GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.

Slides:



Advertisements
Similar presentations
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
Gayle K. Martin November 14, 2016
I&T&C Organization Chart
GLAST Large Area Telescope:
Environmental Test Planning
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Integration and Test Organization Chart
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
Design Integration and Analysis
Presentation transcript:

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC Neil Johnson Michael Lovellette, Test Director NRL Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 2 Purpose / Contents  Demonstrate readiness to proceed with EMI/EMC testing of the integrated flight instrument, i.e. the LAT: –Test requirements are complete –LAT has been appropriately tested at lower levels of assembly –Passes comprehensive systems test –EMI/EMC test plans and procedures complete –Facilities readiness and certification verified –STE and MGSE complete, fabricated, and ready for use –Manpower is sufficient to cover all planned for activities

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 3 Requirements complete  All flight system design analyses and unit testing have been successfully completed –Mission System Spec  433-SPEC-0005 EMI Environments –LAT Environmental Requirements Spec  LAT-SS EMI Environments –LAT Performance Verification Plan  LAT-MD c Verification test definition –EMI Test Plan  LAT-MD  LAT EMI-specific operating modes have been defined –LICOS scripts and supporting displays are identified and in development

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 4 Subsystem EMI/EMC Test Summary

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 5 Radiator Subsystem EMI/EMC Issue  VCHP heater Radiated Emissions testing –S/C power source for LAT VCHP heaters is an unfiltered DC- DC converter. –Concern is the conducted noise for this power source will become radiated emission issue for LAT system test. –This issue shall be resolved by special subsystem (Radiator) test – RE102 – using simulated S/C power source. –The test will be performed just prior to LAT system EMI/EMC test. –Preliminary testing of this at SLAC gives reasonable confidence that there is no significant issue here.

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 6 LAT EMI Test LAT test levels derived from LAT-SS-0778  Test Suite: –CE102 Conducted Emissions, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CE03 –CECM & CEDM Conducted Emissions, Time Domain, 150 MHz Bandwidth –CS102 Conducted Susceptibility, Power Leads, 10 kHz to 10 MHz, MIL-STD- 462, CS02 –CSCM Conducted Susceptibility, Common Mode, 30 Hz to 150 MHz, MIL-STD- 462, CS02 –CS06 Conducted Susceptibility, Spike, Power Leads, MIL-STD-462 –RE101 Radiated Emissions, Magnetic Field, 20 Hz to 50 kHz –RE102 Radiated Emissions, Electric Field, 10 kHz to 18 GHz, MIL-STD-461E –RS101 Radiated Susceptibility, Magnetic Field, 20 Hz to 50 kHz –RS103 Radiated Susceptibility, Electric Field, 30 MHz to 18 GHz  Verify by Analysis: –RS103 Radiated Susceptibility, Electric Field, 18 GHz to 40 GHz –Static Magnetic Field

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 7 LAT Power Interfaces  SC-LAT Power Interfaces –SC PRU (P) - LAT PDU –SC PRU (R) - LAT PDU –SC PRU (P) - LAT SIU (P) –SC PRU (R) - LAT SIU (R) –SC PRU (P) - LAT VCHP +Y Heaters –SC PRU (P) - LAT VCHP –Y Heaters –SC PRU (R) - LAT VCHP +Y Heaters –SC PRU (R) - LAT VCHP –Y Heaters –SC PDU (P) - LAT Makeup Heaters (Survival) –SC PDU (R) - LAT Makeup Heaters (Survival) Heater circuit power interfaces are not tested.

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 8 Test Limitations  RS103 upper limit of 18GHz (40GHz) –18 – 40 GHz addressed by analysis.  Limited area of RS101 test –Requires scanning each 10cm x 10cm area, ~16min/scan –~1450 scans for the LAT, another ~1200 for the radiators (~29 days) –Scan selected locations around connectors, PMTs, BEA  Redundant side testing limited to Conducted Emissions (CE102) and Conducted Susceptibility (CS102)

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 9 Test Sequence  Radiator EMI test  Radiated Emissions  Radiated Susceptibility –Allows maximum time to evaluate data off line before EMI complete  Primary side Conducted Emissions and Susceptibility –Organized to minimize required LAT power cycles  Redundant side Conducted Emissions and Susceptibility –Organized to minimize required LAT power cycles  Time for power cycle is important –Non-optimized CE/CS testing requires 32 LAT power on/off cycles

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of CE & CS Tests TestSystemPrimaryRed.Bands Power cycles CE102SIU+28, Ret. 14 CE102DAQ+28, Ret. 14 CECMSIU+28-Ret.11 CECMDAQ+28-Ret.11 CEDMSIU+28-Ret.11 CEDMDAQ+28-Ret.11 CS102SIU+28, Ret. 28 CS102DAQ+28, Ret. 28 CS06SIU+28-Ret.11 CS06DAQ+28-Ret.11 CSCMSIU+28-Ret.11 CSCMDAQ+28-Ret.11 Total16832

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of Test Durations  Times include test time includes EMI facility set up and calibration, overhead for LAT ops is estimated separately –Schedule allows 11 days or 132 hours

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of EMI Test Configuration  Performed in NRL anechoic chamber –ESD coverings will be removed from sides during active radiated testing. Bags in place for conducted tests, transport and inactive periods. The top of the LAT will remain covered at all times. –GN2 purge to control humidity –Active cooling w/ LAT chiller system Path finder of LAT instrument on the test stand in NRL’s anechoic chamber

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of Test Layout LAT Chiller Connection

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of Conducted Test Considerations  Fully test Primary: –SC PRU (P) - LAT PDU (P) –SC PRU (P) - LAT SIU (P)  Limited test of Redundant: (CE102, CS102) –SC PRU (R) - LAT PDU (R) –SC PRU (R) - LAT SIU (R)  No plan to test PDU - LAT Survival Heaters –Thermostatic control, open circuit at LAT operating temp –Not active with LAT operating in Mission  No plan to test PRU - VCHP Heaters

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of Test Harnesses  Radiated testing will used nominal EGSE cables –Harness is fully shielded Includes all connector savers All test ports are closed out –Fly away test harnesses are shielded Accelerometers TCs & thermistors  Breakout cables required for conducted emissions testing –LAT-DS LSC to RF shield, SIU power –LAT-DS BPU PNL to LSC, SIU power –LAT-DS BPU PNL to LSC, LSC to DAQ, DAQ power

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of Test Software  Emissions Testing – Script # LAT-171 –LAT configured to collect muons with additional periodic trigger to appropriately populate the T&DF data flow and science data stream to the VSC.  Susceptibility Testing – Script # LAT-181: –LAT configured to collect muons with CAL triggers (flight level) and ACD vetos enabled. –Susceptibility monitoring TKR event occupancy CAL pedestal widths (noise) and trigger rates ACD pedestal widths (noise) and veto rates T&DF commanding and data flow errors –Real time monitoring Strip chart of LAT trigger rate and deadtime Diagnostic error messages –Post processing Global TKR occupancy vs time Global CAL, ACD pedestal widths vs time Correlate post processing events with log of frequency vs time

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of Personnel  EMI/EMC Test Director - Michael Lovellette  EMI/EMC Facility Operations –Mike Obara - Test Conductor –Tony Grey - Test Conductor  LAT Instrument Operations –Brian Grist – Operations Lead –Standard LAT I&T Operators and Online analysis support –Anders Borgland – Offline instrument analysis lead –Elliott Bloom – LAT181 analysis lead

GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of EMI/EMC Test Summary  Ready to test –Facility ready to support test –No outstanding issues with subsystem testing except completion of radiator VCHP heater CS / RE verification –Supporting analyses for static magnetic field have been accepted by Blanchette for GLAST project –Supporting analysis for RS – 40 GHz performance is in progress. All subsystems except ACD are complete.