Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 1 Time-Of-Flight in Data Stream in Run 4 and Run 5 Outline  TOF in Run 4  New design.

Slides:



Advertisements
Similar presentations
Tests of CAEN 1190 Multi-hit TDCs Simona Malace Brad Sawatzky and Brian Moffit JLab Hall C Summer Workshop Aug , JLab.
Advertisements

X. DongAug. 5th, 2010 RNC Group Meeting 1 Barrel Time-Of-Flight In Run10 Xin Dong Many thanks to the TOF group.
STAR MRPC TOF: Project Overview BNL January 26, 2006 Geary Eppley Rice University.
1 STAR TOF Calibration. 2 Detectors TPC(TPX) - tracking MRPC TOF (TOFr) – stop time measurement pVPD/upVPD - start time measurement Particle momentum;
Frank Geurts Rice University.  Time-of-Flight in STAR ◦ start & stop detectors in Run 9  Time-of-Flight Calibration ◦ upVPD ◦ Barrel TOF ◦ preliminary.
1 MTD Readout Electronics J. Schambach University of Texas Hefei, March 2011.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
MRPC R&D and production Yongjie Sun Center of Particle Physics and Technology, USTC.
04/11/2008Lijuan Ruan (WWND2008)1 Prototype Performance of Novel Muon Telescope Detector at STAR Outline: Motivation Simulation Intrinsic timing and spatial.
STAR TOF Readout Electronics and DAQ Joachim Schambach University of Texas at Austin For the STAR TOF Collaboration.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
1 TOF Electronics Overview J. Schambach University of Texas DoE Review, BNL, 25 Sep 2006.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Frank Geurts Rice University.  TOF Timing ◦ HPTDC chip ◦ Calibration for HPTDC Non-Linearity  TOF Performance Monitoring ◦ Online Monitoring ◦ Prompt.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
9/26/11HFT soft meeting, BNL1 Chain analysis fz file MuDst.root minimc.root geant.root event.root McEvent.root StMiniMcMaker StAssociationMaker : STAR.
Some notes on ezTree and EMC data in MuDst Marco van Leeuwen, LBNL.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Frank Geurts Rice Univ..  Introducing ◦ barrel TOF and upVPD in Run 9  TOF software ◦ past, present, and future  Calibrations ◦ start, stop, and status.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Time of Flight Analysis Progress on TOF Software Frank Geurts for the TOF group.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
1 MTD Calibration for Cosmic Ray Triggered Data in RUN 10 at STAR Lijuan Ruan (BNL), Liang Li (UT Austin) 04/01/ Workshop on STAR MTD Production.
9 th Workshop on Electronics for LHC Experiments 2 October 2003 P. Antonioli (INFN/Bologna) A 20 ps TDC readout module for the Alice Time of Flight system:
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
高能物理大会 广西桂林 - 11.1 J.WU USTC1 STAR-TOF and Related Physics Outline  Introduction  Performance of STAR-TOF prototypes  Physics results: achieved.
Nov.14-20, 2006 QM2006 Shanghai J.WU USTC1 A barrel TOF for STAR at RHIC Outline  Introduction  Performance of STAR-TOF prototypes  Physics results:
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Y.Fisyak, BNL - STAR Upgrade workshop, 12/2/ Integrated Tracker – STAR tracking framework of the future update on  status and  perspective IT(TF)
Frank Geurts Rice University.  Time-of-Flight in STAR ◦ start & stop detectors in Run 9  Time-of-Flight Calibration ◦ upVPD ◦ barrel TOF ◦ preliminary.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
April 27-29, Hangzhou1 STAR time-of-flight detector Calibration Ming SHAO USTC.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Slides for Xiaoping. LBNL -- 10/9/09STAR Collaboration Meeting2 STAR TOF Offline Analysis Layout STAR/TOF DAQ GSTAR geant hits GSTAR geant hits geometry.
Proposal for large-area high- rate Time-of-Flight and Muon Telescope Detector with MRPC technology for EIC Zhangbu Xu (BNL) BNL, Rice, UCLA, Tsinghua,
Hadron Physics in China & 12 GeV JLab, Lanzhou, July 31, Zebo Tang, USTC Zebo Tang University of Science and Technology of China (USTC) MRPC-TOF.
The STAR MRPC TOF Project BNL December 1, 2005 Geary Eppley, with Jo Schambach, for the TOF Group.
Time of Flight Detectors at RHIC Time of Flight Measurements at RHIC  TOF detector as a PID devices  PHENIX-TOF and BRAHMS-TOF PHENIX Time-of-Flight.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
STAR-MTD March 30 th -April 1 th, 2011 Wang Yi, Tsinghua University 1 Final design and plan for LMRPC production Outline: LMRPC structure.
Performance of Prototype MRPC Detector for STAR Frank Geurts (Rice Univ.) for the STAR TOF collaboration.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
STAR Collaboration meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC analysis update Just to remember … What we have done.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
Light Nuclei Spectra in STAR Run5 62GeV Cu+Cu Experiments Jianhang Zhou Rice University.
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Rainer Stamen, Norman Gee
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
TOF CALIBRATION DATABASE
Hellenic Open University
QUARTIC TDC Development at Univ. of Alberta
10th particle physics conference
Commissioning of the ALICE-PHOS trigger
High time resolution TOF for SoLID
Readout electronics system for Laser TPC prototype
Presentation transcript:

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 1 Time-Of-Flight in Data Stream in Run 4 and Run 5 Outline  TOF in Run 4  New design of TOF for Run 5  Offline software preparation  Summary and outlook Xin Dong University of Science & Technology of China Lawrence Berkeley National Laboratory for the STAR-TOF group

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 2 85ps (~27ps start timing) M. Shao TOF in Run 4 TPC pVPD east pVPD west Au TOFx East-TPC TOFpTOFr x y Au

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 3 TOF detectors performance Timing Resolution (ps) pPVDs TOFr system TOFp system Run 3 200GeV85120 (85) GeV (85)- Run 4 62GeV55105 (89)110 (95) 200GeV FF&RFF, w/o E pVPD 4095 (86)96 (87) FF&RFF2786 (82)92 (88) HF2082 (80)85 (83) (F. Geurts, W.J. Llope, L.J. Ruan, M. Shao, P.R. Sorensen, J.S. Wang)

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 4 TOF Offline Software in Run 4 TOF Data TOF Cell/Slat TOF Hit TOF Collection StEvent MuDst TOF STAR/TOF DAQ TOF Match Maker TOF Calibration Maker TOF DAQ Reader, TOFMaker MuTOFUtil + MuDst Maker StTofPidTraits Data base

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 5 TOF in Run 4 data stream For the Au+Au 200 GeV production: Both raw data and preliminarily calibrated hits are stored in StEvent and MuDst. In StEvent: StTrack -> StTofPidTraits -> tof, beta, nSigmaE (Pi, K, P), etc. for ( primary tracks … ) { … for ( tofhits ) { … StMuTofHit *tofhit = … if (tofhit->associatedTrackId()==trkId) { …. } } // end tof hit loop } // end track loop In MuDst Usage of TOF

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 6 TOF tray in Run 5 1.pVPDs are still used as the start detector to date. 2.TOFp was removed from STAR. 3.A new TOFr tray was built.  All 32 modules were installed in the tray.  They were equipped with new electronics.  The tray was installed in the position where TOFp located last year This year run is an engineering for the test of electronics and DAQ system ! See W.J. Llope’s status report on Thursday

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 7 New design of TOF electronics NIM/CAMAC based local trigger and DAQ systems provided by the TOFp system  TAMP/TDIG/TCPU - digitalization on board with respect to a 40MHz clock  Optical fibers used to STAR DAQ TCPU 1 tray …… TAMP …… TDIG 4 MRPC modules Optical fiber STAR DAQ

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 8 TOF fiber data Fiber data format bit word HPTDCs measured leading and trailing edge timing. Res = 25ps Res = 100ps (Jo Schambach)

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 9 TOF fiber data For Run 5:

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 10 INL correction INL: Integral Non-Linearity correction for HPTDCs Leading Edge HPTDC=0 Trailing Edge HPTDC=3 This correction need to be done for each HPTDC. (Jing Liu)

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 11 Multi-hit in TOF Multi-hit in start timing due to reflection was solved by adding terminators. Multi-hit in stop timing: due to the wide timing window (~26μs) and new electronics. → all particles in this timing window can be recorded. ( only first hit in CAMAC system before) Solution: save all raw TOF hits, leave the selection in offline

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 12 Offline software preparation - I DAQ→TOF_Reader/StTofMaker →StEvent Due to the presence of multi-hits, the basic idea is to save all raw TOF hits into StEvent  StTofRawData is needed --- a raw-TOF-hits collection  push all leading and trailing timing information into this collection TOF Data TOF Cell TOF Hit TOF Collection StEvent STAR/TOF DAQ TOF DAQ Reader, TOFMaker TOF RawData INL correction

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 13 Offline software preparation - II Physics hits selections: TPC track→TOF hit Matching algorithm is the same as before. Multi-hits in the same channel: 1) Event-wise rejection: information from other detectors (ZDC etc.) 2) Track-wise rejection: stable particles hypothesis → at most one best hit in each channel

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 14 Offline software preparation - II TOF Data TOF Cell TOF Hit TOF Collection StEvent STAR/TOF DAQ TOF DAQ Reader, TOFMaker TOF RawData INL correction TOF Match Maker ≤1 hit/channel

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 15 Offline software preparation - III Calibration: Similar calibration procedure as before: One change about slewing correction: ADC (pulse area) before Time-Over-Threshold (width) this year. This has been tried for the start timing from pVPDs. (W.J. Llope) → The start timing resolution is ~ 54ps in Cu+Cu 200 GeV

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 16 Offline software preparation - III TOF Data TOF Cell TOF Hit TOF Collection StEvent STAR/TOF DAQ TOF DAQ Reader, TOFMaker TOF RawData INL correction TOF Match Maker ≤1 hit/channel TOF Calibration Maker StTofPidTraits

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 17 Offline software preparation - IV MuDst: In addition to push TofData and TofHit into MuDst in last year, we would like to save the raw data collection TofRawData into MuDst for check later on. MuEvent MuTracks (primary) MuGlobalTracks …. V0.... MuTofHit (calibrated physical variables) MuTofData ( Tof Data <=1 hit per channel ) MuTofRawData ( Raw Tof Hits w/ multi hits) …

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 18 Summary  TOF physics data are included and can be easily accessed in Run 4 Au+Au production  A new TOF tray with new electronics was installed for Run 5  The first attempt for TAMP/TDIG/TCPU readout with optical fiber path looks successful.  Offline software need update accordingly for Run 5. This is particularly being worked on now.

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 19 STAR TOF group STAR TOF Team: 16 institutions USElectronics, tray assembly and integration China Module construction and QA BNL, LBL, MEPI, NASA, UNAM, RICE, UCLA, UT-Austin, U. Washington, Yale Huazhong Normal University, IHEP(Beijing), IMP(Lanzhou), SINR, Tsinghua, USTC

Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 20 Backup slides