EXAMPLE FEP REPORT – Flow Erosion Assessment Program Investigation Report – May 2009 EIMAGING POWER GENERATION.

Slides:



Advertisements
Similar presentations
An Introduction To Marine Steam Propulsion Plant [Source: US Navy]
Advertisements

Main Condensate & Feed Systems
Steam and Water Accessories
OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Main Steam Cycle Let the fun begin….
Boilers Dept. of Mech & Mfg. Engg..
WHO - PSM Water –part 3 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija Hietava M.Sci.Pharm Quality Assurance.
Testing steam traps using airborne ultrasound inspection
Pipe Supports and Hangers
Material Tour of Boiler - Catastrophic Failures of Boiler Components Presented by George W Galanes, P.E. Metallurgical Consulting Engineer Diamond Technical.
3-D visualization streamlines flow- accelerated corrosion and other nuclear plant inspection programs Costantino Lanza, CEO INOVx Solutions, Inc.
Feedwater System Reliability Users Group 2015 Meeting San Antonio James Alston – South Texas Project Rob Frazee – South Texas Project Frank Todd – True.
Measures for containing an increase in pipes’ dose-equivalent rate in the hydrogen-injected environment at the Shimane Nuclear Power Station Unit 1 1 Tomohiro.
Bachelor Degree in Maritime Operations (BMO)
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Superheaters.
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
Geochemistry and Water Quality Volume III: Seepage and Water Quality for Recliamed Tailings Containment Area – Lupin Operation Presentation to; The Nunavut.
Gas Transmission Pipelines
Walter G Bischoff Brunswick station Duke Energy
Pipe Supports and Restraints
Steam Power Plant.
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
2 July Turbine Condensate System
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
POWER PLANT.
Boiler Tubes.
Free PowerPoint Backgrounds Heat Rate Improvement Conference February 5-7, 2013 Scottsdale, Arizona.
Heat exchangers The device at which heat exchange between two fluids at different temperatures and separated by a solid wall occurs is called heat exchanger.
Lesson 7 Steam Power Plant.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Mechanical for Oil Heat
Designing an Internal Corrosion Program NACE Eastern Area Conference Roy D. Fultineer Jr.
Main Steam Cycle References Required – Introduction to Naval Engineering (pg 41-48) Recommended – Principles of Naval Engineering ( )
Control of Particulate Matter from a Sabatier Catalyst Bed HSL 126 Loel Goldblatt, Hamilton Sundstrand Space Systems International, Inc. Karen Murdoch,
Chapter 22 Industrial Process Piping. Learning Objectives After completing this chapter, you will –Describe different types of pipe and their respective.
Quantifying Cycle Isolation Losses and Integration with On Line Systems Feedwater System Reliability Users Group 2015 Meeting San Antonio Ken Porter Rich.
STUDY OF BOILER’S ACCESSORIES
Clean and Pure steam in the Biopharm industry
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Presented at Canadian National Committee IAPWS Workshop, Toronto
NFPA 31 Standard for the installation of Oil- Burning Equipment
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
CANDU Owners Group Inc. “Strength Through Co-operation” 1 COG R&D Program Overview Presented to CNC IAPWS Workshop I Hey Program Manager May 2009 PROTECTED.
Estimation of Flow Accelerated Corrosion (FAC) in Process Piping Using CFD Software and Low Temperature Experimental Determination of FAC.
Nuclear Thermal Hydraulic System Experiment
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To :- NITESH SONI.
KOTA SUPER THERMAL POWER STATION ,KOTA
Steam Boilers and There Application By: Matt Hunt Date: November 2, 2005 Objective: to inform on the basic functions of a steam boiler and some of there.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Seminar Report On KOTA SUPER THERMAL POWER STATION Submitted in partial fulfilment for the Award of degree of BACHELOR OF TECHNOLOGY In Electrical Engineering.
Prepared by : Nishant .A. Raval
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
DEAERATOR-STAGE-II/TPS-II /NLC INDIA LTD
Lesson 7 Steam Power Plant.
Review Questions Chapter 5
Unit 37: Fluid containment Dr
DELTAK HEAT RECOVERY STEAM GENERATOR
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
Unit 37: Fluid containment Dr
Material Tour of Boiler - Catastrophic Failures of Boiler Components
TO PRESENTATION ON SUPERCRITICAL BOILER
PRODUCTS (POWER PLANT)
Corrosion Part 3 Corrosion Protection Methods
R. B. Vilim Argonne National Laboratory
Piping and Instrumentation for Process Industries
WATER AND STEAM SYSTEM.
Gas Transmission Pipelines
Presentation transcript:

EXAMPLE FEP REPORT – Flow Erosion Assessment Program Investigation Report – May 2009 EIMAGING POWER GENERATION

Follow-up Assessment – March 2009 Address: 132 Lakeshore Drive, Wheatley, ON N0P 2P0 Tel.: (519) General Manager:Plant Engineer: Operations Manager: Maintenance Manager: Configuration: 2 X 2 X 1 Plant Baseload Capacity: 662 MW Plant Peak Capacity: 692 MW Plant Construction Date: April 1999 Plant Commercial Operation Date: February 2002 Design Engineer: Construction Contractor: Construction Method: HRSG Supplier: Combustion Turbine Supplier: Steam Turbine Supplier: Pipe Support Supplier: PLANT INFORMATION Last Inspection Date: No Previous Inspections Conducted

FEAP – Flow Erosion Assessment Program 3 EIMAGING POWER GENERATION EXAMPLE FEP INVESTIGATION REPORT MAY 2009 Flow-Accelerated Corrosion (FAC) Inspections Flow-accelerated corrosion is a function of water chemistry, operating process temperatures, fluid bulk velocities, pipe material and piping geometry. Feedwater pipe operating in the range of 175-deg to 500-deg are susceptible and feedwater systems in range of 200-deg to 350-deg are particularly susceptible. In addition, low-pressure steam piping that operates at or near saturation, or is at risk of two-phase flow, may be exposed to FAC conditions. Click here (slides 99 – 106) for additional program descriptions.here The FAC inspection program is designed to be an on-going assessment initiative consisting of evaluating historical data collected from plant records and identifying areas for investigation. In review of the plant’s operating conditions in the boiler feedwater system, a Flow Accelerated Corrosion Inspection program should be initiated and conducted at bi-annual intervals in the areas identified in the following slides: click here (slides 107 thru 129), for FAC program inspection locations.here

4  Chemical build-up of protective magnetite [black oxide] (Fe3O4) layer on carbon or low-alloy steel – direct function of dissolved oxygen levels in process flow.  Magnetite layer begins to dissolves into a stream of flowing water (single phase flow) or a water-steam mixture (two phase flow).  The pH-level at temperature and the level of dissolved oxygen in the stream influence the stability and solubility of the magnetite oxide layer.  If the oxidation reduction potential (ORP) is negative, a reducing environment exists that can reduce or eliminate the magnetite protective oxide layer that leads to FAC  Trend to over-treat water with excessive oxygen-scavengers in de-aeration process can accelerate FAC EROSION-CORROSION PRINCIPALS IN POWER PIPING EIMAGING POWER GENERATION EXAMPLE FEAP INVESTIGATION REPORT MAY 2009 FEAP – Flow Erosion Assessment Program 4

5 GRID TYPE DESIGNATION/ INSPECTION MAPPING ARRANGEMENT FLOW-ACCELERATED CORROSION INSPECTIONS FLOW EROSION ASSESSMENT PROGRAM INSPECTION GRID IDENITFICATION AND ARRANGEMENTS – SHT 1 OF 4 EIMAGING POWER GENERATION EXAMPLE FEAP INVESTIGATION REPORT MAY 2009 FEAP – Flow Erosion Assessment Program 5

6 GRID TYPE DESIGNATION/ INSPECTION MAPPING ARRANGEMENT NOTES: 1.Grid width descriptions: the designations in the grid boxes identify number of test points in the pipe circumferential orientation and spacing between points. For instance, 1.00” indicates 5 test points spaced 1.00-inches apart 2.Lengths in the “longitudinal spacing” field identify the spacing of test points. For instance, if the spacing is 1.00”, and the “L” is called out at 8.00”, the number of test points will be nine in the pipe longitudinal direction. 3.Circumferential grid dimensions are based on total wall mapping of approximately 120-degree on the pipe circumference. The center of the 120-degree arc is identified on the system isometrics. 4.For grid type “GRD-A2” (elbows), the elongated grid extends along 60-degrees of the elbow sweep and beyond the elbow-weld through “L” inches. Grid type “GRD-A2” may also be specified for upstream end of elbows. EIMAGING POWER GENERATION EXAMPLE FEAP INVESTIGATION REPORT MAY FEAP – Flow Erosion Assessment Program 6 FLOW-ACCELERATED CORROSION INSPECTIONS FLOW EROSION ASSESSMENT PROGRAM INSPECTION GRID IDENITFICATION AND ARRANGEMENTS – SHT 3 OF 4

7 GENERAL ARRANGEMENT HRSG 1 Boiler Feedwater Drawing No. M00-00 EIMAGING POWER GENERATION EXAMPLE FEAP INVESTIGATION REPORT MAY FEAP – Flow Erosion Assessment Program 7

8 HRSG 1 Boiler Feedwater Drawing No. M-117 Sht. 1 EIMAGING POWER GENERATION EXAMPLE FEAP INVESTIGATION REPORT MAY 2009 FEEDWATER SUCTION LOCATIONS From LP Drum to Pump A LOCATION GRID TYPE QUADNPSDIM “L”COMMENTS FAC-BFW-101GRD-A227012”10”Includes elbow weld and downstream run pipe FAC-BFW-102GRD-A218012”10”Includes elbow weld and downstream run pipe FAC-BFW-103GRD-B2012”8”Branch pipe; one side FAC-BFW-104GRD-A2012”10”Includes elbow weld and downstream run pipe FAC-BFW-105GRD-C30, 18012”10” Includes valve outlet weld and downstream run pipe, two sides opposite FAC-BFW-106GRD-A227012”10”Includes elbow weld and downstream run pipe FAC-BFW-102 FAC-BFW-104 FAC-BFW-103 Connection PUMP A: 1FW01PA FAC-BFW-105 FAC-BFW-106 FAC-BFW ” NPS 8 FEAP – Flow Erosion Assessment Program 8