PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.

Slides:



Advertisements
Similar presentations
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
Systems Engineering Management
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
Narrative reporting: good practices. Joint Technical Secretariat Seminar for Beneficiaries February 2012 Narva, Estonia.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
1 Overview of the NF 1680 Evaluation of Performance Process Overview/Training Charts April 7, 2008.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Peer Review Agenda (Suggested).
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Presentation transcript:

PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch

PACS IHDR 12/13 Nov 2003 IBDR Close-out2 IBDR Board Conclusions Instrument Design and Internal Interfaces –The Board considers the instrument design and internal interfaces as consolidated and under basic configuration control for the FPU with the exception of the bolometer chain (in particular BOLA) –The status of the Warm Boxes is less satisfactory (in particular DEC/MEC and OBSW documentation). EMC and grounding scheme need to be addressed with no delay. Reliability analyses are still missing External Interfaces –The Board does not consider the interfaces to the spacecraft fully consolidated, however it sees these issues properly identified and expects industry to take the lead and to close out the pending issues with no delay

PACS IHDR 12/13 Nov 2003 IBDR Close-out3 IBDR Board Conclusions AIV and GSE –The model philosophy and verification approach need to be consolidated. Manufacturing flow charts need to be issued Schedule –The Schedule remains highly critical and PACS needs to establish means to ensure close monitoring and follow-up with subsystems Summary –While the Board considers that formally not all objectives of the IBDR have been fully met, it sees no need for a delta review –The Board expects the issues raised in the recommendations in this report, as well as in the comments transmitted to PACS prior to the review, to be addressed and resolved in the timeframe given in the recommendations, and … well in advance of the next review

PACS IHDR 12/13 Nov 2003 IBDR Close-out4 Board Recommendations R1: To ensure a coherent system approach, an agreed set of documents and a documentation tree shall be established between PACS system and subsystems and with ESA and Industry in the timeframe of the spacecraft PDR. We did our best – but far away from perfect

PACS IHDR 12/13 Nov 2003 IBDR Close-out5 Board Recommendations R2: Ensure schedule stability and close monitoring of subsystem activities to retain, and possibly advance delivery dates. In particular, test sequences need to be optimised while still ensuring full characterisation. As much as possible overall logistics/transportation shall be optimised. Procurement of long lead and/or single supplier items shall be monitored carefully. This is regarded as ongoing work. Schedule stability hard to achieve (no margins allowed), advance of delivery dates impossible Duration of ILT cut to absolute minimum (6 months)

PACS IHDR 12/13 Nov 2003 IBDR Close-out6 Board Recommendations R3: Provide all means to close out open interface issues, and to freeze the interfaces with the spacecraft before the PDR. Requirements defined from PACS side. Frequent communication with S/C contractor, progress has been made Still some important I/F requirements not agreed at time when PACS QM hardware has already been built!

PACS IHDR 12/13 Nov 2003 IBDR Close-out7 Board Recommendations R4: Ensure that a Derating and Worst Case Analysis has been properly conducted prior to manufacturing. Input for some subunits available Open – system approach not achieved; for some subunits only foreseen for QM/FM (contract constraints)

PACS IHDR 12/13 Nov 2003 IBDR Close-out8 Board Recommendations R5: System analyses, FMECA and FDIR should be performed jointly by system engineering with PA Based on available FMECA (input from subsystems), first version of system FDIR available Input from some subsystems only after AVM (see R4)

PACS IHDR 12/13 Nov 2003 IBDR Close-out9 Board Recommendations R6: Ensure and closely monitor appropriate PA approach at subsystem level and close communications between system and subsystem PA. Investigate ways of optimising/(re)distributing the PA work between system and subsystems. Progress made with some subsystem suppliers System-wide approach not yet achieved Some partners still have to be convinced – we’ll try again for FM

PACS IHDR 12/13 Nov 2003 IBDR Close-out10 Board Recommendations R7: Perform full signal detector (bolometer/ photoconductor + electronics) chain performance measurements as early as practically possible. This is considered normal work of highest priority Operation of photometer chain demonstrated –Bolometer focal plane array + multiplexer + buffer + BOLC –No meaningful noise measurements due to contact problem in 2K buffer unit Progress in spectrometer chain –Parallel operation of 7 photoconductor modules with CREs and active shield drivers in lab electronics achieved –Verification of full chain (including DECMEC) only at IL tests possible –Noise of QM CREs above spec (at least for blue array)

PACS IHDR 12/13 Nov 2003 IBDR Close-out11 Board Recommendations R8: Ensure early QM tests to feed back into FM programme. Perform low temperature testing as earlier as possible. Investigate ways to test the 48- hour baseline autonomy and cooler recycling in view of the PACS cryostat hold time limitation of 10 hours. The planning should be completed in the timeframe of the spacecraft PDR Qualification at QM subunit level advanced –Operation/characterisation of detector chains –Cryo-qualification of mechanism, mechanism control Test cryostat design modified for extended operation Planning complete, but subject to shifts/delays due to highly success-oriented schedule Feedback for FM limited by schedule constraints

PACS IHDR 12/13 Nov 2003 IBDR Close-out12 Board Recommendations R9: Identify a clear model philosophy and FPU simulators to support coherently the development of the instrument from unit to system level, and ensure that all AVM units will be form fit and function for the AVM and EQM system level tests Closed – SPU, DECMEC, BOLC only fit and function (RFD). Simulation modes built into DECMEC and BOLC

PACS IHDR 12/13 Nov 2003 IBDR Close-out13 Board Recommendations R10: Ensure proper documentation of OBSW for DPU, SPU and DEC/MEC. In particular the Software Specification Document (SSD) shall be updated to reflect the actual status of development and testing. This should be completed in the timeframe of the relevant tests Closed –SSDs available –SVVPs available for SPU, DPU Open – DECMEC SVVP

PACS IHDR 12/13 Nov 2003 IBDR Close-out14 Board Recommendations R11: Assess the thermal impact of cooler recycling operations Closed – thermal model of photometer unit including cooler available, input provided to S/C thermal model Results of thermal modeling by S/C contractor alarming – not only L1 but also L0 show noticeable variability over days after recycling / instrument switching

PACS IHDR 12/13 Nov 2003 IBDR Close-out15 Board Recommendations R12: Define and include into the overall test plan a few sensible “degraded” modes of operations in order to provide some level of insurance in case of post- launch failure of a major unit/component Closed – integrated in Operational Modes Document –Chopper –Grating –Filter wheels Open – inclusion in test plan

PACS IHDR 12/13 Nov 2003 IBDR Close-out16 Board Recommendations R13: Define and plan OBSW (DPU, SPU, DEC/MEC) performance tests in order to supplement the functional tests currently carried out Ongoing work – all nominal data rate modes tested Final test of burst mode pending

PACS IHDR 12/13 Nov 2003 IBDR Close-out17 Board Recommendations R14: Assess impact of microvibrations on the grating assembly Progress – bearings show now degradation after cryovibration, in fact, friction torque reduced Impact of microvibrations on position accuracy still to be evaluated quantitatively. (Performance tests on lab bench without vibration isolation are within spec)

PACS IHDR 12/13 Nov 2003 IBDR Close-out18 Board Recommendations R15: Assess all the implications (instrument design, OBSW and ground processing) of the implementation of the PACS-SPIRE parallel mode; in particular a full assessment of the impact on autonomy and FDIR should be performed. PACS is operating as prime instrument and requires no service from S/C other than in regular prime mode No additional OBSW or ground processing capabilities needed FDIR of PACS as prime instrument fully applicable