ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.

Slides:



Advertisements
Similar presentations
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Advertisements

Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to identify any challenging compliance.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
Improving Learning, Persistence, and Transparency by Writing for the NASPA Journal Dr. Cary Anderson, Editor, NASPA Journal Kiersten Feeney, Editorial.
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March American Welding Society Stainless Steel Edition.
Marine Auxiliary Machinery
16.5 Introduction to Cost- based plan selection Amith KC Student Id: 109.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
Dynamic Presentation of Key Concepts Module 2 – Part 3 Meters Filename: DPKC_Mod02_Part03.ppt.
Statistical Analysis. Purpose of Statistical Analysis Determines whether the results found in an experiment are meaningful. Answers the question: –Does.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group #13 August 26, 2009 SCAQMD Diamond Bar, California.
Statistical Analysis Statistical Analysis
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Chapter 8: Problem Solving
1 Framework Programme 7 Guide for Applicants
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
Kaizen Project Selection & Team Basics Quality Engineering and Quality Management 1 © University of Wisconsin-Madison.
PUBLIC HEARING FOR THE PROPOSED Notice To Lessee/Operators of Onshore Federal Oil and Gas Leases Within the Jurisdiction of the Wyoming State Office (NTL.
Audit objectives, Planning The Audit
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
Chapter Nine Copyright © 2006 McGraw-Hill/Irwin Sampling: Theory, Designs and Issues in Marketing Research.
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
COMPETITION REQUIREMENTS
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
1 Comprehensive Pump Testing Challenges. 2 Purpose This presentation will discuss:  Hardships encountered while implementing comprehensive pump test.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
0 Technical Study Implementation Potential Disagreements Content of Progress Report Request for Modification to Approved Studies Request for New Study.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Essential Question:  How do scientists use statistical analyses to draw meaningful conclusions from experimental results?
Teaching Improvement Program Labs, Students, and Teaching – Oh My! January 17, 2008.
Draft Policy Allocation of IPv4 and IPv6 Address Space to Out-of-region Requestors 59.
COMPARABILITY PROTOCOLUPDATE ADVISORY COMMITTEE FOR PHARMACEUTICAL SCIENCE Manufacturing Subcommittee July 20-21, 2004 Stephen Moore, Ph.D. Chemistry Team.
MTAC Work Group #82 Parcel Delivery Performance Measurement Effectiveness.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
GENERAL FUNDS DISBURSAL April 2008 Revised June 2008 Proposal from Asha DC.
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee
1 Task 2 – High Tier Source Categories  Overall goal of Task 2 is to identify high-tier source categories and present detailed methodologies to estimate.
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
Spectral Efficiency Ad-hoc March 18, Status and Continuation The ad-hoc group will meet again Thursday, March 19, 2004 at 7:00 am In preparation.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Building Industry Authority Determination 2003/3 Commentary Paul Clements.
1 DATA ANALYSIS, ERROR ESTIMATION & TREATMENT Errors (or “uncertainty”) are the inevitable consequence of making measurements. They are divided into three.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Standards and Certification Training
Standards and Certification Training
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Chapter 21 Formal Reports
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
TRTR Briefing September 2013
Interpretations and Code Cases
Liver and Intestinal Organ Transplantation Committee Spring 2014
Rating in 2002 for funding from 2003
Liver and Intestinal Organ Transplantation Committee Spring 2014
Alignment of Part 4B with ISAE 3000
Quality guidelines on impurities
Presentation transcript:

ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons Accuracy requirements of ISTB-3500 Digital vs Analog Suction pressure accuracy relative to DP accuracy Smooth-running pump vibration criteria ISTOG submitted inquiries to ASME ISTB Committee related to the first two items above – this presentation will discuss the responses to those inquiries and follow-up activities. Also, recent experiences with NRR on Relief Requests on the second and third items above will be discussed, with recommendation to ASME ISTB for possible action

ISTOG Winter 2010 – Ed Cavey Fermi 2 2 ISTOG Issues - Code Inquiries / Proposed Code Cases Accuracy requirements of ISTB-3500 Digital vs. Analog This item generated a very animated discussion during the January ISTOG meeting. The problem lies with the following wording in ISTB-3510(a). For individual analog instruments, the required accuracy is percent of full-scale. For digital instruments, the required accuracy is over the calibrated range. Consider the following from NUREG-1482 Section 5.5: For Group A and Group B pumps, OM Subsection ISTB 3510 requires an accuracy of +/- 2% of full scale for analog instruments, +/- 2% of total loop accuracy for a combination of instruments, or +/- 2% of reading over the calibrated range for digital instruments.

ISTOG Winter 2010 – Ed Cavey Fermi 2 3 ISTOG Issues - Code Inquiries / Proposed Code Cases Accuracy requirements of ISTB-3500 Digital vs. Analog (cont’d) ISTOG submitted the following inquiry in 2010 Inquiry Code Edition: ASME OM Code 1998 and later Editions and Addenda Question 1: Is it the intent of ISTB-3510(a) that the required accuracy of digital gauges be expressed as "percent of reading"? Answer: No Question 2: Is it the intent of ISTB-3510(a) that the required accuracy of digital gauges be expressed as "percent of maximum calibrated value"? Answer: Yes.

ISTOG Winter 2010 – Ed Cavey Fermi 2 4 ISTOG Issues - Code Inquiries / Proposed Code Cases ASME OM CODE 2009 EDITION ISTB-3500 Data Collection ISTB-3510 (a)Accuracy. Instrumentation accuracy shall be within the limits if Table ISTB If a parameter is determined by analytical methods instead of measurement, then the determination shall meet the parameter accuracy requirement of Table ISTB (e.g., flow rate determination shall be accurate to within ± 2% of actual). For individual analog instruments, the required accuracy is percent of full-scale. For digital instruments, the required accuracy is over the calibrated range. For a combination of instruments, the required accuracy is loop accuracy. (b)Range. (1)The full-scale range of each analog instrument shall be not greater that three times the reference value. (2)Digital instruments shall be selected such that the reference value does not exceed 90% of the calibrated range of the instrument. (3)Vibration instruments are excluded from the range requirements of subparas. ISTB-3510(b)(1) and ISTB-3510(b)(2). PROPOSED CODE CHANGE Based on the ISTOG Inquiry the following proposed Code change was drafted

ISTOG Winter 2010 – Ed Cavey Fermi 2 5 ISTOG Issues - Code Inquiries / Proposed Code Cases Accuracy requirements of ISTB-3500 Digital vs. Analog (cont’d) Of particular significance was the following statement in the response – It was never the intent of the Code Committees to require higher calibration accuracy for digital instrumentation than for analog instrumentation. The question now is how current IST engineers can deal with this issue. What can be cited as a reference? It will be many years before this Code change can become useful. Would a guidance standard from ISTOG that describes the decision of the ISTB Committee be an adequate citation source in the interim?

ISTOG Winter 2010 – Ed Cavey Fermi 2 6 ISTOG Issues - Code Inquiries / Proposed Code Cases Suction pressure accuracy relative to DP accuracy This issue covers all the scenarios where either direct or indirect measurement of pump suction pressure is done using instruments which can meet Group A/B +/- 2% accuracy but not the CPT ½% accuracy. The fundamental concept is that IF the resulting value of DP is accurate to within +/- ½% it should not matter what the accuracy of the suction pressure measurement was. Inquiry Code Edition: ASME OM Code 1998 and later Editions and Addenda Question: Is it within the intent of ISTB-3510(a) and Table ISTB that a combination of gauge accuracies may be used as long as the resultant DP value is accurate to within the requirements of ISTB Reply: Yes

ISTOG Winter 2010 – Ed Cavey Fermi 2 7 ISTOG Issues - Code Inquiries / Proposed Code Cases Suction pressure accuracy relative to DP accuracy (contd) Alternative Inquiry / Response as Code Case Code Edition: ASME OM Code 1998 and later Editions and Addenda Question: What alternative to the instrument accuracy requirements in ISTB- 3510(a) may be used when measuring differential pressure of a pump with separate suction and discharge pressure instruments? Reply: The individual suction and discharge pressure instrument accuracies in Table ISTB need not be met as long as the resultant DP measurement meets the accuracy requirement of Table ISTB The accuracy of the derived DP value shall be calculated as the square root sum of the squares of the individual suction and discharge pressure accuracies expressed as +/- psi.

ISTOG Winter 2010 – Ed Cavey Fermi 2 8 ISTOG Issues - Code Inquiries / Proposed Code Cases Suction pressure accuracy relative to DP accuracy (contd) ISTB RESPONSE - INTENT PORTION Question: Is it the intent of ISTB-3510(a) General, that an individual instrument used for suction pressure that does not meet the requirements of Table ISTB can be used provided the resultant DP determination meets the accuracy requirement of Table ISTB (Required Instrument Accuracy). Reply: Yes Question: Is it the intent of ISTB-3520(b) Differential Pressure, that one of the individual instruments used to determine differential pressure by taking the difference in pressure between the pressure at a point in the inlet (e.g., suction pressure) and a point in the discharge pipe not meet the requirements of Table ISTB provided the resultant DP determination meets the accuracy requirement of Table ISTB (Required Instrument Accuracy). Reply: Yes

ISTOG Winter 2010 – Ed Cavey Fermi 2 9 ISTOG Issues - Code Inquiries / Proposed Code Cases Suction pressure accuracy relative to DP accuracy (contd) The responses from ISTB show that, as far as the intent, it is the DP value which is the critical measurement. Use of a highly accurate discharge pressure gauge can offset a lower accuracy suction pressure – as long as the resultant DP value meets the ½% requirement. This Code change would eliminate the need for relief which several plants now have to submit. It would also allow for the use of existing plant analog gauges where the use of a temporary digital gauge installation is exceedingly difficult. Again – need to consider how this can be made useful to ISTOG members in the short term. A Code Case may be desirable but still involves a separate wait for a Reg Guide update. An ISTOG guidance standard may not be appropriate for this issue since it is tied to such specific wording in the Code. Thoughts????

ISTOG Winter 2010 – Ed Cavey Fermi 2 10 ISTOG Issues - Code Inquiries / Proposed Code Cases Smooth-running pump vibration criteria There have been many relief requests submitted and approved over the last few decades on this issue. The technical concern is that pumps/motors with exceptionally low baseline vibration data will have correspondingly low Alert criteria. Here is an example from Fermi: R3001C008 Diesel Generator 14 Service Water Pump EC1 baseline vibration (> pump/motor replacement) => ips Alert criteria = * 2.5 =.022 ips Our vibration acquisition equipment is accurate to app. +/-.019 ips. You can see that we could have a measurement which is at or near Alert criteria due solely to instrument and/or test flow variation, with no corresponding pump/motor degradation.

ISTOG Winter 2010 – Ed Cavey Fermi 2 11 ISTOG Issues - Code Inquiries / Proposed Code Cases Smooth-running pump vibration criteria (cont’d) The typical relief request approved by the NRC provides for establishing a bottom threshold of 0.05 ips for a baseline reading. The acceptance criteria for all points with a baseline < 0.05 ips would be (2.5x) and (6x). Fermi recently received approval for relief on this subject, however we proposed a 0.04 ips minimum baseline. That was based on evaluation of all low baseline pumps/motors, with the majority well under 0.04 and only a few between 0.04 and Obtaining this relief typically requires commitment to provide coverage of these components under effective PM/PdM programs. The use of 0.04, with minimum Alert / RA limits of and 0.240, as the Fermi standard versus the traditional 0.05 provided additional conservatism that seemed to offset NRC concerns about potential lack of early degradation.

ISTOG Winter 2010 – Ed Cavey Fermi 2 12 ISTOG Issues - Code Inquiries / Proposed Code Cases Smooth-running pump vibration criteria (cont’d) ISTOG and ASME ISTB should work together to provide for a Code change or Code Case which addresses this issue and eliminates the need for such redundant relief requests. Any ideas on how best to proceed on this topic?

ISTOG Winter 2010 – Ed Cavey Fermi 2 13 ISTOG Issues - Code Inquiries / Proposed Code Cases In summary, ISTOG will continue to: Gather innovative testing ideas from around the industry Identify common areas of Code implementation difficulty Then Draw upon the collective knowledge and experience of our membership to study these issues and develop technically sound guidance standards and/or recommendations and inquiries to ASME QUESTIONS?????