CITY POWER PLANT IN TŘEBÍČ
The first power plant was built on the municipal meadow on Polanka the area of which was 3200 m 2, from by organization Ganz and Inc & Co. Electrical lamps were first switched on in Earlier lighting was very bad. Power from the factory‘s dynamo was regular with voltage 120V. This condition lasted until 1931,when Baťa bought „borovinské závody“.He had to install new power plant because all of his machines were for voltage 220V. Třebíč was one of the first towns where a power station was built. Its power of 350kW looked superfluous because the number of houses was too small.
Position of power plant in Polanka
Some people didn´t trust electricity at the beginning and they weren´t interested in connecting the electricity with their homes. They protested that the electric current was dangerous, because it started the fires. And its installation was too expensive. From the town Třebíč built a water power plant in the „Poušův mlýn“.According to the agreement the water power plant cooperated with the existing power plant. Consumtion of electicity rose very fast until The power station produced enough electricity for Třebíč and villages in the area – Podklášteří and Jewish town
In 1927 the consuption of electricity was about 110% higher than in 1919 The nationalization of the energy industry took place in 1945 and construction of the trafostation in the registration place of Řípov led to connection of electricity in Třebíč´s steam power plant lost its purpose and was cancelled.
100 years ago Now
Milan Kautský Vojtěch JahodaL2 Zdeněk Soukop Portrait of old Třebíč – Jiří Joura Photographs - pan M. Maloušek