/FVTX (pixels and strip-pixels)7/11-10/13/2013 Test, survey (at Chemistry and IR) and re-install VTX/FVTX10/16-10/27/2013 Other detector maintenance as requiredAs required Infrastructure maintenance as requiredAs required TBD prototype tasksAs required Pre-run commissioning and prep for run 1411/1-12/31/2012 Veterans Day, Lab Holiday11/11/2013 Prep for EC roll in11/1-11/9/2013 Roll in EC11/10-11/12/2013 Prep IR for run11/1-11/30/2013 Thanksgiving Holidays11/28-29/2013 Pink/Blue/White sheets12/14-12/31/2013 Christmas Holiday 12/24-25/2013 New Year’s Day Holiday1/1/2014 Start run 141/2/ Shutdown Schedule (Continued)

6/6/ Where To Find PHENIX Engineering Info End of Run 13 Coming next week.. Enjoy the End of run party! (Today) Thursday, June 6, at 12:30 PM