CMIA CONFERENCE ON 14 TH SEP, 2013 AT AURANGABAD ASHOK PENDSE, TBIA.

Slides:



Advertisements
Similar presentations
…Message Box ( Arial, Font size 18 Bold) Presentation Title ( Arial, Font size 28 ) Date, Venue, etc..( Arial, Font size 18 ) Suggestion/Objections to.
Advertisements

Efficient Pricing of Energy Conservation and Load Management Programs. August 9 th,2006 Kansas Corporation Commission Staff.
Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
Fight of Common Man - For his Right towards Affordable Electricity “My Home India – An NGO” Parag Deodhar.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Role of a Stock Exchange in buying and selling shares?
Power Factor: What Is It and Estimating Its Cost Presented by:Marc Tye, P.E APPA Business & Financial Conference September 21, 2004.
Overview of the latest developments of the Hungarian energy market Mr. György Hatvani Deputy State Secretary of energy and industry Ministry of Economy.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
Economics of Power Generation Lecture 6. “”The art of determining the per unit (i.e., one kWh) cost of production of electrical energy is known as economics.
Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Prayas Energy Group, India Regulatory process to enhance transparency and accountability: examples from India Bishkek, September 2011 Presentation By Prayas.
SOLAR RENTING (PTY) LTD WHY SHOULD A CUSTOMER BUY SOLAR, IF HE CAN RENT? THEY CAN RATHER USE THEIR MONEY TO MAKE MONEY!
RELATED Party TRANSACTIONS (section 188). Related Party Means 1. Director 2. Director’s Relative 3. KMP 4. KMP’ s Relative Private Company Where Director/
M.V. Damania & Co. Chartered Accountants Nilay Shah || Arpita Gadodia.
RELATED PARTY TRANSACTION
  Provides information on what a company does, its financial performance, as well as its plans for the future  Companies with more than $10 Million.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
Electricity Reforms in Bangladesh
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
The U.S. and Global Economies CHAPTER 2 C H A P T E R C H E C K L I S T When you have completed your study of this chapter, you will be able to 1 Describe.
Innovative approach to DSM through Open Access Jayant Deo MD & CEO, Indian Energy Exchange
Republic of India is a Neighbour of China Most Populous Countries. It is No.2. China is No. 1. It has unique history of Political stability and a Socialistic.
Submitted to Southeast Symposium on Contemporary Engineering Topics (SSCET) New Orleans, LA - August 31.
Emerging Transco’s -The New Role Managing Director Karnataka Power Transmission Corporation Ltd., Bangalore, Karnataka.
CONSUMER CHARTER & CUSTOMER PARTICIPATION ASHOK PENDSE MUMBAI GRAHAK PANCHYAT.
International Accounting Standard 1 Presentation of Financial Statements Yousef ElMudallal Part 2.
PRESENTATION ON ON : TOTAL INSTALLED CAPACITY OF INDIA AS ON 31/03/2001 1,01,630 MW INSTALLED CAPACITY OF INDIA (THERMAL) 61,026 MW INSTALLED CAPACITY.
Prayas Energy Group, India Transparency in Electricity Service Delivery: Billing, Quality of Service and consumer issues Bishkek, September 2011 Presentation.
Need of AS on Related Party Transactions  There is general presumption that transaction reflected in the financial statements are executed on arm’s-length.
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
MIXED ECONOMY. A market economy primarily based on private enterprise where the government, however, plays an important role in regulating the system.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Mr Abdulai Munkaila. TQM Total = Whole Quality = Meeting/exceeding customer requirements and expectations Management= Process of achieving goals by working.
1 11-SOCIAL MARKETING. ACUTE POWER SHORTAGE IN INDIA, WITH PARTICULAR REFERENCE TO MAHARASHTRA & MUMBAI.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
Solar energy at Uniworld Gardens 400kW to provide back up power
Supporting Right To Education Campaign Prashant Jawalikar.
S OCIAL S ECURITY AND H EALTH C ARE LECTURE – ISSUES In the U.S., persons 65 years or older number more than 12% of the population—that is close to one.
Cement Manufacturers’ Association Special Meeting of Standing Linkage Committee (Long Term) for Power, Sponge & Cement Sectors Emphasis on Supply of Domestic.
Presentation to Select Committee on Economic Development
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
Electricity pricing Tariffs.
Smart Grid Schneider Electric Javier Orellana
The Role of Tax Policy in a functioning Economic and Monetary Union Panel discussion Giampaolo Arachi Università del Salento European Economic and Social.
EXPERIENCE SHARING OF AGDSM PROJECT AT CESC MYSORE Shri M. Muniraju Chief Engineer Chamundeshwari Electricity Supply Corporation Limited (CESC), Mysore.
INCREASING THE DIALOGUE BETWEEN SCIENTISTS, POLICY MAKERS AND STAKEHOLDERS SUBERNAREKHA RIVER BASIN, INDIA SOCIO-ECONOMIC ISSUES AND POLICY OPTIONS RAMESH.
PRESENTATION ON TARIFF POLICY By S.R.SETHI DIRECTOR (OPRS) DELHI TRANSCO LTD.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
Local government`s engagement with bioenergy
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
HAJ TRAVEL REFORMS HAJ PILGRIMS MANAGEMENT PROPOSAL
STATE ENERGY AND WATER REGULATORY COMMISSION
Political Economy of Electricity
INTRODUCTION TO MATERIALS
Gurugram – Energy Issues
Presentation transcript:

CMIA CONFERENCE ON 14 TH SEP, 2013 AT AURANGABAD ASHOK PENDSE, TBIA

CHALLENGES BEFORE INDUSTRY IN RESPECT OF ELECTRICITY TARIFF

TARIFF When the electricity tariff is substantial with respect to cost of production it makes large impact. Eg:- Metal processing, Plastic, Ice, The Case of Ice factory The Case of Dubai

TARIFF COMPARISON NOV ’12

INDUSTRIAL CONSUMPTION OF MSEDCL(MU) FOR 13-14

INDUSTRIAL CONSUMPTION OF MSEDCL(MU) FOR 14-15

INDUSTRIAL CONSUMPTION OF MSEDCL(MU) FOR 15-16

TARIFF As it can be seen almost 40% of consumption comes from industry, which contributes to largest chunk of Rs. 9000/- crores cross subsidy and hence, MSEDCL and GOM should be concerned about health of industry.

WHY THE TARIFF IS HIGH? YEAR POWER PURCHASE COST (Rs. Crores) Average Revenue requirement (Rs. Crores) Power purchase cost (%) 71%82%85% Average cost of supply (Rs/Unit)

POWER PURCHASE SCENE MURs/UnitMURs/UnitMURs/Unit MSPGCL NTPC NPCIL RGPPL JSW MUNDRA ADANI INDIA BULLS CAPTIVE TRADERS

POWER PURCHASE SCENE YEAR MSPGCL42%41%43% NTPC + NPCIL25%22%21% JSW + MUNDRA + ADANI + INDIA BULLS + CPP + TRADERS 20%26%23% OTHERS13%11%13%

POWER PURCHASE SCENE Hence, the power purchase from MAHAGENCO is quite high than the market scene. Also, it constitutes almost more than 40% power purchase. So the question comes, what is happening in MAHAGENCO? There are three sets of stations :- 1) Older Stations 2) Stations synchronized in & ) Stations which are likely to come in & 14-15

OLDER STATIONS YEAR13-14 Net Gen. (MU’s) ARR (Rs.Crores) Bhusawal Chandrapur Nasik Koradi Parli Khaperkheda Total Rs. 3.33

RECENT STATIONS Net Gen. (MU’s) ARR (Rs. Crore) Paras 3& Parli 6& Khaperkheda Total Rs.4.44/ Unit

UPCOMING STATIONS & 14-15Rs/Unit Bhusawal 4500MW4.26/- Bhusawal 5500MW4.28/- Chandrapur 8500MW5.09/- Parli 8250MW4.71/- Koradi 8660MW5.22/-

POWER PURCHASE SCENE Hence it can be seen that all the recent and upcoming stations of MAHAGENCO is the major issue as far as unit rate is concerned. It is worth going to market and buying power rather than buying it from MAHAGENCO.

CAPITAL EXPENDITURE OF MSEDCL For feeder separation Rs.2000 Crores already spent. Hence the demand has been controlled. It virtually means load shedding being done through agricultural pumps. So far about Rs.3500 Crores have been spent. Whereas the total outlet is about Rs Crores. The main objectives of Capex are :- 1) Improvement in the quality of supply. 2) Reduction in loss. 3) Catering to increased demands to existing customers. 4) Meeting the demand of newer customers.

PASSIVE ROLE Stay with MSEDCL, and pursue reduction and minimum increase in the tariff for present and future years. To do this :- A) Participate in public hearing and specific hearing of not only MSEDCL but also generation. B) With the help of media, newspapers, forums, etc. bring to the notice of common man regarding high electricity tariff. C) Bring to the notice of the govt. the unviable tariff of industry as compared to other states. D) Make efforts with MERC to bring down the open access limit from 1MW to 100 KVA.

ACTIVE ROLE Go away from MSEDCL, The two choices : A) Captive power plant. B) Open Access. There are four components which need to be addressed in both the cases: 1) Power purchase cost 2) Wheeling charges 3) System Loss 4) Cross subsidy surcharge In case of captive CSS is not applicable.

CAPTIVE POWER PLANT “Captive generating plant” means a power plant set up by any person to generate electricity primarily for his own use and includes a power plant set up by any co- operative society or association of persons for generating electricity primarily for use of members of such cooperative society or association of person 13 “company“ means a company formed and registered under the Companies Act, 1956 and includes anybody corporate under a Central, State or Provincial Act; (49) “person” shall include any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person

CAPTIVE POWER PLANT i) not less than twenty six percent of the ownership is held by the captive user(s), and (ii) not less than fifty one percent of the aggregate electricity generated in such plant, determined on an annual basis, is consumed for the captive use: Provided that in case of power plant set up by registered cooperative society, the conditions mentioned under paragraphs at (i) and (ii) above shall be satisfied collectively by the members of the cooperative society: Provided further that in case of association of persons, the captive user(s) shall hold not less than twenty six percent of the ownership of the plant in aggregate and such captive user(s) shall consume not less than fifty one percent of the electricity generated, determined on an annual basis, in proportion to their shares in ownership of the power plant within a variation not exceeding ten percent

CAPTIVE POWER PLANT Three points emerge: 1) All put together 26% equity minimum 2) They must consume minimum 51% generation 3) The consumption should be proportional to equity, in a financial year, with (+/-10%) variation allowed.

CAPTIVE POWER PLANT Eg:1 Consumer 1 6% Equity6 / 26 = 23% Equity 51 x 0.23 = 11.73% generation – Consumer 2 5% Equity5 / 26 = 19.2% Equity 51 x = 9.79% generation – 8.81 Consumer 3 6% Equity5 / 26 = 19.2% Equity 51 x = 9.79% generation – 8.81 Consumer 4 6% Equity5 / 26 = 19.2% Equity 51 x = 9.79% generation – 8.81 Consumer 5 6% Equity5 / 26 = 19.2% Equity 51 x = 9.79% generation – % Equity%Equity distribution Generation distribution Variation allowed

CAPTIVE POWER PLANT Eg:2 Consumer 151% Equity6 / 26 = 51% Equity 51% generation 45.9 – 56.1 Consumer 25% EquityNo relevance Consumer 36% EquityNo relevance Consumer 47% EquityNo relevance Consumer 58% EquityNo relevance

TO CONCLUDE If you stay with MSEDCL then go to passive role to control the cost. If you go away from MSEDCL do active role, one of them is captive power plant.